ST9905-CS070622
Page 1 of 1
Paula Crocker - Fwd: Bethel/Bass Pro
From:
To:
Date:
Sub.iect:
Ken Griffin
Paula Crocker
6/22/20078:54 AM
Fwd: Bethel/Bass Pro
Paula
Give copy to Rick for his review and go ahead and start a change order.
Thanks
ken g
>>> "Robert Caudill" <rcaudill@TiseoPaving.com> 6/21/2007 5: 12 PM >>>
Ken,
This is the revised quote for the 16" RCCP line lowering
1. 16" RCCP spoil ends and manufacturers services Freeport & Bethel Rd.
1 LS @ $3,500.00 = $3,500.00
2. Crew Time (5 to 6 Hrs.)
1 LS @ $2,500.00 = $2,500.00
3. Extra Equipment required Compressor, Pumps, & Shoring
1 LF @ $1,200.00 = $1,200.00
4. Subs Profit & Over Head
1 LS @ $600.00 = $600.00 , ' cJ
<) f{JO 11P
{~;o .
'-[0 , ()()
," f>; /
Robert Caudill (I //
Vice President ///
Tiseo Paving Company, ~.,..
(972) 289-0723 "-
Total
Sub Total
Tiseo 1 0%
fil e:/ /C: \Documents%2 Oand%20Settings \PCROCKER \Local %20Settings \ Temp \XP grpwis... 6/22/2 00 7