Loading...
Chicken Express-LR080916 l- "',g ;1 Information ~". .To Build On Engineering. Consulting. Testing REPORT OF FIELD TESTING OF CONCRETE TESTED FOR: RANDY HYNES RANDY HYNES GENERAL CONTRACTOR 101 TRINITY VIEW RD WEATHERFORD, TX 76087 PROJECT: CHICKEN EXPRESS RESTAURANT COPPELL, TX DATE: September 16, 2008 PSI REPORT NO.: 341-80040-45 FIELD DATA: Concrete was delivered by Southern Star, mix number 9351. NO. OF CONCRETE CUBIC TEMPERATURE, of SPECIMENS SUPPLIER TIME TRUCK TIME TRUCK YARDS OF AIR SET NO. MADE TICKET NUMBER DISPATCHED UNLOADED CONCRETE SLUMP, in. CONTENT, % AIR CONCRETE 2127 4 1358020 10:33 am 10:53 am 7.0 5 1/4 2.0 71 82 LOCATION: Paving 2127 20' North, 5' East from the Center of the Souths ide Approach NOTE: APPLICABLE ASTM STANDARDS, UNLESS OTHERWISE INDICATED: MAKING SPECIMENS: C31 (EXC. SEC. 10.1.2); SLUMP: CI4J: AIR CONTENT: C231 (EXC. SEC. 6); TEMPERATURE: Cl064: SAMPLING: C172 REMARKS: Observed the placement of 13.0 cubic yards of concrete. TECHNICIAN: Godfrey White Respectfully submitted, Professional Service Industries, Inc. cc: Hynes; Davis; Stone THESE TEST RESULTS APPLY ONLY TO THE SPECIFIC SAMPLES TESTED AND MAY NOT BE INDICATIVE OF THE ENTIRE CONCRETE PLACEMENT. REPORTS MAY NOT BE REPRODUCED, EXCEPT IN FULL, WITHOUT WRITTEN PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES. INC. Professional Service Industries, Inc.. 4087 Shilling Way. Dallas, TX 75237. Phone 214/330-9211 . Fax 214/467-0031 PSI A-200-1 (6)F l-"~;l Information ~.,. .To Build On Engineering. Consulting. Testing REPORT OF FIELD COMPACTION TESTS (NUCLEAR METHOD) TESTED FOR: RANDY HYNES RANDY HYNES GENERAL CONTRACTOR 101 TRINITY VIEW RD WEATHERFORD, TX 76087 PROJECT: CHICKEN EXPRESS RESTAURANT COPPELL, TX DATE: September 16, 2008 PSI REPORT NO.: 341-80040-44 TEST DATA: (2) BROWN AND GRAY CLAY OPT. MOIST. = 21. 0% MAXIMUM COMMENTS. TEST TEST SOIL 10 LAB DRY * WATER DRY PERCENT Spec. 95% Min NO. MODE/DEPTH ELEV A nON NUMBER UNIT WEIGHT CONTENT UNIT WEIGHT COMPACTION 1 6" FG 2 102.5 17.3 98.0 2 - A 2 6" FG 2 102.5 16.8 100.5 2 - A TEST LOCATION: Paving 1 20' North, 5' East from the Center of the Souths ide Approach . 2 25' North, 10' West from the Center of the Souths ide Approach NOTES: TESTS PERFORMED PER ASTM 02922 & ASTM 03017 UNIT WEIGHTS SHOWN: Lbs. per cubic foot (pet) WATER CONTENT: Percent of dry weight PERCENT COMPACTION: Based on maximum dry unit weight obtained on sample indicated by soil 10 number. * (2) ASTM D698 METHOD A TEST INSTRUMENT: Troxler, 3430, 39193 REMARKS: PSI did not monitor the material .COMMENTS: 1. FILL MATERIAL 2. BACKFILL 3. BASE COURSE 4. SUBBASE 5. SOIL CEMENT 6. OTHER A. TEST RESULTS COMPLY WITH SPECIFICATIONS B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C. RETEST OF PREVIOUS TEST D. MOISTURE IN EXCESS OF SPECIFICATIONS E. MOISTURE BELOW SPECIFICATIONS TECHNICIAN: Godfrey White Pl;~e (( ( STANDA~D UNT M: 657 D: 2570 ~ST N DATA M: D: t V especfful~ sUbm;Ued, . o Professional Se",ico Industries, Inc. cc: Hynes; Davis; Stone THESE TEST RESULTS APPLY ONLY TO THE SPECIFIC LOCATIONS NOTEO ANO MAY NOT REPRESENT ANY OTHER LOCATIONS OR ELEVATIONS. REPORTS MAY NOT BE REPROOUCEO. EXCEPT IN FULL. WITHOUT WRITTEN PERMISSION BY PROFESSIONAL SERVICE INOUSTRIES. INC. PSI A-I 00-2 (5)F Professional Service Industries, Inc.. 4087 Shilling Way. Dallas, TX 75237. Phone 214/~30-9211 . Fax 214/467-0031 ln~;lIriformation ~~. .To Build On Engineering. Consulting. Testing REPORT OF CONCRETE COMPRESSION TEST TESTED FOR: RANDY HYNES RANDY HYNES GENERAL CONTRACTOR 101 TRINITY VIEW RD WEATHERFORD, TX 76087 DATE: September 16, 2008 PSI REPORT NO.: 341-80040-46 PROJECT: CHICKEN EXPRESS RESTAURANT COPPELL, TX FIELD DATA: LOCATION OF PLACEMENT Paving 20' North, 5' East from the Center of the Souths ide Approach DATE PLACED TIME SLUMP, IN. AIR CONTENT, % AIR TEMPERATURE, of CONCRETE TEMPERATURE DATE RECEIVED IN LAB FIELD DATA SUBMITTED BY MIX DATA SUBMITTED BY September 16, 2008 10:50 am 5 1/4 2.0 71 of 82 September 17, 2008 PSI\Godfrey White Southern Star SUPPLIER DELIVERY TICKET NO.rrRUCK NO. MIX NUMBER AND PROPORTIONS CEMENT WATER FINE AGGREGATE COARSE AGGREGATE ADMIXTURE Southern 1358020 9351 5.5 SK Star NOTE: APPLICABLE ASTM STANDARDS UNLESS OTHERWISE INDICATED- SLUMP- C143" AIR CONTENT' C231 (EXCLUDING SEe 61" TEMPERATURE' Cl064" CYLINDERS' C31 {EXCLUDING SEe 101 2l" SAMPLING" Cl72 COMPRESSION TEST RESULTS ASTM C39: C1231 SPECIMEN TEST TOTAL CYLINDER CYLINDER COMPRESSIVE TYPE OF BREAK. LABORATORY IDENTIFICATION AGE DATE OF LOAD DIAMETER AREA STRENGTH AS SHOWN IN NUMBER OR SET NO. (DAYS) TEST (LBS.) (IN.) (sa. IN.) (PSI) ASTM C39 2127 A 7 09/23/08 84530 6.00 28.27 2990 Type 2 2127 B 7 09/23/08 88760 6.00 28.27 3140 Type 2 2127 C 28 10/14/08 2127 D 28 10/14/08 SPECIFICATIONS 28 3000 REMARKS: ~ Cylinders made by PSI representative. Cylinders picked up by PSI ~ representative. Cylinders made by Architect's or Contractor's representative. Test results comply with applicable specifications. Cylinders delivered to PSI laboratory. Test results do not comply with applicable specifications. TECHNICIAN: William Miller cc: Hynes; Davis; Stone Respectfully submitted, Professional Service Industries, Inc. THESE TEST RESULTS APPLY ONL Y TO THE SPECIFIC SAMPLES TESTED AND MAY NOT BE INDICATIVE OF THE ENTIRE CONCRETE PLACEMENT. REPORTS MAY NOT BE REPRODUCED. EXCEPT IN FULL. WITHOUT WRITTEN PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES. INC. PSI A-200-4N F Professional Service Industries, Inc. . 4087 Shilling Way. Dallas, TX 75237 . Phone 214/330-9211 . Fax 214/467-0031