Vista Ridge Retail 1A-CS081109
THE-CITY-OF
COPPELL
Ii
MEMORANDUM
FROM THE
DEPARTMENT OF ENGINEERING
To:
Ken Griffin, P.E., Dir. of Engineering / Public Works
Glenn Hollowell, Asst. Dir. of Public Works
Lee Stone, Commercial Bldg. Inspector
Tim Oates, Deputy Chief/Prevention
From:
Albert Samaniego, Construction Inspector
Office Phone: (972) 304-3684
Fax: (972) 304-3570
Date:
November 19, 2008
RE:
WALK-THRU INSPECTION
Vista Ridge Retail, Lot 1 Block A (Bank of America)
A final walk-thru for utilities and drainage on the referenced project has been scheduled
for:
Thursdav. November 20. 2008 at 2:00 p.m.
Please let me know if I can be of further assistance.
cc: Michael Doggett, Fax: 972/490-7099
Claude Bolton, Fax: 214/279-0709
"CITY OF corrELL ENGINEERING - EXCELLENCE BY DESIGN"