OctOber 1, 2007
RE: Bethel Road - Coppdl
City ofCoppeH
P.O. Box 9478
Cappell, TX 75019
ECS Job # 19:5061
Permits:
location: Bethel Road
CoppeD, TX
A TIN: Mr. Rick O'Dell
We are enclosing:
....L Materials Engineering Division Reports
-L For your use
-L As requested
CC: TISEO Paving - Robert Caudill
ENCL;
Field Report # 75
09/25t2007
12/d: L
DavidA. Lewis, P.R -
Principal Engineer
~~
Siddharth NeeJchra
Project Engineer
Oct-01-2007 17:48
F rom-
9723920102
1-912 P.003/003 F-077
~1IlI~!I_~"""",,,,';\~ ECS Texas. ~
E: aso ",-1"'rSpt1nll8 Road, 8111te 410
Addison, TX "5001
(872) 3924222
(FAX) 3tU10Z
~tl.1!~"~~l.li
~~.r""li1f.til~~
FIELD REPORT
Projea
LOCl!Ition
Client
Bethel Road. Coppell
CoppeJJ, TX
City of CoppeU - Rick O'DeB
19:5061
7S
Tuesday 09I2Sfl007
910{ Sunny
2.00
0.00
1.00
-
Total 3.00
Re Obs. Time 0.00
Project No.
Report No.
Day & Date
Weather
On-Site Time
Lab Time
Travel Time*
Remarks
Trip Charges- 18.00
Chargeabfe Items
Tolls/Parking*
Mleage*
Time of Arrival Departure
03:00P 05:00P
... Travel tim~ an4 mileage will be billed in accordance with the COIltra(.'t,
Su~ry or Servloes Pllrfor1Md (1IeId"l d8ta, loc.1llons, elndlo... & Cf.p8ls a.. lIStIlYI8II$) & IndlYldllllls CantllCfllld.
Concrete Observation:
The undersigned arrived on site, as requested, to observe the placement of 7 cubic yards of
3600 psi concrete for Culvert Walls @ the intersection of Bethel Rd & Freeport.
Concrete observed on this date appeared to be placed in compliance with project
specifications with regard to temperature, slump and batch to placement time, unless noted
otherwise.
1 set of 4 cylinders was cast for Compressive strength.
By Vaw B. Boaitey, - Field Tecbnician
1800