LETTER OF TRANSMITT AL
July 18,2007 -
RE: Bethel Road - Coppell
City of Coppell
P.O. Box 9478
Coppell, TX 75019
ECS Job # 19:5061
Permits:
A TTN: Mr. Rick O'Dell
Location: Bethel Road
Coppell, TX
We are enclosing:
-L Materials Engineering Division Reports
X For \lour llse
- .
-X- As requesred
CC: TISEO Paving - Robert Caudill
ENCL:
Field Report # 54
07/12/2007
,/} /?~r
-c-_-i4tk~=<.
DaVId A. "LewIs, .E.
Principal Engmeer
( ~. I r
:::;? -~+.~~'..kJt<{ <93_ ;;\
Siddharth Neekhra
Project Engineer
.u:-19-2007 08:18
9723920102
From-
'~
(, . ,c'c'~i'::'i':''1'\1~'u ECS Texas, LLP
E. 4950 Kell&r Sprln~ Road, Sul18 480
Addison. TX 75001
Lrot. (972) 392-3222
.~_..~~ (FAX) 392-0102
L~~~..~',~~:,:.iJ
L~' 00 ":1:!!U'&s~
PrOject No.
Report No
Day & Date
Weat/ler
On-Site Time
;-649 P 003/004 F-503
FIELD REPORT
PrOject
Location
Bethel Road - Coppell
Coppell, TX
City of Coppell - Rick O'Dell
Cller1!
Lab Time
Remarks
T(ip Charges. 18.00 Tolls/Parking"
Chargeable !tems Nuclear Gauge Rental
Travel Time.
Total
Re Obs,Time
19:5061
54
Thursday 07/12/2007
880/ Sunny
1.00
0.00
1.00
2.00
0.00
Mileagew
Time of Arrival Departure
IO:30A 11;30A
.. Travel time and mileage will be billed in accordance wilh tbe contract
Summary of Se"",lces Perlormed {field te,t data. locations, elevations & depths aro e&tlmalesl & tndlvldLJals Contactod.
Soil Compaction:
The undersigned arrived on site, as requested, to observe the placement and compaction of
soils for backfill.
Utilizing the Nuclear Method (ASTM D-2922) to check the compaction of soils, test results
indicated that the compacted material, at the areas and elevations tested, met Or exceeded the
project requirements of 95%+ of the maximum dry density as obtained in Otlr laboratory using
the Standard Proctor Method (ASTM D-698).
The soils observed on this dare appeared to be placed in compliance with project dra'\oings
and specifications with regard to lift thickness and moismre content.
By Dl\igbt Goldy,- Senior Field Technician
1800
B69CS
Ju!-i9-2007 08:19
From-
9723920102
T-649 P 004/004 F-503
mL
, .A h. ~ . . ~ .
~~
Geotechnical' ConsUucuon Materials . Env~onmentl\1
4')50 Keller Springs Road, SWtt: 480. ^dQj~ol1.TelCas 75001
972 3923222 - FAX 972392 0102
Project:
Contractor:
Technician:
REPORT OF FIELD DENSITY TESTS
Bethel Road - Coppell Report #:
Project #:
D. Goldy Date:
Page:
54
5061
7/12/07
1 of 1
PrOtf. ASTM Maximum Dry Optimum ,
De~cription I
No. Stand. Density (pet) Moisture 0/0
1246 D-698 Dark Gray Clay w/ran Clay 94.5 22.5
;
-=~___t---_. . I I ,
Project Specifications I 2 3
!
";.. Compaction 95%+ 93-98% 95%+
.---, ,
Moisture % -2 to +3% of Optimum +3% of optimum, or above AI, or above optimum
Depth ,
Density Field I Compo
Test Location Ref Spec Below Moist. Proc. Le,,'eJ Comply
No. No. Final Dry Wet (%) ID (%) YIN
SG (ft)
\ SUi 1+75 1 3 -6.0 90.0 1116 240 1246 952 y
l
.._---~---
2 Sta. 2-t50 1 3 -4.0 : 90.7 1121 23.6 1246 95.9 , y
-- .2.....t~':.3+00 J 3 -1.0 91.3 112.3 230 1'246 966 Y i
f--. , I ,I
.
I : I-.+J~
, j
---------.--.--
I
~_.__.__40..___.____~~~_ I .
t---t--- i
,
i -+--+--
I
-- -1--
- ---.----..--.----- - ~--
I !
- -
!
------- , ~~-.
I ! I :
_. ! 1-'-1-'1
;
,
__Re~ine B
! 2)
.-.---.-- .c-n---.--.---
3)
4)