Loading...
Rolling Oaks MC-CN081107 (2) 4~~ ARCHITECTURE INTERIORS PLANNING Bob Killingsworth, AlA President John Gary, AlA Vice President J. Stuart Todd, AlA Founder 2919 Welborn Suire 101 Dallas, TX 75219 Tel 214522-4033 Fax 214 522-7988 J. STUART TODD, INC. November 07,2008 Mr. Rick O'Dell City of Coppell Engineering Department 255 E. Parkway Blvd. Coppell, Tx. 75019 Re: Rolling Oaks Memorial Center Change Order 001 j Dear Rick, Enclosed are three (3) copies of Change Order 001. Please have Mr. Witt review and execute all three (3) copies and forward to The Fain Group for finalization. We will notify the Fain Group that the Change Order is being processed and once they have received the documents they are to review and sign all three (3) copies returning one (1) fully executed agreement to both the City of Coppell and JST for our records. Please call if you have any questions. Sincerely, J. STUART TODD, INC. I \/~~.! ~:=-..: , t-- Ken Baxter Senior Project Manager cc: Alex FisherffFG file I AlA Document G70r" - 2001 Change Order PROJECT (Name and address): Rolling Oaks Memorial Center 400 South Freeport Parkway Coppell, Texas 75019 TO CONTRACTOR (Name and address): The Fain Group 825 West Vickery Ft. Worth, Tx. 76104 CHANGE ORDER NUMBER: 001 DATE: November07,2008 OWNER: 181 ARCHITECT: 181 CONTRACTOR: 181 FIELD: 0 OTHER: 0 ARCHITECT'S PROJECT NUMBER: 04751 CONTRACT DATE: April 08,2008 CONTRACT FOR: General Construction THE CONTRACT IS CHANGED AS FOLLOWS: (Include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives) I. Change Order Request 001: This includes cost increases due to the scope of work required for one (I) fire hydrant addition as requested by the City of Coppell Fire Marshal. $ 4,179.00 2. Charge Order Request 002: This includes cost decreases due to the scope of work eliminated due to downsized mainline pipe dia, from 6" to 4" and relocation from below arterial concrete roadways to back of curb. <17,340.00> 3. Change Order Request 003: This includes cost increases due to the scope of work required due to the necessary extension of the existing Atmos Energy natural gas mainline from the adjacent property to original point of service located within the Construction Documents. 12,971.00 Total Adjusted Amount <$ 190.00> $ 2,945,000.00 $ 0.00 $ 2,945,000.00 $ 190.00 $ 2,945,190.00 The original Contract Sum was The net change by previously authorized Change Orders The Contract Sum prior to this Change Order was The Contract Sum will be increased by this Change Order in the amount of The new Contract Sum including this Change Order will be The Contract Time will be unchanged by Zero ( 0 ) days. The date of Substantial Completion as of the date of this Change Order therefore is March 20, 2009 NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. J. Stuart Todd, Inc. ARCHITECT (Finn name) 2919 Welborn Dallas, Tx. 75219 tDDR~ 0~ .J~.- . ~nature) Ken Baxter; Senior Project Mana~er (Typed name) U /~I fOB DATE ' The Fain Group CONTRACTOR (Finn name) 825 West Vickory Ft. Worth, Texas 76104 ADDRESS City of Coppell OWNER (Finn name) BY (Signature) Larry Frazier; President (Typed name) Jim Will; City Mana~er (TY~ na"ib {f lh . ATE DATE AlA Document G701T11- 2001. Copyright e 1979,1987,2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING: This AlA" Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AlA" Document, or any 1 portion of It, may result In severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 12:08:41 on 11/07/2008 under Order No.l000324n8_3 which expires on 1/1512009, and Is notler resale. User Notes: (2195474010) 4 ~q ~ J. Stuart Todd inc. !I J ".. 