Loading...
ST9905-LR070416 (2) ECS Texas, LLP 4950 KdlO" Springs Road, Suite 480 Addison, TX 7500 I (972) 392-3222 (FAX)392-0102 CONCRETE, GROUT, AND MORTAR TESTS LETTER OF TRANSMITTAL ~ _11!XM TO: City of Coppell P,O. Box 9478 DA TE: 04/16/2008 RE: Bethel Road - Coppell Coppell, TX 75019 A TTN: Ms. Carol Dye PERMIT #: JOB NO.: 005061 LOCA TION: Bethel Road, Coppell, TX We are enclosing: X Attached l For Your Use X Materials Engineering Division Concrete Reports: 144, 146 X As Requested CC: TISEO Paving - Robert Caudill City ofCoppell- Rick O'Dell By: David A. Lewis, P.E. Principal Engineer Project: Location: Bethel Road - Coppell Bethel Road, Coppell, TX Concrete Cylinders Strength Report Project: 5061 Set Designation: A Cast Date: 04/08/2008 Design Strength: 4000 psi Report No.: 144 ~ . ECS Texlti, LLP 4950 Keller Springs Road, SUite 480 Addison, TX 7500 I (972) 392-3222 (FAX)392-0102 Owner: City ofCoppell- Carol Dye Arch.: Struc. Eng.: Client: City of Coppell - Kenneth M. Griffin, Gen. Contr.: Cone. Contr.: Placement Location: Box culvert top from approximate stations 52+00 to 53+00, Sampled approximately Station 52+40 Concrete Supplier: LMC Mix Designation: 1851 Added Water: 10 Gals, Truck No: 1111 Mix Strength: 4000 psi Time Added: 02:35PM Ticket No: 3246980 Batch Time: 1 :52PM Unit Wt.: FIE! J) TEST DA TA' Tested by:Michael J. Cochran Temperature - Air: 900 F Time Sampled:02:50PM Concrete: 850 F Slump: 8.00 in. Air Content: 3.50 % (P) Sample Test Test Type Diameter Area Breaking Compr. Brk Break Review No Date Age Cure In. In.2 Load,lbs Str.,psi Typ by by 39888 04/1 5/2008 7 Lab 4.00 12.56 53856 4290 ELB1 39889 04/1 5/2008 7 Lab 4.00 12.56 52480 4180 ELB1 39890 05/06/2008 28 Lab 4.00 12.56 39891 05/06/2008 28 Lab 4.00 12.56 39892 05/06/2008 28 Lab 4.00 12.56 39893 06/03/2008 56 Lab 4.00 12.56 . . SafTll~g n aooordanoe wlh (llIw) ASTM C 172, exoeptthatsafTllles may have been laken from the begnnngof the bad aftera mmrum discharge of approxmate~ onecubc yard. Cyilder making and aboratorycumg aw ASTM C31, cofTllressi.le strength test and break type aw ASTM C39,sufTll iaw C143,ar contentiawPSTM C173 M or C231 (P), tefTlleratullliaw ASTM CI064,andunl weghtiaw PSTM C138. Cyilders are tested usilg unbonde<tapsiaw ASTM C12310r are capped usilg sulphur martariaw C617. BreakTypesare c1assiflld as:Type 1, 2,3,4,5, or6 iawC39-04a FIELD CURING CONDITIONS: Curing Box X No Curing Box Remarks: Insulated Heated Cooled X Caps Ice Other Final Review By: ELB1 Print Date: 04/16/2008 Project: Location: Bethel Road - Coppell Bethel Road, Coppell, TX Concrete Cylinders Strength Report Project: 5061 Set Designation: A Cast Date: 04/12/2008 Design Strength: 4500 psi Report No.: 146 - ECS Tex"" LLP ~ 4950 Keller Springs Road, Suite 480 AddISon, TX 75001 (972) 392-3222 (FAX)392-0102 Owner: City ofCoppell- Carol Dye Arch.: Struc. Eng.: Client: City of Coppell - Kenneth M. Griffin, Gen. Contr.: Cone. Contr.: Placement Location: Paving, SW comer of Bethel and Freeport, 50'N x 25'E of manhole cover Concrete Supplier: Tiseo Paving Company Mix Designation: 2488H Added Water: Truck No: Mix Strength: 4500 psi Time Added: Ticket No: Batch Time: 07:06AM Unit Wt.: FIEI,O TE<;T OA TA' Tested by:David M. Ellison Temperature - Air: 520 F Time Sampled:08:00AM Concrete: 720 F Slump: 4.50 in. Air Content:4.30 % (P) Sample Test Test Type Diamere- Area Breaking Compr. Brk Break Review No Date Age Cure In. In.' Load,lbs Str.,psi Typ by by 39937 04/15/2008 3 Lab 4.00 ]2.56 48640 3870 ELB1 39938 04/19/2008 7 Lab 4.00 12.56 39939 04/19/2008 7 Lab 4.00 12.56 39940 05/1 0/2008 28 Lab 4.00 12.56 3994] 05/ I 0/2008 28 Lab 4.00 12.56 39942 05/1 0/2008 28 Lab 4.00 12.56 39943 06/07/2008 56 Lab 4.00 12.56 Salfll"g n aa:ordance wlh (aw) ASTM C172, except Ihat salfllles may hallll been taken lrom the begnnngol the load aflera mnl!lJm discha'1le 01 approxmatet( oneaJbk: yard. C~der mokiilg and IaboratoryaJmg iaw ASTM C3l, colfllre_ strength test and break type iaw ASTM C39,sIJlfll iaw C143,arcontentiaw ASTM C173(V) orC23l(p), telflleratureiaw ASTM Cl064,andunl weightiaw ASTM C13B. C~delS are tested usilg unbonde<i:apsiaw ASTM C12310r are capped usilg su~hur mortariaw C6l? Break Types are classified as: Type 1,2,3,4,5, or6 iawC39-04a FIELD CURING CONDITIONS: Curing Box X NoCuring Box Remarks: Insulated Heated Cooled X Caps Ice Other Final Review By: ELB] Print Date: 04/16/2008 '" ECS Texas. LLP ~ 4950 Keller Springs Road, Suite 480 Addison, TX 75001 LLP (972) 392-3222 (FAX) 392-0102 TEXAS LETTER OF TRANSMITTAL April 16, 2008 RE: Bethel Road - CoppelI City of Coppell P.O. Box 9478 Coppell, TX 75019 A TTN: Ms. Carol Dye ECS Job # 19:5061 Permits: Location: Bethel Road Coppell, TX We are enclosing: ~ Materials Engineering Division Reports ~ For your use ~ As requested CC: TISEO Paving - Robert Caudill City of CoppelI - Rick O'Dell ENCL: Field Report # 171 04/15/2008 ;JJi/ ~~, Dt\Vid A. LewIs, P.E. Principal Engineer ~ ~cL- Eric L. Branch, C.E.T. Project Manager ... ECS Texas. LLP E. 4950 Keller Springs Road, Suite 480 Addison, TX 75001 . ... (972) 392-3222 ..-.r (FAX)392-0102 FIELD REPORT Project No. Report No. Day & Date Weather On-Site Time Lab Time Travel Time* Total Re Obs. Time TI!!XA.8 Project Bethel Road - Coppell Location Coppell, TX Client City of Coppell - Carol Dye Remarks 19:5061 171 Tuesday 04/15/2008 750/ Sunny 1.25 0.00 1.00 2.25 0.00 Trip Charges* Chargeable Items 18.00 Tolls/Parking* $0.80 Mileage* Time of Arrival Departure 1O:15A 11:30A * Travel time and mileage will be billed in accordance with the contract. Summary of Services Performed (field test data, iocations, elevations & depths are estimates) & individuals Contacted. The undersigned arrived on site, as requested, to observe: 1. The placement of 10 cubic yards of 4000 psi concrete for for stamped concrete paving ath the intersection of Bethel and Freeport. The required test limits were determined to be a slump of 3-5 inches, air content of 4.5-6%, batch to placement time of <90 minutes, and concrete temperature range of <90 degrees Fahrenheit. Concrete observed on this date appeared to be placed in compliance with project specifications with regard to temperature, slump, and batch to placement time. The air content was less than the project specifications. The following samples were obtained for compressive strength testing in our laboratory: SetA: 1 set of 6 lab cylinders (4000 psi) for paving NOTE: The undersigned called Mr. O'Dell when leaving for the site at 10:00am. Mr. O'Dell said the pour was beginning at 11 :OOam. Upon arriving on-site at 1 0:30am, the undersigned saw that the pour had begun. 1 set of 6 cylinders was cast. After the report was uploaded, Mr. O'Dell called to request a 3-day break on Friday. By Michael J. Cochran, - Field Technician 1800 94729