Chicken Express-LR080913
l-"'~;l lrifonnation
~~. .To Build On
englneedng · ConsultIng · Jitsting
DAILY FIELD REPORT
TESTED FOR:
RANDY HYNES
RANDY HYNES GENERAL CONTRACTOR
101 TRINITY VIEW RD
WEATHERFORD, TX 76087
PROJECT:
CHICKEN EXPRESS RESTAURANT
COPPELL, TX
DATE:
September 13, 2008
PSI REPORT NO.: 341-80040-43
WEATHER:
TEMPERATURE RANGE:
TO:
INSPECTOR:
Gabriel Ortiz
TYPE OF INSPECTION BEING PERFORMED
SOILS
-1L CONCRETE
FOUNDATIONS
BATCH PLANT
_ CONTROLLED FILL (COMPACTION)
_ PLACEMENT (JOB SITE)
~ Cylinder pick Up
ASPHALT
OTHER
BATCH PLANT
_ PLACEMENT (JOB SITE)
BRIEF RESUME OF WORK ACCOMPLISHED THIS DATE:
On this date, our representative picked up and transported two sets of four
concrete test cylinders to the laboratory for curing and testing.
Respectfully submitted,
Professional Service Industries, Inc.
cc: Hynes; Davis; Stone
REPORTS MAY NOT BE REPRODUCED. EXCEPT IN FULL. WITHOUT WRITTEN PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES, INC.
PSI ",.3QO..2 (2)F
Professional Service Industries, Inc.. 4087 Shilling Way. Dallas, TX 75237. Phone 214/330-9211. Fax 214/467-0031