DR9303-CS 930128
Phase 2 consists of projects which may be funded, at least in part by the second sale of bonds
for the fiscal year 1991-1992.
Stream G6
(NLWE)
~. Stream G1
~ ~./ /~ Grapevine Creek
'.~ Grapevine Creek
Denton Creek
Site D
Site D
Site L
Site I
Section S.2
Bethel School Road; Channel; $170,000
and Culverts
Loch Lane Channel Improvements $ 31,000
Erosion-Unnamed Grapevine Creek $ 7,000
Trib at Meadowcreek Dr.
Erosion-Unnamed Grapevine Creek $ 83,000
Trib Downstream of Meadowcreek Dr.
Andrew Brown Park Spillway $ 35,000~
Kaye Street (South) $111,000:
Cozby Circle $ 17,0002
Moore Road - Austin Property $ 28,0002
and Town Creek Apartment Flooding
Swan Drive $ 30,000
Fieldcrest Loop $ 61,250~a
TOTAL PHASE 2 $ S73,2S0
Parks and Recreation Department
Possible cost sharing with property owners
Estimated cost from 'Preliminavj Engineering Study for Drainage Problems on Fieldcrest
Loop' by Ginn, Inc. July 14, 1989.
Phases 1 and 2 represent over one million dollars in improvements to the drainage systems
within the City of Coppell. The majority of these projects may be funded with the previously approved
drainage improvement funds included in thc 1990 bond package. However, sources of additional funding
should bo pursued by city staff. Projects such as Fieldcrest Loop, Kaye Street (south) and Cozby Circle should
be funded at least in part by the property owners with city staff taking the lead in coordination and
construction supervision. For example, the Cozby Circle drainage improvements on the individual lots could
be funded either by the home owner or by the developer of the Cooper Road lots while the City funds the
design and construction of the connection into the existing storm sewer inlet on Anderson Avenue. Other
projects, such as, the Sandy Knoll/Woodhurst subgrade failure and the Andrew Brown Park Spillway should
be funded under street repair and Parks and Recreation funds, respectively.
VIII-4
private funding.
Phase 3 consists of projects wMch have a high priority but may require additional public or
Grapevine Creek Erosion - Denton Tap Road to $1,350,000:
Moore Road
Stream G3 Meadowcreek Road Improvements $ 29,000
Stream G4 Meadowcreek Road Improvements $ 53,000
Site P Mapleleaf Lane - Stage I $ 49,000
Stream G6 Moore Rd. Erosion Protection $ 230,000
(NLWE)
Stream G5
Erosion Protection & Grading $ 7,000
(Carter Rd. & Christi Ln.)
Stream G2 Erosion Protection behind
Plantation Dr. residences
$ 2~,000~
Site F Cottonwood Estates/Summer $ 42,000
Place Addition
Stream G1
Freeport Parkway/Bethel Road $ 69,0005
Intersection (Coppell Commerce Center)
Cottonwood Branch Andrew Brown Park Berm
$ 35,000z
Site E Golden Triangle Mobile Home Park $ 90,000~
TOTAL PHASE 3 $1,9#0,0~0
Possible cost sharing with property owners, developers and builders.
Parks and recreation funding.