Loading...
ST9905DR-LR080812 SAMPLE PICK-UP Report Number: 94081124.0079 Service Date: July 29, 2008 lrerracon 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 . (214) 630-1010 Client: City of Coppell TX Attn: Rick O'Dell Engineering Dept PO Box 9478 Coppell TX 75019 Services - Concrete cylinder pickup. Report Date: Project: Project No.: TOTAL NUMBER OF CONCRETE CYLINDERS PICKED UP: 3 Report No.: No. .of Cylinders: 94081124.0078 3 August 12, 2008 Bethel Road I - #ST 99-05 Roadway & Drainage Improvements qity Limit Line to Freeport Parkway Coppell, TX 94081124 Terracon Rep: Jason W. Humphrey Eric . Cleveland, P.E. Sen! r Project Engineer The tests were performed In general accordance with applicable ASTM, AASHTO, or DOT test methods. This report Is exclusively for the use of the client Indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily Indicative of the properties of other apparently similar or Identical materials. Report Distribution: (1) City of Coppell TX (1) Tiseo Paving Company. Page 1 of 1 Reviewed by: 23-DGRIRU-f'W. Key CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94081124.0058 Service Date: July 14, 2008 lrerracan 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 OGallons 15 Gallons Report Date: August 12, 2008 Project: Bethel Road I - #5T 99-05 Roadway & Drainage Improvements City Limit Line to Freeport Parkway Coppell, TX Project No.: 94081124 SamDle Information Date Cast: July 14, 2008 Time: 8:15am Sampled by: Johnny L. Clinton Weather Conditions: Clear Accumulative Yards: 40 Batch Size (cy): 10.00 Placement Method: Direct Discharge Sample Locations: West turn lane at Royal & Bethel Placement Location: East & West turn lane at Bethel Rd. & Royal Ln. Client: City of Coppell TX Attn: Rick O'Dell Engineering Dept PO Box 9478 Coppell TX 75019 Materia/Information Specified Strength: 3600 psi @ 28 Days Batch Time: 7:37am Supplier: Tiseo Paving Truck No: Mix 1.0. No.: 2478H Water Added On site Before Test: Water Added Onsite After Test: Ticket No: Batch #4 Field Test Data Test Slump, inches: Air Content, %: Concrete Temperature, of: Ambient Temperature,oF: Plastic Unit Weight, pcf: Result 3.50 3.6 90 94 150.4 Specification Test Method ASTM C 143 ASTM C 231 ASTM C 1064 ASTM C 1064 ASTM C 138 Laboratorv.Test Data Age at Maximum Compressive Date Test Load Strength Tested (days) (Ibs) (psi) 07/16/2008 2 102,060 3,610 07/17/2008 3 107,100 3,790 07/21/2008 7 132,680 4,690 08/11/2008 28 154,690 5,470 08/11/2008 28 157,770 5,580 Average (28 Days) 5,530 Services _ Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Set No. 1 1 1 1 1 Specimen 10 1 2 3 4 5 Diameter Area (inches) (sq. inches) 6.00 28.27 6.00 28.27 6.00 28.27 6.00 28.27 6.00 28.27 The tests were performed In general accordance with applicable ASTM, AASHTO, or DOT test methods. This report Is exclusively for the use of the client indicated above and shall not be reproduced except In full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the locatlon(s) referenced and are not necessarily Indicative of the properties of other apparently similar or Identical materials. Page 1 of2 01.~1..f'~..1(-V CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94081124.0058 Service Date: July 14, 2008 lrerracon 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 o Gallons 18 Gallons Report Date: August 12, 2008 Project: Bethel Road I - #5T 99-05 Roadway & Drainage Improvements City Limit Line to Freeport Parkway Coppell, TX Project No.: 94081124 Sample Information Date Cast: July 14, 2008 Time: 9:00am Sampled by: Johnny L. Clinton Weather Conditions: Clear Accumulative Yards: 80 Batch Size (cy): 10.00 Placement Method: Direct Discharge Sample Locations: SE comer of Bethel & Royal Placement Location: East & West turn lane at Bethel Rd. & Royal Ln. Client: City of Coppell TX AUn: Rick O'Dell Engineering Dept PO Box 9478 Coppell TX 75019 Material Information Specified Strength: 3600 psi @ 28 Days Batch Time: 8:48am Supplier: Tiseo Paving Truck No: Mix 1.0. No.: 2478H Water Added Onsite Before Test: Water Added Onslte After Test: Ticket No: Batch #4 Field Test Data Test Slump, inches: Air Content, %: Concrete Temperature, OF: Ambient Temperature,oF: Plastic Unit Weight, pcf: Result 7.00 4.2 90 95 148.8 Specification Test Method ASTM C 143 ASTM C 231 ASTM C 1064 ASTM C 1064 ASTM C 138 Laboratorv Test Data Age at Maximum Compressive Date Test Load Strength Tested (days) (Ibs) (psi) 07/17/2008 3 104,760 3,700 07/21/2008 7 144,020 5,090 08/11/2008 28 158,940 5,620 08/11/2008 28 154,510 5,460 Average (28 Days) 5,540 Services _ Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Set No. 2 2 2 2 Specimen ID 1 2 3 4 Diameter Area (inches) (sq. inches) 6.00 28.27 6.00 28.27 6.00 . 28.27 . 