2919 Welborn, Suite 1 0 1 Dallas, Texas 75219 Phone: (214) 522-4033 Fax: (214) 522-7988 E-Mail Address - kbaxter(lijjstarchitects.com To: The Fain Group Date: 8/15/08 I Job No: 04751 Attn: Alex Fisher Re: Rolling Oaks Memorial Center: COR 01 TRANSMI1TED VIA: 1st Class Mail_Federal Express_Delivery _Fax X CONSTRUCTION MEMO: Alex, We have reviewed the Change Order Request 01 regarding the additional fire hydrant as requested by the City ofCoppell in the amou~t of$4,179.00 and find it to be acceptable. We will issue this within the next Change Order Document for the Owner's final review and processing. Please call if you have any questions, Regards, Ken JST Cc: Rick O'Dell/COP JST file . . FAIN Building Relationships Constructing Futures P.O. Box 750 Fort Worth, 1)( 76101 817-927-4388 817-927-4389 Fax www.lhelaincompany.com August 14, 2008 Ken Baxter J. Stuart Todd, Inc. 2919 Welborn Suite 101 Dallas, TX 75219 RE: Rolling Oaks Memorial Center Fire hydrant addition Mr. Baxter: We have received the request for change for the addition of the fire hydrant. We offer the following quotation in response to your request. Cut in 8" x 6" tee wi sleeve 6" gate valve 6" C-900 pipe Fire hydrant Overhead & Profit @ 10% Bond 2.00% Total Change $550.00 $725.00 $300.00 $2,150.00 $372.50 $81.95 $4,179.45 Sif~ Alex Fisher TITLE: Fire hydrant add PCO Item: 1 Rolling Oaks Memorial Center Coppell, TX Labor Labor Additional FAIN labor Items: Crew Unit Hours Rate Cost Ea 0 $ $ Subtotal FAIN Labor: $ Burder @ 55%: $ Total FAIN Labor: $ IAdditional FAIN Material Items: Quantity Unit Unit Cost Material Cost $ $ Total Material: $ Additional FAIN Equipment: Quantity Unit Hours Equipment Unit Equipment Cost $ $ Subtotal Subtotal FAIN Equipment: $ Fuel, Oil & Grease: $ Total FAIN Equipment: $ Quantities Unit Unit Price Total. 1 ea $ 550.00 $ 550.00 1 ea $ 725.00 $ 725.00 10 If $ 30.00 $ 300.00 1 ea $ 2,150.00 $ 2,150.00 Total Subcontractor Items: $ 3, Summary of Costs $ 3,725.00 $ 372.50 $ 4,097.50 $ 81.95 .. 4.179.45 IAdditional Subcontractor Items: Cut in 8" x 6" Tee wi sleeve 6" gate valve 6" C-900 pipe Fire hydrant Total Subcontractor Items: 10% Overhead & Profit Bond - 2.00% TOTAL TGR Constructors, Inc. P. O. Box 155219 Fort Worth, Texas 76155-0219 CHANGE REQUEST FORM Project: Rolling Oaks Memorial Center Date: 8/8/2008 Owner: The City of Coppell Project # 2008-004 Additions 1 2 3 4 5 6 7 8 9 10 Deletions 1 2 3 4 5 6 7 8 9 10 Change Request # One Description Unit Price Total Price Quantity UOM Cut in 8" x 6" Tee W/Sleeve 1 ea $ 550.00 $ 550.00 6" Gate Valve 1 ea $ 725.00 $ 725.00 6" C-900 Pipe 10 If $ 30.00 $ 300.00 Fire Hydrant 1 ea $ 2,150.00 $ 2,150.00 $ - $ - $ - $ - $ - $ - Total Additions $ 3,725.00 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Total Deletions $ Net Change $ 3,725.00 Description of Changes The city is requesting an additional fire hydrant be added to the project. Submitted By: 44~ J. Stuart Todd inc. 2919 Welborn, Suite 101 Dallas, Texas 75219 Phone: (214) 522-4033 Fax: (214) 522-7988 E-Mail Address - kbaxter(ii1jsta.rchitects.com To: The Fain Group Date: 9/02/08 I Job No: 04751 