Loading...
DR9303-CS 930519 ~ L/ ~ --//.____--.~/[~--~/,=r-~!~ P.O BOX 478 ~ /~ ~ ~"~'~ Coppall. Texas 75019 The C~ty With A Beautiful Future 214~62~22 May 19, 1993 Mr. Glen Fabion TU Electric 1015 Hutton Carrollton, TX 75006 RE: Moore Road Drainage DR 93-03 Dear Mr. Fabion: Enclosed please find two sets of plans for the referenced drainage project. This project consists of placing a drainage system along Moore Road from Sandy Lake Road north to the existing concrete channel on the west side of Moore Road. The exact location of the drainage system will be determined once the utility locations have been marked and submitted to the City. Please review and mark-up these plans with your utility locations and resubmit one set of plans back to the City with any comments as soon as possible. Please keep one copy for your records. Also, please comment as to any precautions that should be taken to protect your utilities. If I can answer any additional questions please feel free to contact me at your convenience. Sincerely, City Engim~ cc: Mike Martin, E.I.T. Doug Stevens, Engineering Technician file/~griffin/utility.ltr Letter sent to: Lone Star Gas Company Willie Watson Gas Distribution 310 N. Rogers Irving, TX 75061 Lone Star Gas Company Phil Sanders Gas Transmission 1931 E. Sixth St. Irving, TX 75060 TU Electric Glen Fabion 1015 Hutton Carrollton, TX 75006 GTE Mr. Jerry Davis 2143 N. Stemmons Lewisville, TX 75067 Paragon Cable Mr. Bill Morgan Mr. Donnie Dunn 209 S. Rogers Irving, TX 75060 Howard Pafford Public Works Department City of Coppell MEMORANDUM To: Howard Pafford, Water Superintendent From: Kenneth M. Griffin P.E., City Engineer ~ RE: Moore Road Drainage DR 93-03 Date: May 19, 1993 Enclosed please find two sets of plans for the referenced drainage project. This project consists of placing a drainage system along Moore Road from Sandy I~ke Road north to the existing concrete channel on the west side of Moore Road. The exact location of the drainage system will be determined once the utility locations have been marked and submitted to the Engineer Department. Please review and mark-up these plans with your utility locations and resubmit one set of plans back to the Engineering Department with any comments as soon as possible. Please keep one copy for your records. Also, please comment as to any precautions that should be taken to protect your utilities. If I can answer any additional questions please feel free to contact me at your convenience.