Loading...
Chateaus-LR081216 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrlch, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Client: CTM-Coppell, LLC c/o Lenart Development Co., LLC 520 Central ParkWay E Plana, TX 75074 Report No.: 336289 Project No.: 0814523 Date of Service: 10/17/2008 Report Date: 12/16/2008. Project: Chate s of Coppell Services: Obtain amples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samplescKto the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Set No. Tested (days) (In) (In2) (Ibs) (psi) 1 1 10/24/2008 ; 5.99 28.18 97,950 3,480 1 2 11/14/2008 5.99 28.18 108,470 ~ 1 3 11/14/2008 5.99 28.18 112,780 Average 3,930 1 4 12/12/2008 56 5.99 28.18 131,330 4,660 Contractor: Concrete Supplier: Redi-Mix Plant: 259 Specification Requirements Strength: 3,600 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 [8J~ ~Q;J 5I] [5J DO D Type 1 Type 2 Type 3' Type 4 Type 5 fill Mix Design I.D.: 536L 1524 Placement Date: 10/17/2008 Weather Conditions: Clear Time Sampled: 09:40am Temperature - Air: 720F Truck No: 1339 Air Content: 3.5% Overall Placement Location: Firelane paving, from north approach on Bethel Road connecting along Montbello Drive Batch time: 08:58am Concrete: 710F Ticket No: 59034644 Unit Weight (pet): NA Measured Slump (inches) 5.5 Sample Location: 15' south, 15' east from north approach on Bethel Road Fracture Type Type2 Type2 Type2 Type 2 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (ADW/CL) Page 1 of 3 Rone Engineering 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Sle 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Client: CTM-Coppel!, LLC c/o Lenart Development Co., LLC 520 Central Parkway E Plana, TX 75074 Report No.: 336459 Project No.: 0814523 Date of Service: 10/20/2008 Report Date: 12/16/2008 Project: Chateaus of Cappel! Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (In) (In') (Ibs) (psi) Type 1 1 10/27/2008 7 5.99 28.18 108,790 3,860 Type3 1 2 11/17/2008 28 6.00 28.27 134,400 ~ Type2 1 3 11/17/2008 28 6.00 28.27 127,470 ,510 Type2 Average ,630 1 4 12/15/2008 56 5.99 28.18 140,580 4,990 Type 2 r.21~ ~QJ 5l] E;] DO D Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 Contractor: Concrete Supplier: Redi-Mix Plant: 259 Specification Requirements Strength: 3,600 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design I.D.: 5364524 Placement Date: 10/20/2008 Weather Conditions: Clear, sunny Time Sampled: 10:05am Batch time: Temperature - Air: 750F Concrete: 660F Truck No: 1375 Ticket No: 59034719 Air Content: 5.1 % Unit Weight (pet): NA Overall Placement Location: Paving, south side of Montebello Drive, Station 1 +50 to 2+50 and the north side entrance, (cont below) Measured Slump (inches) 4.75 Sample Location: Station 2+30, south side of Montebello Drive LIMITATIONS: The test results presented herein were prepared based upon the speCific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/CL) Page 1 of 3