DR9002-CS 880712 (2)CITY OF COPPELL
CITY ENGINEER
FOLLOWUP ACTION
FOR
JULY 12, 1988 STORM
Called on all reported flooding situations (see attached list),
informed them we are investigating all complaints and will
fcllowup. Referred to City Secretary's Office for damage claims.
Notified Design Engineer for the Pelican Lane flooding.
Recieved Police Department List (7-14-88) and Public Works
Department List (7-15-88). (ATTACHED)
Per the Public Works Department, confirmed that all Drainage
Systems wereoperational.
Consulting staff and Giun, Inc. on problem areas.
Received varied reports'on rainfall from 2%" to 4%" (over 4" would
have been a greater that 100 year rain fall for one hour).
(Will Document)
.41" -
4½" -
3.10" -
Weather Bureau (@ DFW Airport)
S. Holly Street
Fire Department
Public Works Service Center
7/12/88-STORM
MEMO1