Loading...
WA9601B-LR 990827 ~""'~BC',LT'J Engineering Co, 9200 King Arthur Drive Dallas, Texas 75247-3610 Phone 214/631-4372 Fax 214/631-4380 Mr. Kenneth Griffin, P.E. Project No.: 1520COP01 City of Coppel! Project: Sandy Lake Road 255 Parkway Boulevard Location: Utility Trench Backfill Post Office Box 478 Report No.: 30/0690 Coppell; Texas 75019-4409 RESULTS OF FIELD DENSITY TESTS TEST DATE RETEST TEST LOCATION LIFT/ PROCTOR FIELD FIELD PERCENT NO. OF DEPTH TEST DENSITY MOISTURE OF TEST NO. PCF % SPECIFIED NUMBER COMPACTION 75 08/27/99 24" Water Line Backfill @ Sta. 31+70 -5' 4 117.5 13.2 98.7 76 08/27/99 24" Water Line Backfill @ Sta. 9+30 -4' 1 107.8 18.1 97.6 77 08/2?/99 24" Water Line Backfill @ Sta. 15+25 -3' 1 108.3 17.5 98.1 TESTS PERFORMED BY: Roger Mannette TEST METHODS: ASTM D 2922, D 3017, D 1558, D2167 OR D 293? REMARKS: PROCTOR NO.: 1 - 110.4 pcf @ 15.6% Moisture 2 - 104.7 pcf~ 13.9% Moisture 3 - 107.6 pcf~ 17.3% Moisture 4 - 119.0 pcf@ 12.3% Moisture Average of#1 and #4 - 115.1 pcf@ 13.9% Moisture 5 - 114.9 pcf@ 13.6% Moisture SPECIFICATION: 95% Compaction @ Optimum to +5% DISTRIBUTION: PAGE 1 OF 1 OUR LETTERS AND RiEPORTS ARE FOR THE EXCLUSIVE USE OF THE CLIENt TO WHOM THEY ARE ADDRESSED. AND APPLY ONLy TO THE SAMPLES TESTED.