Loading...
DR9301-CS 951231Balance AMOUNT ISSUED 1990 Brooks Lane Inlet Design Brooks Lane Inlet Construction Sandy Knoll/Shadowcrest/Woodhurst Design Meadows Stage I Design Meadows Stage II Design Kaye Street Contribution Sandy Knoll/Shadowcrest/Woodhurst Const. Meadows Stage I Construction Brooks Lane Stage I Design Brooks Lane Stage I Construction AMOUNT ISSUED 1993 Meadows Stage II Construction AMOUNT ISSUED 1995 Samuel/Meadowridge Flooding Design Samuel/Meadowridge Flooding Construction Miscellaneous $400,000 3,896 17,357 8,687 7,200 16,700 89,000 89,000 56,000 16,652 115,000 200,000 186,000 200,000 10,000 115,000 115,000 $396,104 378,747 370,060 362,860 346,160 257,160 168,160 112,160 95,508 (19,492) 14,000 19,000 115,000 0