Loading...
ST9905-LR070408 ... ECS Texas. LLP ~. 4950 Keller Springs Road, Suite 480 Addison, TX 75001 LJ.p (972) 392-3222 (FAX) 392-0102 FIELD REPORT Project No. Report No. Day & Date Weather On-Site Time Lab Time Travel Time* Total Re Obs.Time TI!!XA8 Project Bethel Road - Coppell Location Coppell, TX Client City of Coppell - Carol Dye Remarks 19:5061 168 Tuesday 04/08/2008 900/ Cloudy 1.75 0.00 1.00 2.75 0.00 Trip Charges* 18.00 Chargeable Items T olis/Parking* Mileage* Time of Arrival Departure 01:45P 03:30P * Travel time and mileage will be billed in accordance with the contract. Summary of Services Performed (field test data, locations, elevations & depths are estimates) & Individuals Contacted. The undersigned arrived on site, as requested, to observe: 1. The placement of 60 cubic yards of 4000 psi concrete for box culvert top. The required test limits were determined to be a slump of 3-5 inches, air content of 3-6%, batch to placement time of <90 minutes, and concrete temperature range of <90 degrees Fahrenheit. Concrete observed on this date appeared to be placed in compliance with project specifications with regard to temperature, air content, and time to placement. Trent with IBC was informed of the excessive slump (8 inches) The following samples were obtained for compressive strength testing in our laboratory: SetA: 1 set of 6 lab cylinders (4000 psi) for box culvert top By Michael J. Cochran, - Field Technician 1800 94611