6.00 28.27 Report Distribution: (1) City of Coppell TX (1) Tiseo Paving Company Reviewed by: Terracon Rep: Johnny L. Clinton Er c J Cleveland, P.E. Senior leet Engineer The tests were performed In general accordance with applicable ASTM, AASHTO, or DOT test methods. This report Is exclusively for the use of the client Indicated above and shall not be reproduced except In full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the locatlon(s) referenced and are not necessarlly Indicative of the properties of other apparently similar or Identical materials. Page 2 of 2 01-M't'\'8R)1..f'!Jt..t<IV CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94081'124.0058A Service Date: July 14, 2008 lrerracan 8901 carpenter Frwy, Ste#100 Dallas, Texas 75247 (214) 630-1010 o Gallons o Gallons Report Date:August 12, 2008 Project: Bethel Road I - #ST 99-05 Roadway & Drainage Improvements City Limit Line to Freeport Parkway Coppell, TX Project No.: 94081124 Sample Information Date Cast: July 14, 2008 Time: 1 0:40am Sampled by: Johnny L. Clinton Weather Conditions: Clear Accumulative Yards: 60 Batch Size (cy): 10.00 Placement Method: Direct Discharge Sample Locations: Sta. 10+25 Placement Location: South bound Creekview Sta. 0+00 to 11 +1 0 Client: City of Coppell TX Alln: Rick O'Dell Engineering Dept PO Box 9478 Coppell TX 75019 Materia/Information Specified Strength: 3600 psi @ 28 Days Batch Time: 10:28am Supplier: Tiseo Paving Truck No: Mix 1.0. No.: 2478M Water Added Onsite Before Test: Water Added Onsite After Test: Ticket No: Batch #19 Field Test Data Test Slump, inches: Air Content, %: Concrete Temperature, of: Ambient Temperature,oF: Plastic Unit Weight, pcf: Result 1.00 2.9 91 96 154.2 Specification Test Method ASTM C 143 ASTM C 231 ASTM C 1064 ASTM C 1064 ASTM C138 Laboratory Test Data Age at Maximum Compressive Date Test Load Strength Tested (days) (Ibs) (psi) 07/21/2008 ,. 7 141,020 4,990 08/11/2008 28 155,560 5,500 08/11/2008 28 153,470 5,430 Average (28 Days) 5,470 Services _ Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Set No. 1 1 1 Specimen 10 1 2 3 Diameter Area (inches) (sq. inches) 6.00 28.27 6.00 28.27 6.00 28.27 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily Indicative of the' properties of other apparently similar or identIcal materials. ' Page 1 of 5 D1-MV'f'B/R01..fLtLn t<ry CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94081124.0058A . Service Date: July 14, 2008 lrerracan 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 o Gallons o Gallons. Report Date: August 12, 2008 Project: Bethel Road I - #ST 99-05 Roadway & Drainage Improvements City Limit Line to Freeport Parkway Coppell, TX Project No.: 94081124 Samole Information Date Cast: July 14, 2008 Time: 11:15am Sampled by: Johnny L. Clinton Weather Conditions: Clear Accumulative Yards: 180 Batch Size (cy): 10.00 Placement Method: Direct Discharge Sample Locations: Sta. 10+25 Placement Location: South bound Creekview Sta. 0+00 to 11 +1 0 Client: City of Coppell TX. AUn: Rick O'Dell Engineering Dept PO Box 9478 Coppell TX 75019 Material Information Specified Strength: 3600 psi @ 28 Days Batch Time: 11 :12am Supplier: Tiseo Paving Truck No: Mix I.D. No.: 2478M Water Added Onsite Before Test: Water Added Onsite After Test: Ticket No: Batch # Field Test Data Test Slump, inches: Air Content, %: Concrete Temperature, of: Ambient Temperature,oF: Plastic Unit Weight, pcf: Result 1.00 4.2 91 97 152.0 Specification Test Method ASTM C 143 ASTM C 231 ASTM C 1064 ASTM C 1064 ASTM C138 Laboratorv Test Data Age at Maximum Compressive Date Test Load Strength Tested (days) (Ibs) (psi) 07/21/2008 7 128,550 4,550 08/11/2008 28 179,700 6,360 08/11/2008 28 173,620 6,140 Average (28 Days) 6,250 Services _ Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Set No. 2 2 2 Specimen 10 1 2 3 Diameter Area (inches) (sq. inches) 6.00 28.27 6.00 28.27 6.00 28.27 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report Is exclusively for the use of the client indicated above and shall not be reproduced except in rull Without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the locatlon(s) referenced and are not necessarily indicative of the properties of other apparently similar or Identical materials. Page 2 of 5 OM.M'BIR01-FUU' Hoy CONCRETE COMPRESSIVE STRENGTH TEST Report Nurriber: 94081124.0058A Service Date: July 14,2008 lrerracon 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1.010 o Gallons o Gallons Report Date: August 12, 2008 Project: Bethel Road I - #ST 99-05 Roadway & Drainage Improvements City Limit Line to Freeport Parkway Coppell, TX Project No.: 94081124 Sample Information Date Cast: July 14, 2008 Time: 12:00pm Sampled by: Johnny L. Clinton Weather Conditions: Clear Accumulative Yards: 300 Batch Size (cy): 10.00 Placement Method: Direct Discharge Sample Locations: Sta. 10+25 Placement Location: South bound Creekview Sta. 0+00 to 11+10 Client: City of Coppell TX AUn: Rick O'Dell Engineering Dept PO Box 9478 Coppell TX 75019 Material Information Specified Strength: 3600 psi @ 28 Days Batch Time: 11 :53am Supplier: Tiseo Paving Truck No: Mix 1.0. No.: 2478M Water Added Onsite Before Test: Water Added Onsite After Test: Ticket No: Batch #43 Field Test Data Test Slump, inches: Air Content, %: Concrete Temperature, of: Ambient Temperature,oF: Plastic Unit Weight, pcf: Result 1.00 3.8 92 97 152.8 Specification Test Method ASTM C 143 ASTM C 231 ASTM C 1064 ASTM C 1064 ASTM C138 Laboratorv Test Data Age at Maximum Compressive Date Test Load Strength Tested (days) (Ibs) (psi) 07/21/2008 7 144,630 5,110 08/11/2008 28 169,180 5,980 08/11/2008 28 176,990 6,260 Average (28 Days) 6,120 Services _ Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Set No. 3 3 3 Specimen 10 1 2 .3 Diameter Area (inches) (sq. inches) 6.00 28.27 6.00 28.27 6.00 28.27 The tests were performed In general accordance with applicable ASTM, AASHTO, or DOT test methods. This report Is exclusively for the use of the client indicated above and shall not be reproduced except In full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily Indicative of the properties of other apparenlly similar or Identical materials. Page 3 of 5 01-MvWJR01.FlALJ'III'l-r CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94081124.0058A Service Date: July 14, 2008 lrerracon 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Specification Age at Maximum Compressive Date Test Load Strength Tested (days) (Ibs) (psi) 07/21/2008 7 137,880 4,880 08/11/2008 28 153,690 5,440 08/11/2008 28 174,660 6,180 Average (28 Days) 5,810 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Client: City of Coppell TX AUn: Rick O'Dell Engineering Dept PO Box 9478 Coppell TX 75019 Material Information Specified Strength: 3600 psi @ 28 Days Batch Time: 12:33am Supplier: Tiseo Paving Truck No: Mix 1.0. No.: 2478M Water Added Onsite Before Test: Water Added Onsite After Test: Tick~t No: Batch #55 o Gallons o Gallons Field Test Data Test Slump, inches: Air Content, %: Concrete Temperature, of: Ambient Temperature,oF: Plastic Unit Weight, pcf: Result 0.50 2.9 92 98 154.4 Laboratory Test Data Set No. 4 4 4 Specimen ID 1 2 3 Diameter Area (inches) (sq. inches) 6.00 28.27 6.00 28.27 6.00 28.27 Report Date:August 12, 2008 Project: Bethel Road I - #ST 99-05 Roadway & Drainage Improvements City Limit Line to Freeport Parkway Coppell, TX Project No.: 94081124 Sample Information Date Cast: July 14, 2008 Time: 12:37am Sampled by: Johnny L. Clinton Weather Conditions: Clear Accumulative Yards: 420 Batch Size (cy): 10.00 Placement Method: Direct Discharge Sample Locations: Sta. 10+25 Placement Location: South bound Creekview Sta. 0+00 to 11 +1 0 Test Method ASTM C 143 ASTM C 231 ASTM C 1064 ASTM C 1064 ASTM C138 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report Is exclusively for the use of the client Indicated above and shall not be reproduced except in full withoutlhe written consent of our company. Test results transmitted herein are only applicable 10 the actual samples tested at the location(s) referenced and are not necessarily Indicative of the properties of other apparently similar or Identical materials. Page 4 of 5 01.MW8/ROt.f..... K.y CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94081124.0058A Service Date: July 14, 2008 lrerracon 8901 Carpenter Frwy, Ste #1 00 Dallas, Texas 75247 (214) 630-101.0 o Gallons o Gallons Report Date: August 12, 2008 Project: Bethel Road I - #ST 99-05 Roadway & Drainage Improvements City Limit Line to Freeport Parkway Coppell, TX Project No.: 94081124 Sample Information Date Cast: July 14, 2008 Time: 1:30pm Sampled by: Johnny L. Clinton Weather Conditions: Clear Accumulative Yards: 550 Batch Size (cy): 10.00 Placement Method: Direct Discharge Sample Locations: Sta. 10+25 Placement Location: South bound Creekview Sta. 0+00 to 11 +1 0 Client: City of Coppell TX Attn: Rick O'Dell Engineering Dept PO Box 9478 Coppell TX 75019 Material Information Specified Strength: 3600 psi @ 28 Days Batch Time: 1 :14pm Supplier: Tiseo Paving Truck No: Mix I.D. No.: 2478M Water Added Onsile Before Test: Water Added Onsile After Test: Ticket No: Batch #68 Field Test Data Test Slump, inches: Air Content, %: Concrete Temperature, of: Ambient Temperature,oF: Plastic Unit Weight, pcf: Result 1.50 4.0 92 98 152.8 Specification Test Method ASTM C 143 ASTM C 231 ASTM C 1064 ASTM C 1064 ASTM C138 Laboratorv Test Data Age at Maximum Compressive Date Test Load Strength Tested (days) (Ibs) (psi) 07/21/2008 7 144,000 5,090 08/11/2008 28 165,480 5,850 08/11/2008 28 169,130 5,980 Average (28 Days) 5,920 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Set No. 5 5 5 Specimen 10 1 2 3 Diameter Area (inches) (sq. inches) 6.00 28.27 6.00 28.27 6.00 28.27 Report Distribution: (1) City of Coppell TX (1) Tiseo Paving Company Reviewed by: TerraconRep: Johnny L. Clinton Eric J. leveland, P.E. Senior Project