Rolling Oaks MC-CS080814
..
FAIN
BuildlngRelaliriOshipo
ConslrUCling Futur.~
P.O. Box 750
FortWorlh, TX 76101
817-921-4388
817-927-4389 Fax
www.thefalrn:ompany.com
August 14, 2008
Ken Baxter
J. Stuart Todd, Ine"
2919 Welborn SUite 101
Dallas, TX 75219
RE: Rolling Oaks Memorial Center
Fire hydrant addition
Mr. Baxter:
We have reeeivedthe request forehange for the addition ofth6 frrehydrant. We offer the
following quotation in response toyoUfrequest.
Cut in 8" x 6" tee wi sleeve
6" gate valve
6" C-900 pipe
Fire hydrant
Overhead & Profit @ 10%
Bond 2.00%
Total Change
$550.00
$725.00
$300.00
$2,150.00
$372.50
$81.95
$4,179.45
S~J--
Alex Fisher
TITLE: Fire hydrant add
PCO Item:
Roiling Oaks Mllmorlal Center
Coppell, TX
Additional FAIN Labor Items:
Crew
Unit
Hours
Labor
Rate
Labor
Cost
Ea
o $
$
Subtotal FAIN Labor:
Burder @ 55%:
Total FAIN Labor:
$
$
$
IAdditional FAIN Material Items:
Quantity
Unit
Unit Cost
Material Cost
$
$
Total Material:
$
Additional FAIN Equipment:
Quantity
Unit
Hours Equipment Unit Equipment Cost
$
$
Subtotal FAIN Equipment
Fuel, Oil & Grease:
Total FAIN Eaulpment:
$
$
$
Unit Price Total.
$ 550.00 $ 550.00
$ 725.00 $ 725.00
$ 30.00 $ 300.00
$ 2,150.00 $ 2,150.00
$ 3,725.00 II
IAdditional Subcontractor Items:
Cut in 8" x 6" Tee wI sleeve
6" gate valve
6" C.900 pipe
Fire hydrant
Quantities Unit
1 aa
1 aa
10 If
1 ea
Total Subcontractor Items:
Sum mati' of Costs
Total Subcontractor Items:
10% Overhead & Profit
TOTAL
$ 3; 725.00
$ 372.50
$ 4,097.50
$ 81.95
~ 4,179.45
Subtotal
Bond - 2.00%
TGR Constructors;.lnc.
P.O. Box 155219
Fort Worth, Texas 76155-0219
CHANGE REQUEST FORM
Project: Rolling Oaks Memorial Center
Date:
8/8/2008
Owner: The City of Cappel!
Project # 2008-004
Change Request #
One
Description
Quantity UOM
Unit
Price
Total
Price
Additions
1
2
3
4
5
6
7
8
9
10
Cut in 8" x 6" Tee W/Sleeve 1 ea $ 550.00, $ 550.00
6" Gate Valve 1 ea $ 725.00 $ 725.00
6" C-900 Pipe 10 If $ 30.00 $ 300.00
Fire. Hydrant 1 ea $ 2,150.00 $ 2,150.00
$ -
$ -
$ -
$ -
'I $ -
$ -
TotalAdditions $ 3,725.00
Deletions
1
2
3
4
5
6
7
8
9
10
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
1$ -
Total Deletions $
Description of Changes
The city is requesting an additional tire hydrant be added to the project.
Net Change $ 3,725.00
Submitted By: