Chicken Express-LR080909
l."~;lInfonnation
~..,. .To Build On
Ellfllneerfng . Consulting · 'ftIstIng
DAILY FIELD REPORT
TESTED FOR:
RANDY HYNES
RANDY HYNES GENERAL CONTRACTOR
101 TRINITY VIEW RD
WEATHERFORD, TX 76087
PROJECT:
CHICKEN EXPRESS RESTAURANT
COPPELL, TX
DATE:
September 09, 2008
PSI REPORT NO.: 341-80040-38
WEATHER:
Rain
TEMPERATURE RANGE:
TO:
INSPECTOR:
Gregory Mason
TYPE OF INSPECTION BEING PERFORMED
SOILS
----1L CONCRETE
FOUNDATIONS
BATCH PLANT
_ CONTROLLED FILL (COMPACTION)
_ PLACEMENT (JOB SITE)
~ Cylinder pick Up
ASPHALT
OTHER
BATCH PLANT
_ PLACEMENT (JOB SITE)
BRIEF RESUME OF WORK ACCOMPLISHED THIS DATE:
On this date, our representative picked up and transported one set of four
concrete test cylinders to the laboratory for curing and testing.
Respectfully submitted,
Professional Service Industries, Inc.
cc: Hynes; Davis; Stone
REPORTS MAY NOT BE REPRODUCED. EXCEPT IN FULL. WITHOUT WRITTEN PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES, INC.
PSI A-300-2 (2)F
Professional Service Industries. Inc.' 4087 Shilling Way' Dallas. TX 75237. Phone 2141330-9211 . Fax 2141467-0031