Loading...
Chicken Express-LR080917 l.i.~;l Information ~.,. .To Build On Engineering · Consulting. Testing DAILY FIELD REPORT TESTED FOR: RANDY HYNES RANDY HYNES GENERAL CONTRACTOR 101 TRINITY VIEW RD WEATHERFORD, TX 76087 PROJECT: CHICKEN EXPRESS RESTAURANT COPPELL, TX DATE: September 17, 2008 PSI REPORT NO.: 341-80040-47 WEATHER: Clear TEMPERATURE RANGE: 75 TO: 80 INSPECTOR: Kirk See TYPE OF INSPECTION BEING PERFORMED SOILS ~ CONCRETE FOUNDATIONS BATCH PLANT _ CONTROLLED FILL (COMPACTION) _ PLACEMENT (JOB SITE) ~ Cylinder Pick Up ASPHALT OTHER BATCH PLANT _ PLACEMENT (JOB SITE) BRIEF RESUME OF WORK ACCOMPLISHED THIS DATE: On this date, our representative picked up and transported one set of four concrete test cylinders to the laboratory for curing and testing. Respectfully submitted, Professional Service Industries, Inc. cc: Hynes; Davis; Stone REPORTS MAY NOT BE REPRODUCED, EXCEPT IN FULL, WITHOUT WRITTEN PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES, INC. PSI A.300-2 (21F Professional Service Industries, Inc,. 4087 Shilling Way. Dallas, TX 75237. Phone 214/330-9211 . Fax 214/467-0031