Loading...
Vista Point 2R-LR070523 (2) REED EnGinEERinG GEOTECHNICAL AND G R CJ LJ F' ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Vista Point II, Phase II S.H. 121 at MacArthur Boulevard Coppell, Texas REPORTED TO: Bullard Construction, Inc. P.O. Box 575 Addison, Texas 75001 ATTN: Mr. Keith McMahon REPORT NO. 123 REG PROJECT NO. 13581 SAMPLE DATE: 05-23-07 TECHNICIAN: Contractor PAGE: 1 of 1 CONTRACTOR: Bullard Construction, Inc. Location of Sam Ie Set Number Location 1 Sidewalk Mix Identification NA ecified Stren 3000 Date Tested 05-30-07 06-20-07 06-20-07 Hold Age@ Test 7 28 28 H Total Load Ibs. 59540 Cylinder 10 3948 Air Entrainment NA Ticket Number NA Extranet Distribution: (1) Jackson Shaw Companyl Mr. Christopher Gardner (1) AECC, Inc.lMr. Todd Waters (1) Jackson Shaw Company Ms. Michelle Graham Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Mail Distribution: (1) Bullard Construction, Inc.l Mr. Keith McMahon (1) City of Coppell/Mr. Keith Marvin Mickey Lawson Assistant Manager, CMT MLlrt 2424 STUTZ DR. . SUITE 400 . DALLAS, TX 75235 . TEl [214] 3505600 . FAX [214] 3500019