Loading...
DR9303-CS 930128 Phase 2 consists of projects which may be funded, at least in part by the second sale of bonds for the fiscal year 1991-1992. Stream G6 (NLWE) ~. Stream G1 ~ ~./ /~ Grapevine Creek '.~ Grapevine Creek Denton Creek Site D Site D Site L Site I Section S.2 Bethel School Road; Channel; $170,000 and Culverts Loch Lane Channel Improvements $ 31,000 Erosion-Unnamed Grapevine Creek $ 7,000 Trib at Meadowcreek Dr. Erosion-Unnamed Grapevine Creek $ 83,000 Trib Downstream of Meadowcreek Dr. Andrew Brown Park Spillway $ 35,000~ Kaye Street (South) $111,000: Cozby Circle $ 17,0002 Moore Road - Austin Property $ 28,0002 and Town Creek Apartment Flooding Swan Drive $ 30,000 Fieldcrest Loop $ 61,250~a TOTAL PHASE 2 $ S73,2S0 Parks and Recreation Department Possible cost sharing with property owners Estimated cost from 'Preliminavj Engineering Study for Drainage Problems on Fieldcrest Loop' by Ginn, Inc. July 14, 1989. Phases 1 and 2 represent over one million dollars in improvements to the drainage systems within the City of Coppell. The majority of these projects may be funded with the previously approved drainage improvement funds included in thc 1990 bond package. However, sources of additional funding should bo pursued by city staff. Projects such as Fieldcrest Loop, Kaye Street (south) and Cozby Circle should be funded at least in part by the property owners with city staff taking the lead in coordination and construction supervision. For example, the Cozby Circle drainage improvements on the individual lots could be funded either by the home owner or by the developer of the Cooper Road lots while the City funds the design and construction of the connection into the existing storm sewer inlet on Anderson Avenue. Other projects, such as, the Sandy Knoll/Woodhurst subgrade failure and the Andrew Brown Park Spillway should be funded under street repair and Parks and Recreation funds, respectively. VIII-4 private funding. Phase 3 consists of projects wMch have a high priority but may require additional public or Grapevine Creek Erosion - Denton Tap Road to $1,350,000: Moore Road Stream G3 Meadowcreek Road Improvements $ 29,000 Stream G4 Meadowcreek Road Improvements $ 53,000 Site P Mapleleaf Lane - Stage I $ 49,000 Stream G6 Moore Rd. Erosion Protection $ 230,000 (NLWE) Stream G5 Erosion Protection & Grading $ 7,000 (Carter Rd. & Christi Ln.) Stream G2 Erosion Protection behind Plantation Dr. residences $ 2~,000~ Site F Cottonwood Estates/Summer $ 42,000 Place Addition Stream G1 Freeport Parkway/Bethel Road $ 69,0005 Intersection (Coppell Commerce Center) Cottonwood Branch Andrew Brown Park Berm $ 35,000z Site E Golden Triangle Mobile Home Park $ 90,000~ TOTAL PHASE 3 $1,9#0,0~0 Possible cost sharing with property owners, developers and builders. Parks and recreation funding. VIII-5 (NLWE) II II II II II II .)