Loading...
ST9905DR-LR080807 SAMPLE PICK-UP Report Number: 94081124.0081 Service Date: July 31, 2008 lrerracon 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Project No.: August 07, 2008 Bethel Road I - #ST 99-05 Roadway & Drainage Improvements City Limit Line to Freeport Parkway Coppell, TX 94081124 Client: City of Coppell TX AUn: Rick O'Dell Engineering Dept PO Box 9478 Coppell TX 75019 Services - Concrete cylinder pickup. Report Date: Project: TOTAL NUMBER OF CONCRETE CYLINDERS PICKED UP: 3 Report No.: No. of Cylinders: 94081124.0080 3 Terracon Rep: Dustin R. Collins Report Distribution: (1) Clly of Coppell TX (1) Tiseo Paving Company Reviewed by: . :J. Cleveland, P.E. .' . S ior Project Engineer The tests were performed In general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusive for the use of the client indicated above and shall not be reproduced except In full without the wrltten consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the locatlon(s) referenced and are not necessarlly Indicative of the properties of other apparently similar or Identical materials. Page 1 of 1 2J.DGRJR23-fulute t<ey CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94081124.0080 Service Date: July 30, 2008 lrerracan 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Batch Time: 8:30am Plant: 125 Supplier: Southern Star Truck No: 7039 Ticket No: 01326276 Mix 1.0. No.: 9339 Water Added Onsite Before Test: 10Gal!ons Water Added Onsite After Test: 0 Gallons Report Date: August 07,2008 Project: Bethel Road I - #ST 99-05 Roadway & Drainage Improvements City Limit Line to Freeport Parkway Coppell, TX Project No.: 940B1124 Sample Information Date Cast: July 30, 200B Time: 9:30am Sampled by: Dustin R. Collins Weather Conditions: Clear Accumulative Yards: 6 Batch Size (cy): 6.00 Placement Method: Direct Discharge Sample Locations: NW corner Placement Location: Median Section at east bound turn lane into 1122 Bethel Rd. Client: City of Cop pel! TX Attn: Rick O'Dell Engineering Dept PO Box 947B Coppel! TX 75019 Material Information Specified Strength: 3000 psi @ 2B Days Field Test Data Test Slump, inches: Air Content, %: Concrete Temperature, OF: Ambient Temperature, of: Plastic Unit Weight, pcf: Result 5.50 2.7 92 95 14B.4 Specification Test Method ASTM C143 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 Laboratory Test Data Age at Set Specimen Diameter Area Date Test No. 10 (inches) (sq. inches) Tested (days) 1 1 6.00 2B.27 OB/06/200B 7 1 2 08/27/2008 28 1 3 OB/27/2008 28 Services _ Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Maximum Compressive Load Stren8th (Ibs) (psi 84,370 2,9BO Report Distribution: (1) City of Coppell TX (1) Tiseo Paving Company Reviewed by: Terracon Rep: Johnny L. Clinton Eric J. Cleveland, P.E. Senior Project Engineer The tests were performed In general accordance with applicable ASTM, AASHTO. or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except In full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the locatlon(s) referenced and are not necessarily indicative of the properties of other apparently similar or Identical materials. Page 1 of 1 DI.wI8IRD1..fuU_K8)' CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94081124.0078 Service Date: "July 28, 2008 lrerracan 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Batch Time: 8:30am Plant: 111 Supplier:" Southern Star Truck No: 114 Ticket No: 01324188 Mix 1.0. No.: 9363 Water Added Onsite Before Test: 12Gallons Water Added Onsite After Test: 0 Gallons Report Date: August 07. 2008 Project: Bethel Road I - #ST 99-05 Roadway & Drainage Improvements City Limit Line to Freeport Parkway Coppell, TX Project No.: 94081124 Sample Information Date Cast: July 28,2008 Time: 9:15am Sampled by: Johnny L. Clinton Weather Conditions: Clear Accumulative Yards: 6 Batch Size (cy): 6.00 Placement Method: Direct Discharge Sample Locations: Middle of crosswalk Placement Location: Crosswalk at far east entrance to USPS facility Client: City of Coppell TX Attn: Rick O'Dell Engineering Dept" PO Box 9478 Coppell TX 75019 Material Information Specified Strength: 3600 psi @ 28 Days Field Test Data Test Slump, inches: Air Content, %: Concrete Temperature, of: Ambient Temperature, of: Plastic Unit Weight, pcf: Result 6.00 3.1 91 94 147.6 Specification Test Method ASTM C143 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 Laboratory Test Data Age at Set Specimen Diameter "Area Date Test No. 10 (inches) (sq. inches) Tested (days) 1 1 6.00 28.27 08/04/2008 7 1 2 08/25/2008 28 1 3 08/25/2008 28 Services _ Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Maximum Compressive Load Strength (Ibs) (psi) 90,230 3,190 Report Distribution: (1) City of Coppell TX (1) Tiseo Paving Company Reviewed by: Terracon Rep: Johnny L. Clinton Eric leveland, P.E. Senior Project Engineer The tests were performed In general accordance with applicable ASTM, AASHTO, or DOT test methods. This report Is exclusively for the use of the client Indicated above and shall not be reproduced except In full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested a.lthe location(s) referenced and are not necessarily Indicative of the properties of other apparently similar or identical materials. 01-t.fNBIR01-FutIn lC.ty Page 1 of 1 CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94081124.0051 Service Date: July 9, 2008 lrerracan 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Batch Time: 6:58am Plant: On-site Supplier: Tiseo Paving Truck No: Ticket No: Mix I.D. No.: 2478M Water Added Onsite Before Test: 0 Gallons Water Added Onsite After Test: 0 Gallons Report Date: August 07. 2008 Project: Bethel Road I - #ST 99-05 Roadway & Drainage Improvements City Limit Line to Freeport Parkway Coppell, TX Project No.: 94081124 SamlJle Information Date Cast: July 9,2008 Time: 7:15am Sampled by: Johnny L. Clinton Weather Conditions: Clear Accumulative Yards: 60 Batch Size (cy): 10.00 Placement Method: Direct Discharge Sample Locations: Sta. 14+00 Placement Location: Bethel Road Sta. 14+00 to Sta. 31+00 Client: City of Coppell TX AUn: Rick O'Dell Engineering Dept PO Box 9478 Coppell TX 75019 Material Information Specified Strength: 3600 psi @ 28 Days Field Test Data Test Slump, inches: Air Content, %: Concrete Temperature, of: Ambient Temperature,oF: Plastic Unit Weight, pcf: Result 1.50 4.4 89 92 148.0 Specification Test Method ASTM C143 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 Laboratorv Test Data Age at Maximum C9mpressive Date Test Load Strength Tested (days) (Ibs) (psi) 07/16/2008 7 121,600 4,300 08/06/2008 28 157,350 5,560 08/06/2008 28 162,870 5,760 Average (28 Days) 5,660 Services _ Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Set No. 1 1 1 Specimen 10 1 2 3 Diameter Area (inches) (sq. inches) 6.00 28.27 6.00 28.27 6.00 28.27 The tests were performed In general accordance with applicable ASTM, AASHTO, or DOT test methods. This report Is exclusIVely for the use of the client indicated above and shall not be reproduced except In full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the locatlon(s) referenced and are not necessarily indicative of the properties of other apparently similar or Identical materials. .. . Page 1 of 10 D1.()GRIR01-Ft.b. Ka~ CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94081124.0051 Service Date: July 9, 2008 lrerracon 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Batch Time: 7:40am Plant: On-site Supplier: Tiseo Paving Truck No: Ticket No: Mix 1.0. No.: 2478M Water Added Onsite Before Test: OGallons Water Added Onsite After Test: 0 Gallons Report Date: August 07,2008 Project: Bethel Road I - #ST 99-05 Roadway & Drainage Improvements City Limit Line to Freeport Parkway Coppell, TX Project No.: 94081124 Sample Information Date Cast: July 9, 2008 Time: 7:45am Sampled by: Johnny L. Clinton Weather Conditions: Clear Accumulative Yards: 170 Batch Size (cy): 10.00 Placement Method: Direct Discharge Sample Locations: Sta. 17+25 Placement Location: Bethel Road Sta. 14+00 to Sta. 31+00 Client: City of Coppell TX AUn: Rick O'Dell Engineering Dept PO Box 9478 Coppell TX 75019 Material Information Specified Strength: 3600 psi @ 28 Days Field Test Data Test Slump, inches: Air Content, %: Concrete Temperature, of: Ambient Temperature, of: Plastic Unit Weight, pcf: Result 1.00 3.0 90 93 150.4 Specification Test Method ASTM C143 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 Laboratory Test Data Age at Maximum Compressive Date Test Load StrenQth Tested (days) (Ibs) (pSI) 07/16/2008 7 146,390 5,180 08/06/2008 28 182,180 6,440 08/06/2008 28 170,480 6,030 Average (28 Days) 6,240 Services _ Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Set No. 2 2 2 Specimen 10 1 2 3 Diameter Area (inches) (sq. inches) 6.00 28.27 6.00 28.27 6.00 28.27 The tests were performed In general accordance with applicable ASTM, MSHTO, or DOT test methods. This report Is exclusively for the use of the client Indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily Indlcallve of the properties of other apparently similar or Identical materials. Page 2 of 10 01-DGRIRD1.Fwn K.y CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94081124.0051 Service Date: July 9, 2008 lrerracan 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Specification Age at Maximum Compressive Date Test Load Strength Tested (days) (Ibs) (psi) 07/16/2008 7 132,710 4,690 08/06/2008 28 181 ,730 6,430 08/06/2008 28 182,870 6,470 Average (28 Days) 6,450 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Client: City of Coppell TX AUn: Rick O'Dell Engineering Dept PO Box 9478 Coppell TX 75019 Material Information Specified Strength: 3600 psi @ 28 Days Batch Time: 8:19am Plant: On-site Supplier: Tiseo Paving Truck No: Ticket No: Mix 1.0. No.: 2478M Water Added Onsite Before Test: 0 Gallons Water Added Onsite After Test: 0 Gallons Field Test Data Test Slump, inches: Air Content, %: Concrete Temperature, of: Ambient Temperature,oF: Plastic Unit Weight, pcf: Result 1.00 3.5 91 94 149.6 Laboratory Test Data Set No. 3 3 3 Specimen ID 1 2 3 Diameter Area (inches) (sq. inches) 6.00 28.27 6.00 28.27 6.00 28.27 Report Date: Augusl 07, 2008 Project: Bethel Road I - #ST 99-05 Roadway & Drainage Improvements City Limit Line to Freeport Parkway Coppell, TX Project No.: 94081124 Sample Information Date Cast: July 9, 2008 Time: 8:35am Sampled by: Johnny L. Clinton Weather Conditions: Clear Accumulative Yards: 290 Batch Size (cy): 10.00 Placement Method: Direct Discharge Sample Locations: Sta. 18+50 Placement Location: Bethel Road Sta. 14+00 to Sta. 31+00 Test Method ASTM C143 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report Is exclusively for the use of the client Indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the localion(s) referenced and are riot necessarily Indicative of the properties of other apparently similar or Identical materials. Page 3 of 10 Ql-oGR/R01.FtAl.... KIY CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94081124.0051 Service Date: July 9, 2008 lrerracan 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Batch Time: 8:54am Plant: On-site Supplier: Tiseo Paving Truck No: Ticket No: Mix I.D. No.: 2478M Water Added Onsite Before Test: 0 Gallons Water Added Onsite After Test: 0 Gallons Report Date: August 07, 2008 Project: Bethel Road I - #ST 99-05 Roadway & Drainage Improvements City Limit Line to Freeport Parkway Coppell, TX Project No.: 94081124 Samole Information Date Cast: July 9, 2008 Time: 9:00am Sampled by: Johnny L. Clinton Weather Conditions: Clear Accumulative Yards: 410 Batch Size (cy): 10.00 Placement Method: Direct Discharge Sample Locations: Sta. 20+00 Placement Location: Bethel Road Sta. 14+00 to Sta. 31+00 Client: City of Coppell TX Attn: Rick O'Dell Engineering Dept PO Box 9478 Coppell TX 75019 Material/nformation Specified Strength: 3600 psi @ 28 Days Field Test Data Test Slump, inches: Air Content, %: Concrete Temperature, of: Ambient Temperature,oF: Plastic Unit Weight, pcf: Result 1.00 3.7 92 94 148.4 Specification Test Method ASTM C143 . ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 Laboratory Test Data . Age at Maximum Compressive Date Test Load Strength Tested (days) (Ibs) (psi) 07/16/2008 7 136,090 4,810 08/06/2008 28 170,600 6,030 08/06/2008 .28 148,220 5,240 Average (28 Days) 5,640 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Set No. 4 4 4 Specimen ID 1 2 3 Diameter Area (inches) (sq. inches) 6.00 28.27 6.00 28.27 6.00 28.27 The lesls were performed in general accordance wilh applicable ASTM. AASHTO, or DOT test methods. This report Is exclusively for the use of the client Indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable 10 the actual samples lesled at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical male rials. Page 4 of 10 oi-oGIMm1.f1Ai. Kay CONCRETE COMPRESSIVE STRENGTH TEST . Report Number: 94081124.0051 Service Date: July 9, 2008 lrerracan 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1 01 0 Batch Time: 9:26am Plant: On-site Supplier: Tiseo Paving Truck No: Ticket No: Mix I.D. No.: 2478M Water Added Onsite Before Test: 0 Gallons Water Added Onsite After Test: 0 Gallons Report Date: August 07, 2008 Project: Bethel Road I - #ST 99-05 Roadway & Drainage Improvements City Limit Line to Freeport Parkway Coppell, TX Project No.: 94081124 SamDle Information Date Cast: July 9, 2008 Time: 9:35am Sampled by: Johnny L. Clinton Weather Conditions: Clear Accumulative Yards: 520 Placement Method: Direct Discharge Sample Locations: Sta. 21 +50 Placement Location: Bethel Road Sta. 14+00 to Sta. 31+00 Client: City of Coppell TX Attn: Rick O'Dell Engineering Dept PO Box 9478 Coppell TX 75019 Material Information Specified Strength: 3600 psi @ 28 Days Field Test Data Test Slump, inches: Air Content, %: Concrete Temperature, of: Ambient Temperature,oF: Plastic Unit Weight, pcf: Result 1.75 4.4 91 95 147.6 Specification Test Method ASTM C143 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 Laboratory Test Data Age at Maximum Compressive Date Test Load Strength Tested (days) (Ibs) (psi) 07/16/2008 7 132,930 4,700 08/06/2008 28 175,700 6,210 08/06/2008 28 165,280 5,850 Average (28 Days) 6,030 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Set No. 5 5 5 Specimen 10 1 2 3 Diameter Area (inches) (sq. inches) 6.00 28.27 6.00 28.27 6.00 28.27 The tests were performed In general accordance with applicable ASTM, AASHTO, or DOT test methods. This report Is exclusively for the use of the client Indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the locatlon(s) referenced and are not necessarily indicative of the properties of other apparently similar or Identical materials. Page 5 of 10 DI.oGR1R01.f'Lb. K.y CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94081124.0051 Service Date: July 9, 2008 lrerracan 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Batch Time: 10:02am Plant: On-site Supplier: Tiseo Paving Truck No: Ticket No: Mix 1.0. No.: 2478M Water Added Onsite Before Test: OGallons Water Added Onsite After Test: 0 Gallons Report Date: August 07,2008 Project: Bethel Road I - #ST 99-05 Roadway & Drainage Improvements City Limit Line to Freeport Parkway Coppell, TX Project No.: 94081124 Sample Information Date Cast: July 9,2008 Time: 10:05am Sampled by: Johnny L. Clinton Weather Conditions: Clear Accumulative Yards: 640 Batch Size (cy): 10.00 Placement Method: Direct Discharge Sample Locations: Sta. 23+00 Placement Location: Bethel Road Sta. 14+00 to Sta. 31+00 Client: City of Coppell TX AUn: Rick O'Dell Engineering Dept PO Box 9478 Coppell TX 75019 Material Information Specified Strength: 3600 psi @ 28 Days Field Test Data Test Slump, inches: Air Content, %: Concrete Temperature, of: Ambient Temperature, of: Plastic Unit Weight, pcf: Result 1.75 4.4 92 95 151.6 Specification Test Method ASTM C143 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 Laboratory Test Data Age at Maximum Compressive Date Test Load Strength Tested (days) (Ibs) (psi) 07/16/2006 7 138,120 4,880 08/06/2008 28 169,120 5,980 08/06/2008 28 155,940 5,510 Average (28 Days) 5,750 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Set No. 6 6 6 Specimen 10 1 2 3 Diameter Area (inches) (sq. inches) 6.00 28.27 6.00 26.27 6.00 28.27 \. The tests were performed in general accordance with applicable ASTM. AASHTO, or DOT test methods. This report Is exclusively for the use of the client Indicated above and shall not be reproduced except In full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the localion(s) referenced and are not necessarily Indicative of the properties of other apparently similar or Identical materials. . . . . Page 6 of 10 DHX.RIROH........ KIY CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94081124.0051 Service Date: July 9, 2008 lrerracan 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Client: City of Coppell TX AUn: Rick O'Dell Engineering Dept PO Box 9478 Coppell TX 75019 Material Information Specified Strength: 3600 psi @ 28 Days Report Date: August 07, 2008 Project: Bethel Road I - #ST 99-05 Roadway & Drainage Improvements City Limit Line to Freeport Parkway Coppell, TX Project No.: 94081124 Sample Information Date Cast: July 9,2008 Time: 10:30am Sampled by: Johnny L. Clinton Weather Conditions: Clear Accumulative Yards: 750 Batch Size (cy): 10.00 Placement Method: Direct Discharge Sample Locations: Sta. 24+75 Placement Location: Bethel Road Sta. 14+00 to Sta. 31+00 Batch Time: 10:34am Plant: On-site , Supplier: Tiseo Paving Truck No: Ticket No: Mix I.D. No.: 2478M Water Added Onsite Before Test: 0 Gallons Water Added Onsite After Test: 0 Gallons Field Test Data Test Slump, inches: Air Content, %: Concrete Temperature, of: Ambient Temperature, of: Plastic Unit Weight, pcf: Result 1.00 2.4 92 96 154.4 Specification Test Method ASTM C143 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 Laboratory Test Data Age at Maximum Compressive Date Test Load Strength Tested (days) (Ibs) (psi) 07/16/2008 7 150,230 5,310 08/06/2008 28 188,290 6,660 08/06/2008 28 198,190 7,010 Average (28 Days) . 6.840 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Set No. 7 7 7 Specimen 10 1 2 3 Diameter Area (inches) (sq. inches) 6.00 28.27 6.00 28.27 6.00 28.27 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report Is exclusively for the use of the client Indicated above and shall not be reproduced except In full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily Indicative of the properties of other apparently sImilar or Identical materials. Page 7 of 10 D~Dl.ful..K(lY CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94081124.0051 Service Date: July 9, 2008 lrerracan 8901 Carpenter F/WY, Ste #100 Dallas, Texas 75247 (214) 630-1010 Batch Time: 11 :OOam Plant: On-site Supplier: Tiseo Paving Truck No: Ticket No: Mix 1.0. No.: 2478M Water Added Onsite Before Test: o Gallons Water Added Onsite After Test: 0 Gallons Report Date: August 07, 2008 Project: Bethel Road I - #ST 99-05 Roadway & Drainage Improvements City Limit Line to Freeport Parkway Coppell, TX Project No.: 94081124 Sample Information Date Cast: July 9, 2008 Time: 11 :05am Sampled by: Johnny L. Clinton Weather Conditions: Clear Accumulative Yards: 850 Placement Method: Direct Discharge Sample Locations: Sta. 25+75 Placement Location: Bethel Road Sta. 14+00 to Sta. 31+00 Client: City of Coppell TX AUn: Rick O'Dell Engineering Dept PO Box 9478 Coppell TX 75019 Material Information Specified Strength: 3600 psi @ 28 Days Field Test Data Test Slump, inches: Air Content, %: Concrete Temperature, of: Ambient Temperature,oF: Plastic Unit Weight, pcf: Result 1.00 4.4 92 97 150.4 Specification Test Method ASTM C143 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 Laboratory Test Data Age at Maximum Compressive Date Test Load Strength Tested (days) (Ibs) (psi) 07/16/2008 7 134,150 4,740 08/06/2008 28 165,950 5,870 08/06/2008 28 175,410 6,200 Average (28 Days) 6,040 Services - Obtain samples of fresh concrete at the placement locations, perform required neld tests and cast compressive strength samples. Set No. 8 8 8 Specimen 10 1 2 3 Diameter Area (inches) (sq. inches) 6.00 28.27 6.00 28.27 6.00 28.27 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report ilil exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) rererenced and are not necessarily Indicative of the properties of other apparently similar or Identical' materials. Page B of 10 01.OGAIROloflA16o KoV CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94081124.0051 Service Date: July 9, 2008 lrerracan 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Specification Age at Maximum Compressive Date Test Load Strength Tested (days) (Ibs) (psi) 07/16/2008 7' 145,160 5,130 08/06/2008 28 168,710 5,970 08/06/2008 28 174,490 6,170 Average (28 Days) 6,070 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Client: City of Coppell TX AUn: Rick O'Dell Engineering Dept PO Box 9478 Coppell TX 75019 Material Information Specified Strength: 3600 psi @ 28 Days Batch Time: 11 :34am Plant: On-site Supplier: Tiseo Paving Truck No: Ticket No: Mix I.D. No.: 2478M Water Added Onsite Before Test: OGallons Water Added Onsite After Test: 0 Gallons Field Test Data Test Slump, inches: Air Content, %: Concrete Temperature, of: Ambient Temperature,oF: Plastic Unit Weight, pcf: Result 1.00 4.4 92 98 150.8 Laboratory Test Data Set No. 9 9 9 Specimen ID 1 2 3 Diameter Area (inches) (sq. inches) 6.00 28.27 6.00 28.27 6.00 28.27 Report Date: August 07, 2008 Project: Bethel Road I - #ST 99-05 Roadway & Drainage Improvements City Limit Line to Freeport Parkway Coppell, TX Project No.: 94081124 SamIJle Information Date Cast: July 9, 2008 Time: 11 :35am Sampled by: Johnny L. Clinton Weather Conditions: Clear Accumulative Yards: 960 Batch Size (cy): 10.00 Placement Method: Direct Discharge Sample Locations: Sta. 27+00 Placement Location: Bethel Road Sta. 14+00 to Sta. 31+00 Test Method ASTM C143 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 The tests were performed In general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the locatlon(s) referenced and are not necessarily Indicative of the properties of other apparently similar or Identical materials. Page 9 of1 0 OI.QGRIRO,"'we K.~ CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94081124.0051 Service Date: July 9, 2008 lrerracan 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1 01 0 Batch Time: 12:21pm Plant: On-site Supplier: Tiseo Paving Truck No: . Ticket No: Mix I.D. No.: 2478M Water Added Onsite Before Test: 0 Gallons Water Added Onsite After Test: 0 Gallons Report Date: August 07,2008 Project: Bethel Road I - #ST 99-05 Roadway & Drainage Improvements City Limit Line to Freeport Parkway Coppell, TX Project No.: 94081124 Samnle Information Date Cast: July 9,2008 Time: 12:30pm Sampled by: Johnny L. Clinton Weather Conditions: Clear Accumulative Yards: 1120 Batch Size (cy): 10.00 Placement Method: Direct Discharge Sample Locations: Sta.29+75 Placement Location: Bethel Road Sta. 14+00 to Sta. 31+00 Client: City of Coppell TX AUn: Rick O'Dell Engineering Dept PO Box 9478 Coppell TX 75019 Material Information Specified Strength: 3600 psi @ 28 Days Field Test Data Test Slump, inches: Air Content, %: . Concrete Temperature, of: Ambient Temperature,oF: Plastic Unit Weight, pcf: Result 1.00 4.3 91 98 152.8 Specification Test Method ASTM C143 ASTM C23.1 ASTM C1064 . ASTM C1064 ASTM C138 Laboratory Test Data Age at Maximum Compressive Date Test Load Strength Tested (days) (Ibs) (psi) 07/16/2008 7 136,530 4,830 08/06/2008 28 157,700 5,580 08/06/2008 28 162,340 5,740 Average (28' Days) 5,660 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Set No. 10 10 10 Specimen ID 1 2 3 Diameter Area (inches) (sq. inches) 6.00 28.27 6.00 28.27 . 6.00 28.27 Report Distribution: (1) City of Coppell TX (1) Tiseo Paving Company Revi.ewed by: Terracon Rep: Johnny L. Clinton Eric . Cleveland, P.E. Senior Project Engineer The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report Is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or Identical materials. Page 10 of 10 D1-OGRIR01.f'Lbe Key