Chateaus-CS090112
THE.CITY.OF
COPPELL
s
MEMORANDUM
FROM THE
DEPARTMENT OF ENGINEERING
To:
From:
Ken Griffin, P.E., Dir. of Engineering / Public Works
Glenn Hollowell, Asst. Dir. of Public Works
Lee Stone, Commercial Bldg. Inspector
Tim Oates, Deputy Chief/Prevention
Larry Davis, Construction Inspector
Office Phone: (972) 304-3684
Fax: (972) 304-3570
Date:
January 12, 2009
RE:
W ALK- THRU INSPECTION
Chateaus of Coppell (SW corner of Denton Tap and Bethel Rd.)
A final walk-thru for paving, utilities, drainage and erosion control on the referenced
project has been scheduled for:
Thursday, January 15,2009 at 9 a.m.
Please let me know if I can be of further assistance.
cc: Lance Proctor, Lenart Dev., E-mail: l_proctor@lenartdevelopment.com
Frank Killingsworth, KCK Const., Fax #: 214-547-9163
Clayton Harp, ForceCon Svcs., Fax #: 817-741-8126
"CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN"