Loading...
WA9601B-LR 990721StanTech Engineering Co. 9200 King Arthur Drive Dallas, Texas 75247-3610 Phone 214/631-4372 Fax 214/631-4380 Mr. Kenneth Griffin, P.E. Project No.: 1520COP01 City of Coppell Project: Sandy Lake Road 255 Parkway Boulevard Location: Utility Trench Fill Post Office Box 478 Report No.: 22/0412 Coppell, Texas 75019-4409 RESULTS OF FIELD DENSITY TESTS TEST DATE RETEST TEST LOCATION LIFE/ PROCTOR FIELD FIELD PERCENT NO. OF DEPTH TEST DENSITY MOISTURE OF TEST NO. PCF % SPECIFED NIjM~ER COMPACTION 59 07/21/99 24" Water Line Backfill @ Sta. 25+50 4' 3 102.4 20.7 95.2 60 07/21/99 24" Water Line Backfill @ Sta. 26+30 NG 2 103.4 15.2 98.8 58A 07/21/99 58 24" Water Line Backfill @ Sta. 28+50 NG 2 100.7 15.2 96.2 TESTS PERFORMED BY: Walter Kirby TEST METHODS: ASTM D 2922, D 3017 D 1558, D2167 OR D 2937 REMARKS: *Indicates the moisture and/or density does not meet the required specifications. PROCTOR NO.: 1 - 110.4 pcf@ 15.6% Moisture 2 - 104.7 pcf@ 13.9% Moisture 3 - 107.6 pcf@ 17.3% Moisture 4-119.0 pcf@ 12.3% Moisture Average of#1 and #4 - 115.1 pcf@ 13.9% Moisture 5-114.9 pcf@ 13.6% Moisture SPECFICATION: 9.5% Compaction @ Optimum to +5% DISTRIBUTION: