Vista Point 2R-LR070523 (2)
REED EnGinEERinG
GEOTECHNICAL AND G R CJ LJ F'
ENVIRONMENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
Vista Point II, Phase II
S.H. 121 at MacArthur Boulevard
Coppell, Texas
REPORTED TO: Bullard Construction, Inc.
P.O. Box 575
Addison, Texas 75001
ATTN: Mr. Keith McMahon
REPORT NO. 123
REG PROJECT NO. 13581
SAMPLE DATE: 05-23-07
TECHNICIAN: Contractor
PAGE: 1 of 1
CONTRACTOR: Bullard Construction, Inc.
Location of Sam Ie
Set Number Location
1 Sidewalk
Mix Identification
NA
ecified Stren
3000
Date Tested
05-30-07
06-20-07
06-20-07
Hold
Age@
Test
7
28
28
H
Total Load
Ibs.
59540
Cylinder
10
3948
Air
Entrainment
NA
Ticket
Number
NA
Extranet
Distribution: (1) Jackson Shaw Companyl
Mr. Christopher Gardner
(1) AECC, Inc.lMr. Todd Waters
(1) Jackson Shaw Company
Ms. Michelle Graham
Submitted by:
REED ENGINEERING GROUP, LTD.
Original Signed By
Mail
Distribution: (1) Bullard Construction, Inc.l
Mr. Keith McMahon
(1) City of Coppell/Mr. Keith Marvin
Mickey Lawson
Assistant Manager, CMT
MLlrt
2424 STUTZ DR. . SUITE 400 . DALLAS, TX 75235 . TEl [214] 3505600 . FAX [214] 3500019