Loading...
Sandy Lk Oaks-CS081030 THE.CITY.OF COPPELL October 30, 2008 Alan Ricard Rockford Construction Company, Inc. 5540 Glenwood Hills Pkwy SE Grand Rapids, MI 49512 RE: Sandy Lake Oaks Addition (Family Video) Stamped Concrete Dear Mr. Ricard: This letter is being written in regards to the stamped concrete on the driveway entrance off of Moore Rd. The stamped concrete is not in compliance with the City of Coppell ordinance. The ordinance for the stamped concrete was included in the construction packet that was distributed at the Pre-Construction meeting on May 15, 2008 and was also verbally conveyed by the inspector that the color and pattern are included in the ordinance. We did not approve a variance to this ordinance; therefore this matter should be corrected prior to final acceptance of the project. We appreciate your assistance in this matter. If you should have any questions please contact me at 972/304-7019. <~~ Michael Garza, EIT Graduate Engineer Cc: Larry Davis, Construction Inspector, City of Coppell Bob Moyer, Superintendent, FX: 616-285-8001 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673