Loading...
ST9905DR-LR080806 SAMPLE PICK-UP Report Number: 94081124.0077 Service Date: July 26, 2008 lrerracan 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Client: City of Coppell TX . AUn: Rick O'Dell Engineering Dept PO Box 9478 . Coppell TX 75019 Services - Concrete cylinder pickup. Report Date: Project: Project No.: TOTAL NUMBER OF CONCRETE CYLINDERS PICKED UP: 3 Report No.: No. of Cylinders: 94081124.0076 3 August 06, 2008 Bethel Road I - #ST 99-05 Roadway & Drainage Improvements City Limit Line to Freeport Parkway Coppell, TX 94081124 .Terracon Rep: Bradley W.Hatch Eric J. eland, P.E. Senior Project Engineer The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report Is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples !ested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Report Distribution: (1) Cily of Coppel! TX (1) Tiseo Paving Company Page 1 of 1 Reviewed by: 21-8MS/R21-f'wn follY CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94081124.0050 Service Date: July 8, 2008 lrerracan 8901 Carpenter Frwy, ste #100 Dallas, Texas 75247 . (214) 630-1010 Age at Maximum Compressive Date Test Load Strength Tested (days) (Ibs) (psi) 07/15/2008 7 133,470 4,720 08/05/2008 28 188,020 6,650 08/05/2008 28 189,400 6,700 Average (28 Days) 6,680 Services _ Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Client: City of Coppell TX AUn: Rick O'Dell Engineering Dept PO Box 9478 . Coppell TX 75019 Material Information Specified Strength: 3600 psi @ 28 Days Batch Time: 7:19am Plant: On Site Supplier: Tiseo Paving Truck No: Ticket No: Mix 1.0. No.: 2478M Water Added Onsite Before Test: 0 Gallons Water Added Onsite After Test: 0 Gallons Field Test Data Test Slump, inches: Air Content, %: Concrete Temperature, of: Ambient Temperature,oF: Plastic Unit Weight, pcf: Result 0.75 2.1 89 92 152.8 Laboratory Test Data Set No. 1 1 1 Specimen 10 1 2 3 Diameter Area (inches) (sq. inches) 6.00 28.27 6.00 28.27 6.00 28.27 Report Date: August 06, 2008 Project: Bethel Road I - #ST 99-05 Roadway & Drainage Improvements City Limit Line to Freeport Parkway Coppell, TX Project No.: 94081124 Sam"/e Information Date Cast: July 8, 2008 Time: 7:35am Sampled by: Johnny L. Clinton Weather Conditions: Clear Accumulative Yards: 40 Batch Size (cy): 10.00 Placement Method: Direct Discharge Sample Locations: Bethel Road Sta. 0+15 Placement Location: Bethel Road from Sta. 0+00 to 14+50 Specification Test Method ASTM.C143 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report Is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or Identical materials. 01-MY1El1ROt.FUU',Koy Page 1 of 10 : .:. CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94081124.0050 Service Date: July 8, 2008 lrerracan 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Batch Time: 8:01 am Plant: On Site Supplier: Tiseo Paving Truck No: Ticket No: Mix 1.0. No.: 2478M Water Added Onsite Before Test: 5 Gallons Water Added Onsite After Test: 0 Gallons Field Test Data Test Slump, inches: Air Content, %: Concrete Temperature, of: Ambient Temperature,oF: Plastic Unit Weight, pcf: Report Date: August 06,2008 Project: Bethel Road I - #ST 99-05 Roadway & Drainage Improvements City Limit Line to Freeport Parkway Coppell, TX Project No.: 94081124 Sample Information Date Cast: July 8, 2008 Time: 8:05am Sampled by: Johnny L. Clinton Weather Conditions: Clear Accumulative Yards: 150 Batch Size (cy): 10.00 Placement Method: Direct Discharge Sample Locations: Bethel Road Sta. 1 +50 Placement Location: Bethel Road from Sta. 0+00 to 14+50 Client: City of Coppell TX AUn: Rick O'Dell Engineering Dept PO Box 9478 Coppell TX 75019 Material Information Specified Strength: 3600 psi @ 28 Days Result 1.75 4.4 90 94 149.2 Specification Test Method ASTM C143 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 Laboratory Test Data Age at Maximum Compressive Date Test Load Strength Tested (days) (Ibs) (psi) 07/15/2008 7 143.100 5,060 08/05/2008 28 175,950 6,220 08/05/2008 28 171.940 6,080 Average (28 Days) 6,150 Services _ Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Set No. 2 2 2 Specimen 10 1 2 3 Diameter Area (inches) (sq. inches) 6.00 28.27 6.00 .28.27 6.00 28.27 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report Is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the locatlon(s) referenced and are not necessarily indicative of the properties of other apparently similar or Identical materials. Page 2 of 10 01-IMt'B/ROI.fwi Koy CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94081124.0050 Service Date: July 8, 2008 lrerracan 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Age at Maximum Compressive Date Test Load Strength Tested (days) (Ibs) (psi) 07/15/2008 .7 138,080' 4,880 08/05/2008 28 188,150 6,650 08/05/2008 28 183,860 6,500 Average (28 Days) 6,580 Services _ Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Client: City of Coppell TX AUn: Rick O'Dell Engineering Dept PO Box 9478 Coppell TX 75019 Material Information Specified Strength: 3600 psi @ 28 Days Batch Time: 8:38am Plant: On Site Supplier: Tiseo Paving Truck No: Ticket No: Mix I.D. No.: 2478M Water Added Onsite Before Test: OGallons Water Added Onsite After Test: 0 Gallons Field Test Data Test Slump, inches: Air Content, %: Concrete Temperature, of: Ambient Temperature,oF: Plastic Unit Weight, pct: Result 1.00 4.4 92 96 152.8 Laboratorv Test Data Set No. 3 3 3 Specimen 10 1 2 3 Diameter Area (inches) (sq. inches) 6.00 28.27 6.00 28.27 6.00 28.27 Report Date: August 06, 2008 Project: Bethel Road I - #ST 99-05 Roadway & Drainage Improvements City Limit Line to Freeport Parkway Coppell, TX Project No.: 94081124 Sample Information Date Cast: . July 8, 2008 Time: 9:00am Sampled by: Johnny L. Clinton Weather Conditions: Clear Accumulative Yards: 350 Batch Size (cy): 10.00 Placement Method: Direct Discharge Sample Locations: Bethel Road Sta. 3+20 Placement Location: Bethel Road from Sta. 0+00 to 14+50 Specification Test Method ASTM C143 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report Is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 3 of 10 ot.MWEIIROI.,..... KIY CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94081124.0050 Service Date: July 8, 2008 lrerracan 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Batch Time: 9:48am Plant: On Site Supplier: Tiseo Paving Truck No: Ticket No: Mix 1.0. No.: 2478M Water Added Onsite Before Test: o Gallons Water Added Onsite After Test: 0 Gallons Field Test Data Test Slump, inches: Air Content, %: Concrete Temperature, of: Ambient Temperature,oF: Plastic Unit Weight, pcf: Report Date: August 06, 2008 Project: Bethel Road I - #ST 99-05 Roadway & Drainage Improvements City Limit Line to Freeport Parkway Coppell, TX Project No.: 94081124 SamDle Information Date Cast: July 8, 2008 Time: 9:50am Sampled by: Johnny L. Clinton Weather Conditions: Clear Accumulative Yards: 410 Batch Size (cy): 10.00 Placement Method: Direct Discharge Sample Locations: Bethel Road Sta. 5+00 Placement Location: Bethel Road from Sta. 0+00 to 14+50 Client: City of Coppell TX AUn: Rick O'Dell Engineering Dept PO Box 9478 Coppell TX 75019 Materia/. Information Specified Strength: 3600 psi @ 28 Days Result 1.50 3.3 91 96 149.2 Specification Test Method ASTM C143 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 Laboratory Test Data Age at Maximum Compressive Date Test Load Strength Tested (days) (Ibs) (psi) 07/15/2008 7 139,730 4,940 08/05/2008 28 158,300 5,600 08/05/2008 28 174,530 6,170 Average (28 Days) 5,890 Services _ Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Set No. 4 4 4 Specimen 10 1 2 3 Diameter Area (inches) (sq. inches) 6.00 28.27 6.00 28.27 6.00 28.27 The tests were performed In general accordance with applicable ASTM, AASHTO, or DOT test methods. This report Is exclusively for the use of the client indicated above and shall nol