Loading...
Stringfellow 9A-CS080922 THE.CITY.OF COPPELL ~, "* ~/CC, ~... " I: .t f\ Ii September 22, 2008 Daniel Heischman Dowdey, Anderson & Associates, Inc. 5225 Village Creek Drive, Suite 200 PIano, Texas 75093 RE: Stringfellow Addn., Lot 9 Block A (Vision Center) Construction Plan Review Comments Dear Mr. Heischman: The City of Coppell has reviewed the revised plans for the referenced addition and they have been approved. The City of Coppell requires three sets of final construction plans for its use; your office should submit as many additional sets for stamping as is necessary for construction operations. All contractors and subcontractors onsite must have a copy of the plans approved by the City of Coppell along with a copy of the City's standard construction details. All fees must be paid prior to release of this project for construction. The City charges a 2% inspection fee for all private construction outside the building's footprint. This includes dirt work, paving, storm drains, water lines, sewer lines, drainage pipes, etc. that are private. For all installations in the public right-of-way or easement, the City charges a 4% fee. A check for inspection fees made to the City of Coppell should be submitted to this office along with the Construction Development Permit Application and a copy of the Construction Site Notice. For your convenience a spreadsheet is attached to the permit application for use in calculating the inspection fees. A copy of the contract(s) should be attached for verification purposes. If you have any questions, please contact me at your convemence. Sincerely, ~arza, E.I.T Graduate Engineer Office Phone: (972) 304-3679 Fax: (972) 304-3570 E-mail: mgarza@cLcoppell.tx.us 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673