Loading...
ST9905-LR071001 Oct-01-2007 17:48 Frcm- 9723920102 1-912 P.002/003 F-077 -~.""'~-~iif' ECS Tea" LLP E 4'50 Keller Springs R.oad,Suite 480 Addison, 1'X 75001 ('7::) 3'2.3222 l'lbl~~"""'!a.bI:.r~.1 (FAX) 392-0102 l;l1:m1'~1l\.,,':Uf~ LETTER OF TRANS MITT AL OctOber 1, 2007 RE: Bethel Road - Coppdl City ofCoppeH P.O. Box 9478 Cappell, TX 75019 ECS Job # 19:5061 Permits: location: Bethel Road CoppeD, TX A TIN: Mr. Rick O'Dell We are enclosing: ....L Materials Engineering Division Reports -L For your use -L As requested CC: TISEO Paving - Robert Caudill ENCL; Field Report # 75 09/25t2007 12/d: L DavidA. Lewis, P.R - Principal Engineer ~~ Siddharth NeeJchra Project Engineer Oct-01-2007 17:48 F rom- 9723920102 1-912 P.003/003 F-077 ~1IlI~!I_~"""",,,,';\~ ECS Texas. ~ E: aso ",-1"'rSpt1nll8 Road, 8111te 410 Addison, TX "5001 (872) 3924222 (FAX) 3tU10Z ~tl.1!~"~~l.li ~~.r""li1f.til~~ FIELD REPORT Projea LOCl!Ition Client Bethel Road. Coppell CoppeJJ, TX City of CoppeU - Rick O'DeB 19:5061 7S Tuesday 09I2Sfl007 910{ Sunny 2.00 0.00 1.00 - Total 3.00 Re Obs. Time 0.00 Project No. Report No. Day & Date Weather On-Site Time Lab Time Travel Time* Remarks Trip Charges- 18.00 Chargeabfe Items Tolls/Parking* Mleage* Time of Arrival Departure 03:00P 05:00P ... Travel tim~ an4 mileage will be billed in accordance with the COIltra(.'t, Su~ry or Servloes Pllrfor1Md (1IeId"l d8ta, loc.1llons, elndlo... & Cf.p8ls a.. lIStIlYI8II$) & IndlYldllllls CantllCfllld. Concrete Observation: The undersigned arrived on site, as requested, to observe the placement of 7 cubic yards of 3600 psi concrete for Culvert Walls @ the intersection of Bethel Rd & Freeport. Concrete observed on this date appeared to be placed in compliance with project specifications with regard to temperature, slump and batch to placement time, unless noted otherwise. 1 set of 4 cylinders was cast for Compressive strength. By Vaw B. Boaitey, - Field Tecbnician 1800 90445