FS9904-CS 990902
'- ~
~=~
Kimley-Horn
and Associates, Inc.
September 2, 1999
Mr. Kenneth M. Griffin, P.E.
Director of Engineering and Public Works
City of Cop pel I
255 Parkway Blvd
Coppell, Texas 75019
Re: Response to review of the Schreiber Tract CLOMR for Denton
Creek, City of Coppell, Texas
Dear Mr. Griffin:
The following are responses to comments received by Halff Associates regarding
the Schreiber Tract CLOMR along Denton Creek. These comments are attached
for your reference.
In addition to addressing these comments, the original submittal dated March
1999 has been revised to incorporate changes made to the effective models used
as the basis for this study.
The change to the effective models were made as part of a Letter of Map
Revision request prepared by Dunaway Associates for the Mansions on the Lake
multi-family development located opposite the Schreiber Tract on Denton Creek.
The LOMR for this project was approved on July 8, 1999. The submittal by
Kimley-Horn in March of 1999 was based on models approved as part of the
CLOMR for Mansions on the Lake. After a discussion with Michael Baker
Corporation and Dunaway Associates, we were informed that these models were
revised based on as-built conditions at Mansions on the Lake. Michael Baker
Corporation also revised the effective models immediately upstream of our
project (at the S.H. 121 bridge) in order to "tie" into other models. The changes
to these models were incorporated into our study and had a minimal effect on the
previous results. The revised CLOMR reflects usage of the new effective
models.
.
TEL 972 770 1300
FAX 972 239 3820
H :\HYD ROlprojectsl06309 3061CO RRESPlresp2 .doc
.
Suite 1800
12700 Park Central Drive
Dallas, Texas
75251 .
'.
~=~
r-
r-
Kimley-Horn
and Associates, Inc.
In addition to the revision ofthe effective models, some of the cross-sections
were revised north of Denton Creek to better reflect the aerial topography.
The following are responses to review comments received from Halff
Associates:
I. City of Coppell Flood Plain Management Ordinance
A. The effective models used in our study are from a recently approved
LOMR for the Mansions on the Lake multi-family development directly
opposite the Shreiber Tract on Denton Creek. These models do not
include the bridge at SH 121. I spoke with Laura Bittner at Michael
Baker Corporation about these models. She said the bridge at SH 121
has not been included because it does not impact the I OO-year floodplain.
It is labeled on the stream profiles in the Flood Insurance Study as a high
bridge.
During the review phase of the LOMR for Mansions on the Lake,
Michael Baker Corporation made revisions to the model at SH 121 and
upstream of SH 121. These revisions included adding ET cards
beginning at Section 39290 to model ineffective flow at SH 121 and
modifying upstream sections to better tie into another model. Since
these revisions were made recently (June 1999), no changes were made
to the effective models outside of the Schreiber tract limits.
B. The channel at SH 121 is lined with gabion baskets and gab ion
mattresses.
C. The loss in "storage" shown at the upstream end of the computer
model is a result of lower water surface elevations (less volume of
water), not an actual loss in storage due to fill.
D. Wetland issues will be addressed during site development.
E. The ponds for Mansions on the Lake are constructed and have been
labeled as existing ponds. Also, the extent of the excavation is now
shown on the basemap.
F. All issues related to the Flood Plain Development Permit Application
will be addressed during site development.
H :\HYDRO\projects\06309 306\CORRESP\resp2 .doc
'-
~=~
Kimley-Horn
and Associates, Inc.
II. FEMA
A. Form 6, Channelization, has been included in the report.
B. The flood profile exhibit has been revised to include the 10, 50, 100,
and 500-year profiles, as well as cross section labeling and community
name. The 500-year floodplain limits will be added if requested by
FEMA.
C. The channel at SH 121 is armored with gab ion baskets and
mattresses.
D. The channel Manning's n-value was revised to reflect the Manning's
n-values used in the effective models.
E. Sections 394+40 and 394+90 have been added to the basemap.
Section 394+40 will not be affected by the proposed cut or fill.
If you have any question regarding any of the above, please do not hesitate to
call.
Sincerely,
KIMLEY-HORN AND ASSOCIATES, INC.
f1i;i/~.j, ILU-..
if)tiJuM 7( ~
William G. Pembroke, P.E.
Vice President
Michelle R. Evans, E.I.T.
Project Manager
MRE/fas
H :IHYD ROlprojectsl06309 3061CO RRES Plresp2 .doc