Attn: Alex Fisher Re: Rolling Oaks Memorial Center: COR 02 TRANSMI1TED VL4: 1st Class Mail_Federal Express_Delivery_Fax X CONSTRUCTION MEMO: Alex, We have reviewed the Change Order Request 02 regarding the relocation and downsizing of the irrigation mainline as requested by the City of Coppell in the amount .of a $17,340.00 credit and find it to be acceptable. We will issue this within the next Change Order Document for the Owner's fmal review and processing. Please call if you have any questions, Regards, Ken JST Cc: Rick O'DelVCOP JST file . . FAIN Building Rela~ Conslructing Fulures September 9,2008 P.O. Box 750 Fort Worth, TX 76101 817-927-4388 817-927-4389 Fax www.lhefaincompany.com Ken Baxter J. Stuart Todd, Inc. 2919 Welborn Suite 101 Dallas, TX 75219 RE: Rolling Oaks Memorial Center Irrigation Mainline Change COR 002 Mr. Baxter: Per your request, I am sending you the total linear footage of the irrigation credit and the breakdown of credit for "Area A". Total main line irrigation linear footage: Total main line irrigation credit: Credit from total applied to "Area A": 3400 If $17,340.00 $3,814.80 Let me know if you need anything else. Alex Fisher . . FAIN Building Relationships Constructing Futures August 29, 2008 P.O. Box 750 Fort Worth. TX 76101 817-927-4388 817-927-4389 Fax www.lhelaincompany.com Ken Baxter J. Stuart Todd, Inc. 2919 Welborn Suite 101 Dallas, TX 75219 RE: Rolling Oaks Memorial Center Irrigation Mainline Change COR 002 Mr. Baxter: We have received the request for change for reducing the size of the irrigation mainline from 6" to 4" and it's placement at back of curb. We offer the following credit in response to your request. 6" to 4" pipe reduction & trenching credit $17,340.00 Alex Fisher . ~ ~ AMERICAN LANDSCAPE SYSTEMS Professional Land.'icape IIrriga/io1/ Contractor 1780 Midway Road · Lewisville, Texas 75056 NAME I ADDRESS The Fain Group P.O. Box 750 Fort Worth, TX 76101 TERMS Proposal 8/2812008 DATE PROPOSAL # 12383 PROJECT QTY As per contract Mainline Change and Relocation DESCRIPTION 3,400 3,400 Rolling Oaks Cemetery-Coppell Reduction of 6" Main to 4" and relocate to back of curb Price for material change LF Price to relocate and use shallower depth without embedment LF This price is a credit against our original contract. All mains will be placed immediately back of curb and sleeves will extend to the back of curb for all paving crossings. Phone # I (469) 521-2200 I I Fax # I (469) 521-2206 I Respectfully submitted UNIT UNIT PRICE 3.50 1.60 TOTAL TOTAL 11,900.00 5,440.00 $17,340.00 4 ~~ ~ J. Stuart Todd inc. ~ J ".. 2919 Welborn, Suite 1 0 I Dallas, Texas 75219 Phone: (214) 522-4033 Fax: (214) 522-7988 E-Mail Address - kbaxter(iijjstarchitects.com To: The Fain Group Date: 10/28/08 I Job No: 04751 Attn: Alex Fisher Re: Rolling Oaks Memorial Center: COR 03 TRANSMITTED VIA: 1st Class Mail_Federal Express_Delivery _Fax X CONSTRUCTION MEMO: Alex, We have reviewed the Change Order Request 03 regarding the natural gas mainline extension required for cemetery service in the amount of $12,971.00 and find it to be acceptable. We understand that in order to initiate all design work, installation and approval processes associated with the gas mainline extension as provided by Atmos Energy Corp. and the installing utility subcontractor Fain will execute the "Work Assignment Supplement" (see attached documents) and