be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the locatlon(s) referenced and are not necessarily Indicative of the properties of other apparently similar or identical materials. Page 4 of 10 Dl-M'M11R01-fLUe K..., CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94081124.0050 Service Date: July 8, 2008 lrerraccn 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Batch Time: 1 0:44am Plant: On Site Supplier: Tiseo Paving Truck No: Ticket No: Mix I.D. No.: 2478M Water Added Onsite Before Test: OGallons Water Added Onsite After Test: 0 Gallons Field Test Data Report Date: August 06, 2008' Project: Bethel Road I - #ST 99-05 Roadway & Drainage Improvements City Limit Line to Freeport Parkway Coppell, TX Project No.: 94081124 Samole Information Date Cast: July 8, 2008 Time: 10:35am Sampled by: Johnny L. Clinton Weather Conditions: Clear Accumulative Yards: 530' Batch Size (cy): 10.00 Placement Method: Direct Discharge Sample Locations: Bethel Road Sta. 6+70 Placement Location: Bethel Road from Sta. 0+00 to 14+50 Client: City of Coppell TX , AUn: Rick O'Dell Engineering Dept PO Box 9478 Coppell TX 75019 Material Information Specified Strength: 3600 psi @ 28 Days Test Slump, inches: Air Content, %: Concrete Temperature, of: Ambient Temperature,oF: Plastic Unit Weight, pcf: Result 2.00 3.3 91 97 149.2 Specification Test Method ASTM 'C143 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 Laboratorv Test Data Age at Maximum Compressive Date Test Load Strength Tested (days) (Ibs) (psi) 07/15/2008 7 129,570 4,580 08/05/2008 28 191,140 6,760 08/05/2008 28 181,420 6,420 Average (28 Days) 6,590 Services - Obtain samples of fresh concret,e at the placement locations, perform required field tests and cast compressive strength samples. Set No. 5 5 5 Specimen 10 1 2 3 Diameter Area (inches) (sq. inches) 6.00 28.27 6.00 28.27 6.00 28.27 The tests were performed In general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the, use of the client indicated above and shall not be reproduced except in full without the written consent of our company. 'Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or Identical materials. Page 5 of 10 01-MWB1ROt.Fliln Key CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94081124.0050 SerVice Date: July 8, 2008 lrerracan 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Batch Time: 11 :20am Plant: On Site Supplier: Tiseo Paving Truck No: Ticket No: Mix I.D. No.: 2478M Water Added Onsite Before Test: OGallons Water Added On site After Test: 0 Gallons Field Test Data Report Date: August 06, 2008 Project: Bethel Road I - #ST 99-05 Roadway & Drainage Improvements City Limit Line to Freeport Parkway Coppell, TX Project No.: 94081124 Sample Information Date Cast: July 8, 2008 Time: 11 :30am Sampled by: Johnny L. Clinton Weather Conditions: Clear Accumulative Yards: 640 Batch Size (cy): 10.00 Placement Method: Direct Discharge Sample Locations: Bethel Road Sta. 8+50 Placement Location: Bethel Road from Sta. 0+00 to 14+50 Client: City of Coppell TX AUn: Rick O'Dell Engineering Dept PO Box 9478 Coppell TX 75019 Material Information Specified Strength: 3600 psi @ 28 Days Test Slump, inches: Air Content, %: Concrete Temperature, of: Ambient Temperature, of: Plastic Unit Weight, pcf: Result 1.00 3.8. 92 97 147.6 Specification Test Method ASTM C143 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 Laboratory Test Data Age at Maximum Compressive Date Test Load Strength Tested (days) (Ibs) (psi) 07/15/2008 7 117,340 4,150 08/05/2008 28 162.440 5,740 08/05/2008 28 176,810 6,250 Average (28 Days) 6,OQO Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Set No. 6 6 6 Specimen 10 1 2 3 Diameter Area (inches) (sq. inches) 6.00 28.27 6.00 28.27 6.00 28.27 The tests were performed In general accordance with applicable ASTM, AASHTO, or DOT test methods. This report Is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily Indicative of the properties of other apparenlly