FIELD REPORT
Project No.
Report No.
Day 8. Date
Weather
On-Site Time
Lab Time
Travel Time~
Total
Re Obs,Time
,,..~ .\tlac~"W
PrOject
Location
Bethel Road - Coppel!
Coppcll, TX
City of Coppell - Rkk O'Dell
Cll6'lt
RemarKs
19:5061
45
Thursday OS/24/2007
760; Cloudy
1.00
0.00
1.00
2.00
0.00
Trip Charge6~
Chargeable Items
18.00
Tolls/Parklng~
Mileage-
Time of Arnval Departure
02:00P 03:00P
~ TTllvd time and mileage will be billed in accordance WIth the ,'on\rad,
Summary of ServiCes Performed (field lIlst data, 10callons, elewtlons & depths ire estimates) & Individuals Contacted.
Concrete Placement Observation:
The undersigned arrived on site, as requested, to observe the placement of 8 cubic yards of
4000 psi concrete for reraining wall.
Concrete observed on this date appeared to be placed in compliance with project
specifications with regard to temperature, slump, air content, and batch to placement rime.
1 set of 4 cylinders (4000 psi) was cast for compressive strength testing in ECS' laboratory.
By Larry Reid, - Fjeld Technician
1800
~ a ~I::' S
c.~~~---=-:;-'::---~I FCS Texas. LLP
J9S0 Keller Springs Road, Suite 48U
Addi~on, TX 750Ul
(972) 392-3222
(FAX) 392-0102
LETTER OF TRANSMITT AL
May 24. 2007
RE: Bethel Road - Coppell
City of Coppell
P.O. Box 9478
CoppelL TX 75019
ECS Job # 19:5061
Permits:
A TTN: Mr Rick O'Dell
Location: Bethel Road
Coppell, TX
We are enclosing:
-L Materials Engineering Division Reports
-L For your use
_ X_ As requested
CC: TISEO Paving. Robert Caudill
ENCL:
field RepOlt # 44
05123/2007
-Q~~
Dame! Franklin, P.E.
President /Principal Engineer
<7~ /)
/' P
_..""~-~_../-... ~:;t;f~~--y-
J' . n Allen, SET
.." Construction Services Manager
-~~..-.
vvl-~ €00/200 d 909-1
201026€216
-WOJ~
vv:Sl 1002-v2-^e~
I. '." " 'I'" EeS Texas. LLP
ED' :s - .... ""'~, s."... Ro.', ."" ..,
Addl"on, TX 75001
, (912) 39203222
Ll~ (FAX)392-0102
,; I
'lln:~'~k~A~~
FIELD REPORT
Project No
Report No
Day 8. Date
Weather
On-Site Time
Lab Time
Travel Time'
Total
Re ObsTlme
PrOject Bethel Road - Coppell
Location Coppell, TX
Client City of Coppell - Rick O'Dell
Remarks
Trip Charges' 18.00
Chargeab:e Items
19:5061
44
Wednesday OS/23/2007
7001 Cloudy
0.50
0.00
1.00
1.50
0.00
Mileage'
Time of Arrival Departure
07:00A 07:30A
Toils/Parking'
· Travel time and mileage will be billed in accordance with the contract.
Summary of Services Performec1 {fleld est data. locallons. elevations & depths are estlmef8sl & Individuals ConL1lctBd.
Concrete Cylinder Pick-up:
The undersigned arrived on site to retrieve concrete cylinders molded on a previous date
The test cylinders were found to be undisturbed and were taken to ECS for curing and
compressive strength testing.
1 set of 4 cy linders was picked up on this date.
By Danny Mizc. - Senior Field Tecbnician