Loading...
Sandy Lk Oaks-CS081106 THE.CiTY.OF COPPELL November 6, 2008 Mike Mattice Rockford Construction Company 5540 Glenwood Hills Pkwy SE Grand Rapids, MI 49512 FX: 616-285-8003 RE: Sandy Lake Oaks Addition, (Family Video) Provisional Letter of Acceptance Dear Mr. Mattice: Representatives of the City of Coppell are issuing a Provisional Letter of Acceptance for the referenced project with the following conditions: 1. There are several cracks around the entire parking lot that need to be sealed. 2. You must comply with the City of Coppell Stamped Concrete Ordinance. 3. The pipe inside the northwest drain box needs to be grouted. 4. A two-year maintenance bond for paving with supporting documents is required. A final acceptance letter will be issued when all conditions have been met. A follow-up inspection of the facilities will be conducted prior to the lapse of the two-year bond period. If any punchlist items are noted at that time, you will be contacted to make repairs. Thanks for your cooperation. Sincerely, ~[) Larry Davis Construction Inspector Office Phone: (972) 304-3684 Fax: (972) 304-3570 cc: Ken Griffin, P.E., Director of Engineering & Public Works Glenn Hollowell, P.E., Asst. Director of Public Works Greg Jones, Chief Building Official Tim Oates, Deputy Chief/Prevention Alan Ricord, FX: 616-285-8001 Bob Moyer, FX 616-285-8001 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673