similar or identical materials. Page 6 of 10 01.MW8IROt-FtAn tclV CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94081124.0050 Service Date: July 8, 2008 lrerracan 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Batch Time: 12:13pm Plant: On Site Supplier: Tiseo Paving Truck No: Ticket No: Mix I.D. No.: 2478M Water Added Onsite Before Test: o Gallons Water Added Onsite After Test: 0 Gallons Field Test Data Test Slump, inches: Air Content, %: Concrete Temperature, of: Ambient Temperature,oF: Plastic Unit Weight, pcf: Report Date: August 06, 2008 Project: Bethel Road I - #ST 99-05 Roadway & Drainage Improvements City Limit Line to Freeport Parkway Coppell, TX Project No.: 94081124 Sample Information Date Cast: July 8,2008 Time: 12:30pm Sampled by: Johnny L. Clinton Weather Conditions: Clear Accumulative Yards: 760 Batch Size (cy): 10.00 Placement Method: Direct Discharge Sample Locations: Bethel Road Sta. 9+75 Placement Location: Bethel Road from Sta. 0+00 to 14+50 Client:- City of Coppell TX Altn: Rick O'Dell Engineering Dept PO Box 9478 Coppell TX 75019 Material Information Specified Strength: 3600 psi @ 28 Days Result 1.50 4.7 93. 97 146.4 Specification Test Method ASTM C143 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 Laboratorv Test Data Age at Maximum Compressive Diameter Area Date Tes.t Load Strength (inches) (sq. inches) Tested (days) (Ibs) (psi) 6.00 28.27 07/15/2008 7 .130,260 4,610 6.00 28.27 08/05/2008 28 161,120 5,700 6.00 28.27 08/05/2008 28 166,470 5,890 . Average (28 Days) 5,800 Services _ Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Set No. 7 7 7 Specimen 10 1 2 3 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report Is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the locatlon(s) referenced and are not necessarily Indicative of the properties of other apparently similar or IdenUcal materials. Page 7 of 10 01-MVl'81R01-FiAL...Kev CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94081124.0050 Service Date: July 8, 2008 lrerracan 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1 01 0 Batch Time: 1 :OOpm Plant: On Site Supplier: Tiseo Paving Truck No: Ticket No: Mix I.D. No.: 2478M Water Added On site Before Test: o GaJlons Water Added On site After Test: . 0 Gallons Field Test Data Report Date: August 06, 2008 Project: Bethel Road I - #ST 99-05 Roadway & Drainage Improvements City Limit Line to Freeport Parkway Coppell, TX Project No.: 94081124 Sample Information Date Cast: July 8, 2008 Time: 1 :05pm Sampled by: Johnny L. Clinton Weather Conditions: Clear Accumulative Yards: 870 Batch Size (cy): 10.00 Placement Method: Direct Discharge Sample Locations: Bethel Road Sta. 11 +30 I Placement Location: Bethel Road from Sta. 0+00 to 14+50 Client: City of Coppell TX AUn: Rick O'Dell. Engineering Dept PO Box 9478 Coppell TX 75019 Material Information Specified Strength: 3600 psi @ 28 Days Test Slump, inches: Air Content, %: Concrete Temperature, of: Ambient Temperature,oF: Plastic Unit Weight, pcf: Result. 1.00 2.7 93 98 152.8 Specification Test Method ASTM C143 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 Laboratory Test Data Age at Maximum Compressive Date Test Load Strength Tested (days) (Ibs) (psi) 07/15/2008 7 145,120 5,130 08/05/2008 28 184,020 6,510 08/05/2008 28 172,130 6,090 Average (28 Days) 6,300 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Set No. 8 B B Specimen ID 1 2 3 Diameter Area (inches) (sq. inches) 6.00 28.27 6.00 28.27 6.00 28.27 The tests were performed In general accordance with applicable ASTM, AASHTO, or DOT test methods. This report Is exclusively for the use of the client Indicated above and shall not be reproduced except In full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the locatlon(s) referenced and are not necessarily Indicative of the properties of other apparently similar or Identical materials. Page 8 of 10 01.M'vWIRO,.fllL.. KIIY CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94081124.0050 Service Date: July 8, 2008 lrerracan 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Client: City of Coppell TX AUn: Rick O'Dell Engineering Dept PO Box 9478 Coppell TX 75019 Material Information Specified Strength: 3600 psi @ 28 Days Batch Time: 1 :42pm Plant: On Site Supplier: Tiseo Paving Truck No: Ticket No: Mix J.D. No.: 2478M Water Added Onsite Before Test: 0 Gallons Water Added Onsite After Test: 0 Gallons Field Test Data Test Slump, inches: Air Content, %: Concrete Temperature, of: Ambient Temperature,oF: Plastic Unit Weight, pct: Result 1.75 2.7 92 98 149.6 Report Date:August 06, 2008 Project: Bethel Road I - #ST 99-05 Roadway & Drainage Improvements City Limit Line to Freeport Parkway Coppell, TX Project No.: 94081124 Sample Information Date Cast: July 8, 2008 Time: 1 :45pm Sampled by: Johnny L. Clinton Weather Conditions: Clear Accumulative Yards: 980 Batch Size (cy): 10.00 Placement Method: Direct Discharge Sample Locations: Bethel Road Sta. 12+75 Placement Location: Bethel Road from Sta. 0+00 to 14+50 Specification Age at Maximum Compressive Date Test Load Strength Tested (days) (Ibs) (psi) 07/15/2008 7 145,320 5,140 08/05/2008 28 174,280 6,160 08/05/2008 28 167,610 5,930 Average (28 Days) 6,050 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Laboratorv Test Data Set No. 9 9 9 Specimen 10 1 2 3 Diameter Area (inches) (sq. inches) 6.00 28.27 6.00 28.27 6.00 28.27 Test Method ASTM C143 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 The lests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report Is exclusively for the use of the client Indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the locatlon(s) referenced and are not necessarily Indicative of the properties of other apparently similar or Identical materials. Page 9 of 10 D1-M'NB/ROt.FLtln Kev CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94081124.0050 Service Date: July 8, 2008 lrerracan 8901 Carpenter Frwy, Ste #1 00 Dallas, Texas 75247 (214) 630-1010 Client: City of Coppell TX AUn: Rick O'Dell Engineering Dept PO Box 9478 Coppell TX 75019 Material Information Specified Strength: 3600 psi @ 28 Days Report Date: August 06, 2008 Project: Bethel Road I - #ST 99-05 Roadway & Drainage Improvements . City Limit Line to Freeport Parkway Coppell, TX Project No.: 94081124 Sample Information Date Cast: July 8, 2008 Time: 2:30pm Sampled by: Johnny L. Clinton Weather Conditions: Clear Accumulative Yards: 1080/1100 Batch Size (cy): 10.00 Placement Method: Direct Discharge Sample Locations: Bethel Road Sta. 14+25 Placement Location: Bethel Road from Sta. 0+00 to 14+50 Batch Time: 2:30pm Plant: On Site Supplier: Tiseo Paving Truck No: Ticket No: Mix I.D. No.: 2478M Water Added Onsite Before Test: OGallons Water Added Onsite After Test: 0 Gallons Field Test Data Test Slump, inches: Air Content, %: Concrete Temperature, of: Ambient Temperature, of: Plastic Unit Weight, pcf: Result 1.00 2.8 94 99 149.6 Specification Test Method ASTM .C143 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 Laboratory Test Data . Age at Maximum Compressive Date Test Load Strength Tested (days) (Ibs) (pSi) 07/15/2008 7 87,630 3,100 08/05/2008 28 143,940 5,090 08/05/2008' 28 166,980 5,910 Average (28 Days) 5,500 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Set No. 10 10 10 Specimen ID 1 2 3 Diameter Area (inches) (sq. inches) 6.00 28.27 6.00 28.27 6.00 28.27 Report Distribution: (1) City of Coppell TX (1) Tiseo Paving Company Reviewed by: Terracon Rep: Johnny L. Clinton Eric J. Cleveland, P.E. Senior Project Engineer The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively tor the use of the client indicated above and shall not be reproduced except In full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) reterenced and are not necessarily indicative of the properties ot other apparently similar or Identical materials. . Page 10 of 10 01-MWBm01..FtJln Koy