Loading...
Chateaus-LR080915 Rc>ne E;oi=a 8908 Ambassador Row, Dalla, TX 75247 7701 W Little York, Ste 800, Houston, TX 77040 4421 Freldrlch, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Client: CTM-Coppell, LLC clo Lenart Development Co., LLC Report No.: 332325 4601 Old Shepard Place Project No.: 0814523 Piano, T~:::~;~} Date of Service: 09/05/2008 /~~ 'J Report Date: 09/15/2008 -~~;' ,/' Project:p~pfeaus of Coppell/' Services: Obtain samples of fresl:l.e6ncrete at the placement locations, perform required testing, cast compressive strength samples and bring ,s~mples back to t"lB6oratory for curing and testing in accordance with applicable standards. "'----~~ PROJECT DATA Contractor: Concrete Supplier: LMC Plant: 7 Specification Requirements Strength: 4,200 psi @ 28 days Slump (in.): 2" - 4" Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design 1.0.: 1701 Placement Date: 09/05/2008 Weather Conditions: Sunny, windy Time Sampled: 03:45pm Batch time: 03:00pm Temperature - Air: 850F Concrete: 780F Truck No: 9104 Ticket No: 7197701 Air Content: NA Unit Weight (pet): NA Overall Placement Location: Inlet side wall line A1, Station 1+75, inlet bottom A12 and A13, and sidewall for inlet A3 and A4 Measured Slump (inches) 4.0 Sample Location: Same as above REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date ~ Diameter Area Load Strength Fracture Set No. Tested (In) (In2) (Ibs) (psi) Type 1 1 09/12/2008 5.99 28.18 94,440 3,350 Type2 2 10/03/2008 28 3 10/03/2008 28 4 10/31/2008 56 ~~ ~g] ~ E] DO 0 Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 nle 7/17)21) i () LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (GD/eL) Page 1 of 2 RQne EnS=:= 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrlch, S18 195, Austin, TX 78744 Corporate Phone: (2t4) 630-9745 Report of Concrete Compressive Strength Test Client: CTM-Coppell, LLC clo Lenart Development Co., LLC Report No.: 330523 4601 Old Shepard Place Project No.: 0814523 Piano, TX 75093 Date of Service: 08/14/2008 Report Date: 09/15/2008 Project: Chateaus of Coppell Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Concrete Supplier: LMC Plant: 7 Specification Requirements Strength: 4,200 psi @ 28 days Slump (in.): 2" - 4" Air (0/0): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design I.D.: 1851 Placement Date: 08/14/2008 Weather Conditions: Partly cloudy, light wind Time Sampled: 02:36pm Batch time: 01 :30pm Temperature - Air: 980F Concrete: 1000F Truck No: 7021 Ticket No: 7196871 Air Content: 3.0% Unit Weight (pet): NA Overall Placement Location: Manholes, Line B - Station 7+90, Line C - Station 5+78 Measured Slump (inches) 1.5 Sample Location: Same as above REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (In) (In') (Ibs) (psi) Type 1 1 08/21/2008 7 5,99 28.18 127,410 4,52 Type2 2 09/11/2008 28 5.99 28.18 150,880 Type5 3 09/11/2008 28 5.99 28.18 155,610 Type4 Average 1 4 10/09/2008 56 ~~ ~~ [ill] E] DO D Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 LIMIT A nONS: The test resuRs presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services. Ltd. (GD/eL) Page 1 of 2 Rone En:=== 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 800, Houston, TX 77040 4421 Freidrlch, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: CTM-Coppell, LLC cia Lenart Development Co., LLC 4601 Old Shepard Place Plana, TX 75093 Report of Concrete Compressive Strength Test Report No.: 332312 Project No.: 0814523 Date of Service: 09/04/2008 Report Date: 09/15/2008 Project: Chateaus of Coppell Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Concrete Supplier: LMC Plant: 7 Specification Requirements Strength: 4,200 psi @ 28 days Slump (in.): 2" - 4" Air (%): N/A Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design 1.0.: 1701 Placement Date: 09/04/2008 Weather Conditions: Sunny, windy Time Sampled: 03:45pm Batch time: 03:21am Temperature - Air: 800F Concrete: 770F Truck No: 5022 Ticket No: 7197588 Air Content: NA Unit Weight (pet): NA Overall Placement Location: Inlet bottoms, inlet A-11, A-4, A-3 Measured Slump (inches) 3.5 Sample Location: Same as above REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Marked Date Age Diameter Area Load Set No. Tested (days) (In) (In2) (Ibs) 1 1 09/11/2008 7 5.99 28.18 93,770 2 10/02/2008 28 3 10/02/2008 28 4 1 0/30/2008 56 ~~ ~[g &E bJ DO D Type 1 Type 2 Type 3 Type 4 Type 5 Remarks: Water added at site: 5 gallons Fracture Type Type3 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services. Ltd. (GO/el) Page 1 of 2