Chicken Express-LR080917
l.i.~;l Information
~.,. .To Build On
Engineering · Consulting. Testing
DAILY FIELD REPORT
TESTED FOR:
RANDY HYNES
RANDY HYNES GENERAL CONTRACTOR
101 TRINITY VIEW RD
WEATHERFORD, TX 76087
PROJECT:
CHICKEN EXPRESS RESTAURANT
COPPELL, TX
DATE:
September 17, 2008
PSI REPORT NO.: 341-80040-47
WEATHER:
Clear
TEMPERATURE RANGE: 75
TO:
80
INSPECTOR:
Kirk See
TYPE OF INSPECTION BEING PERFORMED
SOILS
~ CONCRETE
FOUNDATIONS
BATCH PLANT
_ CONTROLLED FILL (COMPACTION)
_ PLACEMENT (JOB SITE)
~ Cylinder Pick Up
ASPHALT
OTHER
BATCH PLANT
_ PLACEMENT (JOB SITE)
BRIEF RESUME OF WORK ACCOMPLISHED THIS DATE:
On this date, our representative picked up and transported one set of four
concrete test cylinders to the laboratory for curing and testing.
Respectfully submitted,
Professional Service Industries, Inc.
cc: Hynes; Davis; Stone
REPORTS MAY NOT BE REPRODUCED, EXCEPT IN FULL, WITHOUT WRITTEN PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES, INC.
PSI A.300-2 (21F
Professional Service Industries, Inc,. 4087 Shilling Way. Dallas, TX 75237. Phone 214/330-9211 . Fax 214/467-0031