Loading...
WA9601B-LR 990811StanTech Engineering Co. 9200 King Aahur Drive Dallas, Texas 75247-3610 Phone 214/631-4372 Fax 214/631-4380 Mr. Kenneth Griffin, P.E. Project No.: 1520COP01 City of Coppell Project: Sandy Lake Road 255 Parkway Boulevard Location: Utility Trench Backfill Post Office Box 478 Report No.: 27/0571 CopFell, Texas 75019-4409 RESULTS OF FIELD DENSITY TESTS TEST DATE PETEST TEST LOCATION LIFT/ PROCTOR FIELD FIELD PERCENT NO. OF DEPTH TEST DENSITY MOISTURE OF TEST NO. PCF % SPECIFIED NUIViBER COMPACTION 65 08/11/99 24" Water Line Backfill @ Sta. 15+00 -4' 1 107.8 15.8 97.7 66 08/11/99 24" Water Line Backfill @ Sta. 15+30 -1' 1 105.1 15.6 95.2 67 08/11/99 24" Water Line Backfill @ Sta. 11+75 -4' 2 99.9 15.3 95.4 68 08/11/99 24" Water Line Backfill @ Sta. 12+00 Final 2 99.6 16.7 95.1 TESTS PERFORMED BY: Walter Kirby TEST METHODS: ASTM D 2922, D 3017, D 1558, D2167 OR D 2937 REMARKS: PROCTOR NO.: 1 - 110.4 pcf~ 15.6% Moisture 2 - 104.7 pcf@ 13.9% Moisture 3 - 107.6 pcf@ 17.3% Moisture 4-119.0 pcf@ 12.3% Moisture Average of # 1 and #4 - 115.1 pcf @ 13.9% Moisture 5-114.9 pcf@ 13.6% Moisture SPECIFICATION: 95% Compaction @ Optimum to +5% DISTRIBUTION: