Rolling Oaks MC-LR080626
Compaction
Test Report
Y CTL I THOMPSON
T E X A S. L L C
CLIENT: CITY OF COPPELL
255 PARKWAY BOULEVARD
P.O. BOX 478
COPPELL TX 75019
DATE: OR/?RtnR PROJECT NUMBER: DAORi"? 000
Phase: 345 REPORT NUMBER: ---L SHEET; ---1- OF ......L
SUBJECT: ROLLING OAKS MEMORIAL CENTER PHASE I
FREEPORT PARKWAY
COPPELL, TX
TEST 1 LABORATORY FIELD
NO. LOCATION DEPTH TEST MAX OMC"Io DRY MC"Io COM- SOIL TYPE
TYPE DENSITY DENSITY PACTION
FEET PCF PCF "10
10' SOUTH AND 10' EAST OF THE NWC CURVE NO 3
19 OF THE PAVILLION BUILDING 1.0 NUC 119.0 11.5 117.3 12.1 99 JOB NO DAOa152.000
25' SOUTH AND 40' EAST OF THE NWC CURVE NO 3
20 OF THE PAVILLlON BUILDING 1.0 Nue 119.0 11.5 117.8 11.9 99 JOB NO DAoa152.ooo
5' SOUTH AND 20' EAST OF THE NWC CURVE NO 3
21 OF THE PAVILLION BUILDING 0.0 Nue 119.0 11.5 118.3 11.6 99 JOB NO DAOa152.000
20' SOUTH AND 50' EAST OF THE NWC CURVE NO 3
22 OF THE PAVILLION BUILDING 0.0 Nue 119.0 11.5 118.0 11.9 99 JOB NO DAOa152.000
5' SOUTH AND 10' WEST OF THE NEC CURVE NO 3
23 OF THE COLUMBARIUM BUILDING 0.0 Nue 119.0 11.5 117.0 12.3 98 JOB NO DA08152.000
20' SOUTH AND 30' WEST OF THE NEC CURVE NO 3
24 OF THE COLUMBARIUM BUILDING 0.0 Nue 119.0 11.5 117.3 12.0 99 JOB NO DAoa152.000
30' SOUTH AND 50' WEST OF THE NEC CURVE NO 3
25 OF THE COLUMBARIUM BUILDING 0.0 Nue 119.0 11.5 117.1 12.1 98 JOB NO DAoa152.000
UNDER SLAB FILL
1 BELOW SUBGRADE
SPECIFICATIONS: 95
MOISTURE WITHIN
% OF MAXIMUM
-1 TO +3
ASTM D 698
% OF OPTIMUM
THIS REPORT PRESENTS OPINIONS FORMED AS A RESULT OF
OUR OBSERVATION OF FILL PLACEMENT, AS WELL AS THE TESTS
SHOWN ABOVE, WE HAVE RELIED UPON THE CONTRACTOR TO
APPLY THE NECESSARY COMPACTIVE EFFORT AND MOISTURE
TO ACHIEVE SPECIFIED COMPACTION DURING TIMES WHEN OUR
OBSERVER IS NOT PRESENT, AND AT LOCATIONS OTHER THAN
THOSE TESTED. TEST DATA ARE NOT THE SOLE BASIS FOR
OPINIONS ON WHETHER THE FILL MEETS SPECIFICATIONS.
TYPE OF COMPACTION EQUIPMENT AND NO. OF UNITS:
MOISTURE ADDED BY
TYPE OF EARTH MOVING EQUIPMENT AND NO. OF UNITS;
THICKNESS OF LIFT
INCHES
PROGRESS REPORT
AS REQUESTED, A SITE VISIT WAS MADE TO PERFORM COMPACTION AND MOISTURE TESTING ON
SELECT FILL PLACED IN THE THE PAVILLlON AND COLUMBARIUM BUILDING. FILL WAS PLACED AND
COMPACTED PRIOR TO OUR SITE VISIT.
~ IN OUR OPINION, Fill COMPACTION MEETS SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO.(S)
19 - 25
o IN OUR OPINION, Fill COMPACTION DOES NOT MEET SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO.(S)
SF
CTLjT1fOMPSON TEXAS,
APPROVED BY RIC;6.
SCOPE OF
OBSERVATION:
O FUll
TIME;
~ PERIODIC ON CAll BASIS.' ~ CONTRACTOR'S OR CllENrs REPRESENTATIVE
~ . ,~ AOVISED
CHRIS THERIOT
FIELD REPRESENTATIVE
10575 Newkirk Street, Suite 780 I Dallas, TX 75220 I Phone: 972-831-1111