Loading...
Vista Ridge Retail 1A-CS081109 THE-CITY-OF COPPELL Ii MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To: Ken Griffin, P.E., Dir. of Engineering / Public Works Glenn Hollowell, Asst. Dir. of Public Works Lee Stone, Commercial Bldg. Inspector Tim Oates, Deputy Chief/Prevention From: Albert Samaniego, Construction Inspector Office Phone: (972) 304-3684 Fax: (972) 304-3570 Date: November 19, 2008 RE: WALK-THRU INSPECTION Vista Ridge Retail, Lot 1 Block A (Bank of America) A final walk-thru for utilities and drainage on the referenced project has been scheduled for: Thursdav. November 20. 2008 at 2:00 p.m. Please let me know if I can be of further assistance. cc: Michael Doggett, Fax: 972/490-7099 Claude Bolton, Fax: 214/279-0709 "CITY OF corrELL ENGINEERING - EXCELLENCE BY DESIGN"