Loading...
ST0301-ES051208 THE.CiTY.OF COPPELL \~.~~ \,;,~~ ('-''''. r:.\,.", ..~", i,"").(. 0/,'- /..;'ii.~. -,."..........;"., .,~., 'w. ~f~/~. )c'o!... _.~~~.\~-~,..,~'ei-_.'. \ -l-.... (lrr'" :.J.-4':::..-.. '1~'/,-. . ~t~. \ '~~~_~~~' ,"'- Y." //~~ l' """#.ji."'~"..' .C~'-~""- Cl (" ~::'"-~?r'O?~~ ~,,",,,,, q ~ II 8 - \ \'> Mr. Wheelice H. Wilson / Ms. Ruby N. Wilson 4] 7 Bethel Road Coppell, Texas 75019-4402 December 8, 2005 RE: Bethel Road 11 ST 03-0 I Parcel 22 - Permanent Right-of- Way Dear Mr. & Ms. Wilson: The City of Coppell is currently working with the engineering firm of Freese and Nichols to design the Bethel Road 11 project. The project will consist of the reconstruction of Bethel Road from Freeport Parbvay to Denton Tap Road, and Coppell Road from Bethel Road to Cooper Lane. The existing t\vo- lane asphalt roadways will be reconstructed as t\vo-Iane concrete roadways with improved drainage and sidewalks. The work will also include the installation of traffic signals, and landscaping and enhanced pavement in the Old Coppell area. The project is in the final design phase, and the city is in the process of acquiring right-of-way and easements from 24 parcels within the project limits. It will be necessary to acquire permanent right-of- way from your property located at 417 Bethel Road. The property has been designated as Parcel 22 on the 'Bethel Road Proposed Right-of- Way Map'. The city needs to acquire 0.098 acres of permanent Tight-of-way from Parcel 22. This overall acreage includes 0.094 acres of right-of-way that the city obtained through prescription. Typically, prescriptive right-of-way is created when the city makes improvements or maintains a portion of private property for a fixed period of time. Your deed runs to the centerline of Bethel Road, however the city has and continues to maintain the road and adjacent drainage ditches. The prescriptive right-of-way extends from the centerline of Bethel Road, southward to the southernmost top bank of the existing drainage ditch. This prescriptive right-of-way has never been recorded in the deed records, so the city needs to proceed with acquiring it as permanent right-of-way. The right-of-way is needed for the construction of the roadway improvements. With this letter I am providing a copy of the legal description and plat for Parcel 22. Please review the enclosed documents and let me know if you have any questions or if you wish to view the construction plans. It is anticipated that construction will begin in the 2nd quarter of 2007. Your consideration of this matter is appreciated. Sincerely, "'--\""" 'It:,,\ -CL,\I..CI.- . '- ..'\ \.. Suzal1~~o/lor CIP C'oordinator Engineering Department Direct: 972-304-7019 Fax: 972-304-3570 E-mail: stav lor(wci.coppell. tx .1IS c.OP PE Ll. .-..- ~ Enc losures ._- .. - lOS5 _ :lOOS ------ - -- ------- ------- .--... -+--- -- -._------- ------ -.---------------- ------ -----.----------.----- 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673 -.---.---------------- .-----. THE'CITY'OF - ----------.----------- corrELL ,}~~5;i~~\( . l.'t;;. --'> (~;.~~~.... @)!#<. ';-'~~,~ ~\- (~~ rrr ~i~~l 4' l' ""',~:::~.\ ",y:...;f~ Cl --.r"--,,,,",-~"";:~.b,"""'" C' "r ~.~, '1 .\' 1\ .s '" \ I> Mr. Wheelice H. Wilson / Ms. Ruby N. Wilson 417 Bethel Road Coppell, Texas 75019-4402 September 27,2007 RE: Bethel Road II ST 03-01 Parcel 22 - Permanent Right-of- Way Letter of Permission Dear Mr. & Ms. Wilson: This letter is written as a follow up to a letter you should have received in July 2007 expressing the city's need for dedication of right of way or easement on your property. This earlier letler is attached herewith for reference. As of the writing of this letter the city has not yet acquired the necessary land to move forward with this project. In the referenced letter we indicate that the plan is to begin construction in the third Quarter of 2008. That is still the plan, however we must first acquire the land, and then have the various franchise utilities (phone, gas, electricity, and cable) relocate their infrastructure prior to beginning construction. As a reminder, we are offering to compensate you for acquisition of this land based on values determined by the Dallas Central Appraisal District. The attached letter from July details the offer for acquisition of this parcel of land. 1 would like to take this opportunity to personally make myself available to you for any questions, comments, discussion, or counter offers you may wish to make concerning acquisition of this land. Please call me at your convenience to discuss this issue, or to set up a time for me to meet you at this location to layout what we will be doing during this project. I am in the office from 8:00am to 5:00pm Monday through Friday, and can be reached directly at 972-304-3681. I am also willing to meet outside those hours if it is easier for you. Please call me in the office to make those arrangements as \vell. We feel this project will be of great benefit to the City of Coppell as a whole, and that it will be particularly beneficial to the Old Coppell Area. Sincerely, - k~. Keith R. Marvin, P.E. Project Engineer Office: 972/304-3681 Fax: 972/304-3570 E-mail: kmarvin@ci.coppclI.tx.us -----, .---:- ~Cj7~-3ot.f -7otf'f Enclosure --------------. 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673