Loading...
ST9905-LR071005 Oct-05-2007 18:09 From- 9723920102 T-951 P.002/003 F-148 E ECSTCXIS,LLP 4950 Keller Springl Road, Suile480 AddiSOn. TX 7;5001 (9'72) 39l-3222 {FAX)392-0102 l'_.....IfIlI\'liI'I~1 "'''rl"lW_~ CONCRETE, GROUT, AND MORTAR TESTS LEITER OF TRANSMITTAL TO; City of Coppell P.O. Box 9478 DATE; 10/0512007 RE: Bethel Road ~ Coppell Coppell, TX 75019 A1TN: Mr. Rick O'Dell PERMIT #: JOB NO.: 005061 LOCATION: Bethel Road, Coppell, TX We are enclosing: X Attached X Materials Engineering Division Concrete Reports: 36 X For Your Use X As Requested CC: TISEO Paving - Robert Caudill ~vWA.i!.~L Principal Engineer ._--~~. Siddharth Neekhra Project Engineer By: Oct-05-2007 18:09 F rcm- 9723920102 T-951 P.003/003 F-148 Owner: Arch.: Struc. Eng.: Placement Location: Manhole Bethel Road M Coppell Bethel Road, Coppell, TX City of Coppell M Rick O'Dell Concrete Cylinders Strength Report Project: 5061 Set Designation: A Cast Date: 09/04/2007 Design Strength: 3500 psi Repon No.: 36 E ECS Texas. Ll.P 4950 Keller Splinas Reid, Suite 480 J\.cldison, 11{ 7SOO1 (972) 392-3222 I..._..<lllll[~ (FAX) 39200102 ~I~ Project: Location: Client: City of Coppell M Kenneth M. Griffin, Gen. Contr.: Cone. Contr.: Concrete Supplier: Redi-Mix Concrete Mix Designation: 1504 Added Water: Truck No: 1355 Mix Strength: 3500 psi Time Added: Ticket No: 63007460 Batch Time: 04:20PM Unit Wt.: FlELD TEST DATA: Tested by: Yaw B. Boaitey Temperature - Air: 940 F Time Sampled:05:1 OPM Concrete: 900 F Slump:4.00 in. Air Content~.50 % (P) Sample Test Test TYPe Diameter Area Breaking Compr. Brk Break Review No Date Age Cure In. In.2 Load,lbs Str.,psi l'yp by by 36020 09/1112007 7 Lab 6.00 28.27 36021 10/0212007 28 Lab 6.00 28.27 118240 4180 SN 36022 10/0212007 28 Lab 6.00 28.27 118432 4190 SN 36023 10/30/2007 56 Lab 6.00 28.27 sa~ In accordne wiIIl QlIW) ASTM C172, ~_lhat samples may have been lllk8l1 tom tile begilltlino mille toad afIf a mnlmlJll discharge of lIIlProxinalely one wbiC yard, Cylindltmoldilg llI1d IabclrIlQyCUllng law ASTM C31, ~e5$ive &lrqlh _and brelIktype ilIwASTM~, s~ law C1~, a1tcontlntlaw ASTM em M orC231 (Pl, ~re _ ASTM C1064, and un~ W81ghllllw ASTM C131l. Cylllllet& are I8&lId uslno unbonded ClIps illW ASTM C1231 fIf.... ~pe<I USing sulphlll' mortarllwC617. Brelk T,,*"te dassllled lIS: Type 1, 2. 3.4, S, or61aw C39-04a FIELD CURING CONDITIONS: Curing Box X No Curing Box Remarks: Eastbound Bethel Rd Insulated Heated Cooled X Caps Ice Other Final Review By: /2~L- SN Print Date: 10/0512007 Oct-05-2007 12:06 From- llli-- ~IL~~'~'~'. ECS Te~ LLP E 4950 KcllerSpriap Road,Saltt 480 Addilon, Tx 7500] (972) 392-3%22 1I",')Il"';rr'I'Ia~_...It.l...Wi',1 (FAX) 392-0102 ~"''l'''I'r.'\':''lr.I:r.I~ 9723920102 T-947 P.002/005 F-143 LETTER OF TRANSMITT AL October 5, 2007 City of Coppell P.O. Box 9478 Coppell, TX 75019 A TIN: Mr. Rick O'Dell RB: Bethel Road - CoppeD Ees Job # 19;5O()1 Permits: Location: .Bethel Road Coppdl, TX We are enclosing~ ....x.... Materials Engineering Division Reports ....L For your use ....L. As requested CC: TISEO Paying. Robert Caudill ENCL: Field Report # 78 Field Report # 80 09/28/2007 10/03/2007 tZ. __L-_ DlYidA.L'U Principal Engineer ~~_............._.... Siddharth Neekhra Project Engineer Oct-05-2007 12:07 Frcm- 9723920102 T-947 P.004/005 F-143 ... ECS Texas. LLP 49110 Kaller S" Road. SUitt 480 Addl$On, 1X 71001 (172)312"222 (FAX) 392.0102 FIELD REPORT Projed LocatiOll Client Berhcl Road - CoppeJl Coppell, TX City of Coppell- Ric:k O'Dell 19:5061 80 Wedncsday 10/0312007 9501 Sunny 1.7S 0.00 1.00 - Totsl 2.7S Re Obs.TIme 0.00 Projed No. Report No. Day & Dste Weather On-Site Time Lab Time Travel Time" Rema,q Tnp Charges" 18.00 TolIslPar1<:ing" Chargeable Items Nuclear Gauge Rental Mileage" Time of Arrival Departure 01:00P O:Z:45P · Travel time and milellge will be: billcxl in acrordance with the contract. Summary ofhl'Ylces Performed (hid" data, locatIona, .....0118 & depths are estf~) & IndiYtdulls Contactad. The undersigned arrived on site, as requested, to observe: 1; The placement and compaction of cement treated base for backfill at culven at stat 118+25. Utilizing the nuclear gauge test method to check the compaction of soils; test results indicated that the compacted material, at the areas and elevations tested, met or exceeded the project requirements of 95% of the maximum dry density as obtained in our laboratory using the Standard Proctor Method (ASTM D-698). The soils observed on this date appeared to be placed in accordance with project drawings and specifications with regard to lift thickness and moisture content. By David M. Ellison, - Field Tecbnician 1800 906Z0