Engineer The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the locatlon(s) referenced and are not necessarily Indicative of the properties of other apparently similar or Identical materials. Page 5 of 5 DI-MW8/R01.f'tAlIe Key CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94081124.0055 Service Date: July 11, 2008 .lrerracon 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Batch Time: 7:22am Plant: On-Site Supplier: Tiseo Paving Co. Truck No: Ticket No: Batch 3 Mix 1.0. No.: 2478M Water Added Onsite Before Test: o Gallons Water Added Onsite After Test: 0 Gallons Report Date: August 12, 2008 Project: Bethel Road I - #ST 99-05 Roadway & Drainage Improvements City Limit Line to Freeport Parkway Coppell, TX Project No.: 94081124 Sample Information Date Cast: July 11, 2008 Time: 7:30am Sampled by: Johnny L. Clinton Weather Conditions: Clear Accumulative Yards: 30 Batch Size (cy): 10.00 Placement Method: Sample Locations: Sta. 45+80 Placement Location: Bethel Road Sta. 45+50 to Sta. 65+00 Client: City of Coppell TX AUn: Rick O'Dell Engineering Dept PO Box 9478 Coppell TX 75019 Material Information Specified Strength: 3600 psi @ 28 Days Field Test Data Test Slump, inches: Air Content, %: Concrete Temperature, of: Ambient Temperature,oF: Plastic Unit Weight, pcf: Result 1.00 2.7 88 91 153.2 Specification Test Method ASTM C143 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 Laboratorv Test Data Age at Maximum Compressive Date Test Load Strength Tested (days) (Ibs) (psi) 07/18/2008 7 146,890 5,190 08/08/2008 28 196,910 6,960 08/08/2008 28 186,350 6,590 Average (28 Days) 6,780 Services _ Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Set No. 1 1 1 Specimen 10 1 2 3 Diameter Area (inches) (sq. inches) 6.00 28.27 6.00 28.27 6.00 28.27 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client Indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted hereIn are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 1 of 12 01-BMSmOl.p...... Key CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94081124.0055 Service Date: July 11, 2008 lrerracan 8901 Carpenter Frwy, Ste#1oo Dallas, Texas 75247 (214) 630-1 01 0 Batch Time: 7:58am Plant: On-Site Supplier: Tiseo Paving Co. Truck No: Ticket No: Batch 13 Mix 1.0. No.: 2478M Water Added Onsite Before Test: 0 Gallons Water Added Onsite After Test: 0 Gallons Report Date: August 12, 2008 Project: Bethel Road I - #ST 99-05 Roadway & Drainage Improvements City Limit Line to Freeport Parkway Coppell, TX Project No.: 94081124 Sample Information Date Cast: July 11, 2008 Time: 8:00am Sampled by: Johnny L. Clinton Weather Conditions: Clear . Accumulative Yards: 130 Batch Size (cy): 10.00 Placement Method: Sample Locations: Sta.47+25 Placement Location: Bethel Road Sta. 45+50 to Sta. 65+00 Client: City of Coppell TX AUn: Rick O'Dell Engineering Dept PO Box 9478 Coppell TX 75019 Material Information Specified Strength: 3600 psi @ 28 Days Field Test Data Test Slump, Inches: Air Content, %: Concrete Temperature, of: Ambient Temperature,oF: Plastic Unit Weight, pcf: Result 2.00 4.7 90 93 149.2 Specification Test Method ASTM C143 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 Laboratory Test Data Age at Maximum Compressive Date Test Load Strength Tested (days) (Ibs) (psi) 07/18/2008 7 133,810 4,730 08/08/2008 28 173,330 6,130 08/08/2008 28 146,490 5,180 Average (28 Days) 5,660 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Set No. 2 2 2 Specimen 10 1 2 3 Diameter Area (inches) (sq. inches) 6.00 28.27 6.00 28.27 6.00 28.27 The tests were performed in general accordance with applicable ASTM. AASHTO, or DOT test methods. This report Is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily Indicative of the properties of other apparently similar or Identical materials. Page 2 of 12 D1.EIhlSlRO'S-fl&l'eKey CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94081124.0055 Service Date: July 11, 2008 lrerracan 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Specification Age at Maximum Compressive Date Test Load Strenp.th Tested (days) (Ibs) (pSI) 07/18/2008 7 139,010 4,920 08/08/2008 28 149,450 5,290 08/08/2008 28 160,520 5,680 Average (28 Days) 5,490 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Client: City of Coppell TX AUn: Rick O'Dell Engineering Dept PO Box 9478 Coppell TX 75019 Material Information Specified Strength: 3600 psi @ 28 Days Batch Time: 8:32am Plant: On-Site Supplier: Tiseo Paving Co. Truck No: Ticket No: Batch 26 Mix 1.0. No.: 2478M Water Added Onsite Before Test: 0 Gallons Water Added Onsite After Test: 0 Gallons Field Test Data Test Slump, inches: Air Content, %: Concrete Temperature, of: Ambient Temperature, of: Plastic Unit Weight, pcf: Result 2.00 4.0 91 94 151.6 Laboratorv Test Data Set No. 3 3 3 Specimen 10 1 2 3 Diameter Area (inches) (sq. inches) 6.00 28.27 6.00 28.27 6.00 28.27 Report Date: August 12, 2008 Project: Bethel Road I - #ST 99-05 Roadway & Drainage Improvements City Limit Line to Freeport Parkway Coppell, TX Project No.: 94081124 Sample Information Date Cast: July 11, 2008 Time: 8:35am Sampled by: Johnny L. Clinton Weather Conditions: Clear Accumulative Yards: 260 Batch Size (cy): 10.00 Placement Method: Sample Locations: Sta. 48+75 Placement Location: Bethel Road Sta. 45+50 to Sta. 65+00 Test Method ASTM C143 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client Indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the locatlon(s) referenced and are not necessarily indicative of the properties of other apparently sImilar or IdentIcal materials. . Page 3 of 12 01-8MSlR01-F....n Key CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94081124.0055 Service Date: July 11, 2008 lrerracan 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Batch Time: 9:02am Plant: On-Site Supplier: Tiseo Paving Co. . Truck No: Ticket No: Batch 37 Mix I.D. No.: 2478M Water Added Onsite Before Test: 0 Gallons Water Added Onsite After Test: 0 Gallons Report Date:August 12, 2008 Project: Bethel Road I - #ST 99-05 Roadway & Drainage Improvements City Limit Line to Freeport Parkway Coppell, TX Project No.: 94081124 Samole Information Date Cast: July 11, 2008 Time: 9:05am Sampled by: Johnny L. Clinton Weather Conditions: Clear Accumulative Yards: 370 Batch Size (cy): 10.00 Placement Method: Sample Locations: Sta. 50+00 Placement Location: Bethel Road Sta. 45+50 to Sta. 65+00 Client: City of Coppell TX AUn: Rick O'Dell Engineering Dept PO Box 9478' Coppell TX 75019 Material Information Specified Strength: 3600 psi @ 28 Days Field Test Data Test Slump, inches: Air Content, %: Concrete Temperature, of: Ambient Temperature,oF: Plastic Unit Weight, pcf: Result 1.75 2.9 91 94 154.0 Specification Test Method ASTM C143 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 Laboratory Test Data Age at Maximum Compressive Date Test Load Strength Tested (days) (Ibs) (ps!} 07/18/2008 7 126,470 4,470 08/08/2008 28 186,050 6,580 08/08/2008 28 173,070 6,120 Average (28 Days) 6,350 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Set No. 4 4 4 Specimen 10 1 2 3 Diameter Area (inches) (sq. inches) 6.00 28.27 6.00 28.27 6.00 28.27 The test~ were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client Indicated above and shall not be reproduced except In full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the locatlon(s) referenced and are not necessarily Indicative of the properties of other apparently similar or identical materials. Page 4 of 12 D1-8MS1R01~1A.W". KIY CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94081124.0055 Service Date: July 11, 2008 lrerracan 8901 Carpenter Frwy, 8te#100 Dallas, Texas 75247 (214) 630-1010 Specification Age at Maximum Compressive Date Test Load Strength Tested (days) (Ibs) (psi) 07/18/2008 7 130,120 4,600 08/08/2008 28 187,890 6,640 08/08/2008 28 186,570 6,600 Average (28 Days) 6,620 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Client: City of Coppell TX AUn: Rick O'Dell Engineering Dept PO Box 9478 Coppell TX 75019 Material Information Specified Strength: 3600 psi @ 28 Days Batch Time: Plant: On-Site Supplier: Tiseo Paving Co. Truck No: Ticket No: Batch 49 Mix 1.0. No.: 2478M Water Added Onsite Before Test: 0 Gallons Water Added Onsite After Test: 0 Gallons Field Test Data Test Slump, inches: Air Content, %: Concrete Temperature, of: Ambient Temperature,oF: Plastic Unit Weight, pcf: Result 1.00 3.0 90 94 154.4 Laboratorv Test Data Set No. 5 5 5 Specimen ID 1 2 3 Diameter Area (inches) (sq. inches) 6.00' 28.27 6.00 28.27 6.00 28.27 Report Date: August 12, 2008 Project: Bethel Road I - #ST 99-05 Roadway & Drainage Improvements City Limit Line to Freeport Parkway Coppell, TX Project No.: 94081124 Sample Information Date Cast: July 11, 2008 Time: Sampled by: Johnny L. Clinton Weather Conditions: Clear Accumulative Yards: 480 Batch Size (cy): 10.00 Placement .Method: Sample Locations: Sta. 52+00 Placement Location: Bethel Road Sta. 45+50 to Sta. 65+00 Test Method ASTM C143 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client Indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or Identical materials. Page 5 of 12 OI.BMMlOJ..F..... K.V CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94081124.0055 Service Date: July 11, 2008 lrerracon 8901 Carpenter Frwy, Ste #1 00 Dallas, Texas 75247 (214) 630-101 0 Batch Time: 10;29am Plant: On-Site Supplier: Tiseo Paving Co. Truck No: Ticket No: Batch 59 Mix 1.0. No.: 2478M Water Added Onsite Before Test: OGallons Water Added Onsite After Test: 0 Gallons Report Date: August 12, 2008 Project: Bethel Road I - #ST 99-05 Roadway & Drainage Improvements City Limit Line to Freeport Parkway Coppell, TX Project No.: 94081124 Sample Information Date Cast: July 11, 2008 Time: 10:40am Sampled by: JOhnny L. Ciinton Weather Conditions: Clear Accumulative Yards: 580 Batch Size (cy): 10.00 Placement Method: Sample Locations: Sta. 53+00 Placement Location: Bethel Road Sta. 45+50 to Sta. 65+00 Client: City of Coppell TX AUn: Rick O'Dell Engineering Dept PO Box 9478 Coppell TX 75019 Material Information Specified Strength: 3600 psi @ 28 Days Field Test Data Test Slump, inches: Air Content, %: Concrete Temperature, of: Ambient Temperature,oF: Plastic Unit Weight, pcf: Result 0.75 3.4 91 94 153.2 Specification Test Method ASTM C143 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 Laboratory Test Data Age at Maximum Compressive Date Test Load Strength Tested (days) (Ibs) (psi) 07/18/2008 7 144,320 5,100 08/08/2008 28 176,950 6,260 08/08/2008 28 158,600 5,610 Average (28 Days) 5,940 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Set No. 6 6 6 Specimen ID 1 2 3 Diameter Area (inches) (sq. inches) 6.00 28.27 6.00 28.27 6.00 28.27 The tests were performed In general accordance with applicable ASTM, AASHTO, or DOT test methods. This report Is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the locatlon(s) referenced and are not necessarily indicallve of the properties of other apparently similar or Identical materials. Page 6 of 12 OHlMS/ROI.FlAn Key CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94081124.0055 Service Date: July 11, 2008 lrerracan 8901 Carpenter Frwy, Ste#1oo Dallas, Texas 75247 (214) 630-1010 Batch Time: 11 :14am Plant: On-Site Supplier: Tiseo Paving Co. Truck No: Ticket No: Batch 70 Mix I.D. No.: 2478M Water Added Onsite Before Test: o Gallons Water Added Onsite After Test: 0 Gallons Report Date: August 12, 2008 Project: Bethel Road I - #ST 99-05 Roadway & Drainage Improvements City Limit Line to Freeport Parkway Coppell, TX Project No.: 94081124 Sample Information Date Cast: July 11, 2008 Time: 11:15am Sampled by: Johnny L. Clinton Weather Conditions: Clear Accumulative Yards: 690 Batch Size (cy): 10.00 Placement Method: Sample Locations: Sta. 54+50 Placement Location: Bethel Road Sta. 45+50 to Sta. 65+00 Client: City of Coppell IX AUn: Rick O'Dell Engineering Dept PO Box 9478' Coppel! TX 75019 Material Information Specified Strength: 3600 psi @ 28 Days Field Test Data Test Slump, inches:- Air Content, %: Concrete Temperature, of: Ambient Temperature,oF: Plastic Unit Weight, pcf: Result 1.00 3.2 92 95 153.2 Specification Test Method ASTM C143 ASTM C231 ASTM C1064 ' ASTM C1064 ASTM C138 Laboratory Test Data Age at Maximum Compressive Date Test Load Strength Tested (days) (Ibs) (psi) 07/18/2008 7 147,460 5,210 08/08/2008 28 170,210 6,020 08/08/2008 28 181,000 6,400 Average (28 'Days) 6,210 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Set No. 7 7 7 Specimen ID 1 2 3 Diameter Area (inches) (sq. inches) 6.00 28.27 6.00 28.27 6.00 28.27 The tests were performed In general accordance with applicable ASTM, AASHTO, or DOT test methods. this report Is exclusively for the use of the client Indicated above and shall not be reproduced except In full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the localion(s) referenced and are not necessarily Indicative of the properties of other apparently similar or Identical materials. Page 7 of 12 D1...eMSlR01.FUin KIY CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94081124.0055 Service Date: July 11, 2008 lrerracon 6901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Batch Time: 11 :58am Plant: On-Site Supplier: Tiseo Paving Co. Truck No: Ticket No: Batch 82 Mix 1.0. No.: 2478M Water Added Onsite Before Test: o Gallons Water Added Onsite After Test: 0 Gallons Report Date: August 12, 2008 Project: Bethel Road I - #ST 99-05 Roadway & Drainage Improvements City Limit Line to Freeport Parkway Coppell, TX Project No.: 94081124 Sample Information Date Cast: July 11, 2008 Time: 12:05pm Sampled by: Johnny L. Clinton Weather Conditions: Clear Accumulative Yards: 810 Batch Size (cy): 10.00 Placement Method: Sample Locations: Sta. 56+00 Placement Location: Bethel Road Sta. 45+50 to Sta. 65+00 Client: City of Coppell TX Attn:.Rick O'Dell Engineering Dept PO Box 9478 Coppell TX 75019 Material Information Specified Strength: 3600 psi @ 28 Days Field Test Data Test Slump, inches: Air Content, %: Concrete Temperature, of: Ambient Temperature,oF: Plastic Unit Weight, pcf: Result 0.50 2.1 92 96 156.0 Specification Test Method ASTM C143 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 Laboratory Test Data Age at Maximum Compressive Date Test Load Strength Tested (days) (Ibs) (psi) 07/18/2008 7 146,540 5,180 08/08/2008 28 181,780 6,430 08/08/2008 28 177,290 6,270 Average (28 Days) 6,350 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Set No. 8 8 8 Specimen 10 1 2 3 Diameter Area (inches) (sq. inches) 6.00 28.27 6.00 28.27 6.00 28.27 The tests were performed In general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted hereIn are only applicable to the actual samples tested at the locatlon(s) referenced and are not necessarily Indicative of the properties of other apparently similar or Identical materials. Page 6 of 12 01-8~Ol..f,*".KO)' CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94081124.0055 Service Date: July 11, 2008 lrerracon 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1 01 0 Batch Time: 12:34am Plant: On-Site Supplier: Tiseo Paving Co. Truck No: Ticket No: Batch 93 Mix 1.0. No.: 2478M Water Added Onsite Before Test: 0 Gallons Water Added Onsite After Test: 0 Gallons Report Date: August 12. 2008 Project: Bethel Road I - #ST 99-05 Roadway & Drainage Improvements City Limit Line to Freeport Parkway Coppell, TX Project No.: 94081124 Sample Information Date Cast: July 11. 2008 Time: 12:40pm Sampled by: Johnny L. Clinton Weather Conditions: Clear Accumulative Yards: 920 Batch Size (cy): 10.00 Placement Method: Sample Locations: Sta. 58+00 Placement Location: Bethel Road Sta. 45+50 to Sta. 65+00 Client: City of Cappell TX Attn: Rick O'Dell Engineering Dept PO Box 9478 Coppell TX 75019 Material Information Specified Strength: 3600 psi @ 28 Days Field Test Data Test Slump, inches: Air Content, %: Concrete Temperature, of: Ambient Temperature.oF: Plastic Unit Weight, pcf: Result. 0.75 3.1 91 96 154.8 Specification Test Method ASTM C143 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 Laboratorv Test Data Age at Maximum Compressive Date Test Load Strength Tested (days) (Ibs) (psi) 07/18/2008 7 96,010 3,400 08/08/2008 28 188,130 6,650 08/08/2008 28 176,640 6.250 Average (28 Days) 6,450 Services - Obtain samples of fresh concrete at the placement locations. perform required field tests and cast compressive strength samples. Set No. 9 9 9 Specimen ID 1 2 3 Diameter Area (inches) (sq. inches) 6.00 28.27 6.00 28.27 6.00 28.27 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report Is exclusively for the use of the client Indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the locatlon(s) referenced and are not necessarily indicative of the properties of other apparently similar or Identical materials. Page 9 of 12 Ot-BMSlRDI-fw.t KtY CONCRETE COMPRESSIVE STRENGTH TEST . Report Number: 94081124.0055 Service Date: July 11, 2008 lrerracon 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Batch Time: 1 :31 pm Plant: On-Site Supplier: Tiseo Paving Co. Truck No: Ticket No: Batch 107 Mix 1.0. No.: 2478M Water Added Onsite Before Test: 0 Gallons Water Added Onsite After Test: 0 Gallons Report Date: August 12, 2008 Project: Bethel Road I - #ST 99-05 Roadway & Drainage Improvements City Limit Line to Freeport Parkway Coppell, TX Project No.: 94081124 Sample Information Date Cast: July 11, 2008 Time: 1 :35pm Sampled by: JOhnny L. Clinton Weather Conditions: Clear . Accumulative Yards: 1050/1400 Batch Size (cy): 10.00 Placement Method: Sample Locations: Sta. 59+75 Placement Location: Bethel Road Sta. 45+50 to Sta. 65+00 Client: City of Coppell TX AUn: Rick O'Dell Engineering Dept PO Box 9478 Coppell TX 75019 Material Information Specified Strength: 3600 psi @ 28 Days Field Test Data Test Slump, inches: Air Content, %: Concrete Temperature, of: Ambient Temperature,oF: Plastic Unit Weight, pcf: Result 1.00 3.2 92 97 154.0 Specification Test Method ASTM C143 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 Laboratory Test Data Age at Maximum Compressive Date Test Load Strength Tested (days) (Ibs) . (pstl 07/18/2008 7 147,350 5,210 08/08/2008 28 182,420 6,450 08/08/2008 28 164,720 5,830 Average (28 Days) 6,140 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive 'strength samples. Set No. 10 10 10 Specimen 10 1 2 3. Diameter Area (inches) (sq. inches) 6.00 28.27 6.00 28.27 6.00 28.27 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use or the client indicated above and shall not be reproduced except in full without the written consent or our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or Identical materials. Page 10 of 12 01-BMSIR01.f'..." K,y CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94081124.0055 Service Date: July 11, 2008 lrerracon 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Batch Time: 2:13pm Plant: On-Site Supplier: Tiseo Paving Co. Truck No: Ticket No: Batch 122 Mix 1.0. No.: 2478M Water Added Onsite Before Test: o Gallons Water Added Onsite After Test: 0 Gallons Report Date: August 12, 2008 Project: Bethel Road I - #ST 99-05 Roadway & Drainage Improvements City Limit Line to Freeport Parkway Cappell, TX Project No.: 94081124 Sample Information Date Cast: July 11, 2008 Time: 2:20pm Sampled by: Johnny L. Clinton Weather Conditions: Clear Accumulative Yards: 1200/1400 Batch Size (cy): 10.00 Placement Method: Sample Locations: Sta. 62+00 Placement Location: Bethel Road Sta. 45+50 to Sta. 65+00 Client: City of Coppell TX AUn: Rick O'Dell Engineering Dept PO Box 9478 Coppell TX 75019 Material Information Specified Strength: 3600 psi @ 28 Days Field Test Data Test Slump, inches: Air Content, %: Concrete Temperature, OF: Ambient Temperature,oF: Plastic Unit Weight, pcf: Result 1.00 4.0 92 97 153.2 Specification Test Method ASTM C143 ASTM C231 ASTM C1064 . ASTM C1064 ASTM C138 Laboratory Test Data Age at Maximum CompreSSive Date Test Load Strength Tested (days) (Ibs) (psi) 07/18/2008 7 130,840 4,630 08/08/2008 28 160,930 5,690 08/08/2008 28 155,030 5,480 Average (28 Days) 5,590 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Set No. 11 11 11 Specimen 10 1 2 3 Diameter Area (inches) (sq. inches) 6.00 28.27 6.00 28.27 6.00 28.27 The lests were performed In general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except In full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the locatlon(s) referenced and are not necessarily Indlcallve of the properties of other apparently similar or Identical materials. Page 11 of12 01.BMS/ROI+fw.o K.~ CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94081124.0055 Service Date: July 11, 2008 lrerracon 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Batch Time: 2:52pm Plant: On-Site Supplier: Tiseo Paving Co. Truck No: Ticket No: Batch 136 Mix 1.0. No.: 247.8M Water Added Onsite Before Test: 0 Gallons Water Added Onsite After Test:. 0 Gallons Report Date: August 12, 2008 Project: Bethel Road I - #ST 99-05 Roadway & Drainage Improvements City Limit Line to Freeport Parkway Coppell, TX Project No.: 94081124 Sample Information Date Cast: July 11, 2008 Time: 3:00pm Sampled by: Johnny L. Clinton Weather Conditions: Clear Accumulative Yards: 1340 Batch Size (cy): 10.00 Placement Method: Sample Locations: Sta. 64+00 Placement Location: Bethel Road Sta. 45+50 to Sta. 65+00 Client: City of Coppell TX AUn: Rick O'Dell Engineering Dept PO Box 9478 Coppell TX 75019 Material Information Specified Strength: 3600 psi @ 28 Days Field Test Data Test Slump, inches: Air Content, %: Concrete Temperature, of: Ambient Temperature,oF: Plastic Unit Weight, pcf: Result 0.75 2.9 92 99 154.8 Specification Test Method ASTM C143 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 Laboratorv Test Data Age at Maximum Compressive Date Test Load Strength' Tested (days) (Ibs) . (psi) 07/18/2008 7 152,100 5,380 08/08/2008 28 191,680 6,780 08/08/2008 28 181,150 6,410 Average (28 Days) 6,600 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Set No. 12 12 12 Specimen 10 1 2 3 Diameter Area (inches) (sq. inches) 6.00 28.27 6.00 28.27 6.00 28.27 Report Distribution: (1) City or Coppell TX (1) Tiseo Paving Company Reviewed by: Terracon Rep: Johnny L. Clinton Eric J. Cleveland, P.E. Senior P ~ect Engineer The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client IndIcated above and shall not be reproduced except In full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily Indicative of the properties of other apparently similar or Identical materials. Page 120f12. O1-BMSIROI.FLU. K.., CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94081124.0082 Service Date: August 1, 2008 lrerracan 8901 Carpenter FIWY. Ste #100 Dallas, Texas 75247 (214) 630-1010 Client: City of Coppell TX Attn: Rick O'Dell Engineering Dept PO Box 9478 Coppell TX 75019 Material Information Specified Strength: 3600 psi @ 28 Days Report Date: August 12, 2008 Project: Bethel Road I - #ST 99-05 Roadway & Drainage Improvements City Limit Line to Freeport Parkway Coppell, TX Project No.: 94081124 Sample Information Date Cast: August 1, 2008 Time: 1 0:30am Sampled by: Juan Lopez Weather Conditions: Clear, sunny Accumulative Yards: 14 Batch Size (cy): 7.00 Placement Method: Direct Discharge/Chute Sample Locations: Sta. 28+80 Placement Location: Median Sta. 27+70 to 29+30 Batch Time: Plant: 105 Supplier: Southern Star Truck No: 3339 Ticket No: 1328690 Mix 1.0. No.: 9339 Water Added Onsite Before Test: 5 Gallons Water Added Onsite After Test: 0 Gallons Field Test Data Test Slump, inches: Air Content, %: Concrete Temperature, of: Ambient Temperature, of: Plastic Unit Weight, pcf: Result 5.00 3.5 93 94 147.5 Specification Test Method ASTM C143 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 Laboratory Test Data Age at Set Specimen Diameter Area Date Test No. 10 (inches) (sq. inches) Tested (days) 1 1 6.00 28.27 08/08/2008 7 1 2 08/29/2008 28 1 3 08/29/2008 28 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Maximum Compressive Load Strength (Ibs) (psi) 100,840 3,570 Terracon Rep: Juan Lopez Report Distribution: (1) City of Coppell TX (1) Tiseo Paving Company Reviewed by: Eric . C veland. P.E. Senior Pr' t Engineer The tests were performed in general accordance with applicable ASTM, AASHTO. or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except In full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 1 of 1 OI-MWBJROt-Fulure Key