will coordinate the associated paperwork and necessary pay requests until final acceptance has been processed by Atmos Energy Corp.. This is to be undertaken with an understanding that the City ofCoppell is the ultimate party responsible to provide and finalize the required "easement" and "right of way" platting documentation along with the "Form of Bill of Sale and Assignment" and "Form of Easement" Agreements and any other executed agreements or documentation as may be required by Atmos Energy Corp.. in order for the work to be completed, approved and finalized. We will issue this within the next Change Order Document for the Owner's final review and processing. Please call if you have any questions, Regards, Ken JST Cc: Mike Garza/COP Rick O'Dell/COP JST file TITLE: Gas Main Service to Rolling Oaks Site PCO Item: 3 Roiling Oaks Memorial Center Coppell, TX Additional FAIN labor Items: Crew IAddltlonal FAIN Material Items: Quantity Total FAIN Items: 10% Overhead UNIT PRICE $ $ $ $ $ $ 12,700.00 $ 120.00 $ 12,820.00 $ 151.28 . 12,971.28 Subtotal 5% Profit Subtotal Subcontractor Unit Price: 10% Overhead on Sub Items Subtotal Bond -1.18% QUOTE - Gas Infrastructure DATE: 09/22/08 515 N. KEALY LEWISVILLE. TX 75057 TO: Alex Fisher The Fain Group Location: Rolling Oaks Memorial Center Coppell,TX (972) 436-4566 PHONE (972) 219-0019 FAX UNIT TOTAL ITEM/DESCRIPTION QTY UNIT PRICE ESTIMATE Install Atmos Infrastructure in project: 1 lots $ 11,500.00 $ 11,500.00 includes alllabor,materlal,sandbackfill and equipment to required to install per Atmos design dated: 09-05- 08 - (950) 1.f.2" poly by open cut along Ruby Rd. - (40) /.f. 2" by directional bore along Ruby Rd beside the existing fence -Install 1 - 1 1/4" SL Riser w/ stop & plug -testing, bends, tees, test stations,caps,collars,signs,tracer wire,and marker tape ITOTAL I $ 11,500.00 I NOTES: We will require 4 working days to complete the gas infrastructure. We will bill for the entire amount of the above quote upon completion of work, since Atmos accepts responsibility for the new infrastructure it is assumed that no retainage will be held from this billing . It is assumed that staking and density testing, if required, will be paid by others and any spoils will be placed on site. (Quote Good for 30 days) Signature ~ ?lilt Joe Hili 9/22/2008 Date I,. ..., ," ."M . ~ idl:;1 i Cl: #1 cr ! ~iCl: '~' cr I ,;;i4:I;;i I ....' I- I i l= 10" r= ' I-.-' g: ~ ~ ~~ ~ ~ ~ ~ (; >< '" - >( - I 1 J JIll j JIH , J ,Jllllp! lilli, ' .Jj11l11!,illlllll,l!l/11 I I I. 1!.IAJl.' OOtAI : ., 'II , r I :1,." N, :!! ci 9; '- ,C :~ ~ ~ -? ,. ~ . >f d:. ., " ~ " llJ ;,1 ''\ , 1~ i ~ lj. ~- \/ 'VI 't' \~ . '<~fl ~ j i f i~ '" [ il=i! IQ - i i~F! , . I I ! j, ."l~ jN j i~ . !"'Is<~ i;n~ n II: [:I:;! r :Tii - ~ :! ~ "':" ~'lEl , 5!5! , , , . ' : : , , [ ; //:/~ ..~\~~ UJ ~ -' UJ cr i:L c- t." i !. ~ t 3N'9'13!:11.:J ~ J i ~ i ....H j ;,: !i 0 i\ .;; Z ',0 \0.- II z :i 0 :; i j \= at; ..'_'$VC'1AF' Z ; '; W , '\0- W \ o ,,'. \ 0:",'<('\ \. W: . \ (j)' .,' o 0.- ..- 0 >< ex:. 0::. 0.- 'M, , , " i' i i 'i I:;!' , ',' !', i, ii' ".t 'I i i !. I , i; ,Ill' ~ I i I B ,ill I I a ili t ~ 'i i I t 'II i & ,~I, I Ill!! i i .' J i:,' Il'l' ~ v, i!' i g' "'II 8, l ' 3 i !! 11'!111~'1, BlI!.! , J ! Ill'I!11 ! nlll~l I , 'I I ,I 1 I" Jf · H i !~Jl!/ijllt ; I i ~ o U ~ U ::> a::: I- 3n; , . " , u; It) i " , .~ , . ::. ". \ \