Loading...
CF-Fire Station 3-LR070511 Concrete Compression Test Report eM J ENGINEERING, INC. 7636 Pebble Drive Fort Worth, Texas 76118 Tel: (817) 284-9400 Fax: (817) 589-9993 Report Distribution: (1) Harrison, Walker, & Harper (1) City of Coppell (1) Brinkley Sargent Architects (1) Structural Engenuity (1) Teague, Nail, & Perkins (1) City of Coppell Client: Project: Harrison, Walker, & Harper Police and Fire Renovation City of Coppell CMJ Report No.: 875-6111-062 Report Date: 05/11/2007 Specifications Test Data Strength Slump Air Content Concrete Temperature Ambient Temperature 4000 psi @ 28 Days 3 in min 5 in max 4 % min 6 % max 550 F min 950 F max n/a Placement Date Sampled By Weather Supplier/Mix Air Content Method 04/10/2007 Robert McElvany Cloudy/Misty Redi Mix/728 ASTM C231 Ticket Number: Slump: Concrete Temperature: Placement Location: Sample Location: 59005890 Time Batched: 08:22 Time Sampled: 09:15 4 in Air Content: 4.0 % Unit Weight: n/a 650 F Ambient Temperature: 580 F Yardage (c.y.): Paving Curb And Parking Area's All Along East Edge Of Existing Paving, North East Parking Entire Northeast Parking Concrete Compression Test Results Cylinder Age Max Load Area Strenijth Fracture Set# # Test Date (days) (Ibs. force) (sq.in.) (pSI Type 01 CPF041 00701 04/17/2007 7 107780 28.27 3810 C-cone/shear 01 CPF041 00702 05/08/2007 28 139060 28.27 4920 E-columnar 01 CPF041 00703 05/08/2007 28 140590 28.27 4970 E-columnar 01 CPF041 00704 Hold 28 day average 4950 Normal cylinder size: 6" x 12" Field and laboratory tests by CMJ are per applicable ASTM Standards: C31, C39, C138, C143, C172, C1064, and C617 or C1231. o Gallons Of Water Added On-Site CMJ Engineering, In r--- -..... R. Carl Lee, S.E.T. Vice President/CMT Manager LIMITATIONS: The test results presented in this report apply only to the specific samples, items, and areas described within this report. The test results do not pertain to any other samples, items or areas regardless of similarity. Our reports are produced solely for the exclusive use of our client. This report or any portion of this report may not be reproduced without the written consent of our client and CMJ Engineering, Inc. 01 Page I of I