Loading...
DR9202-PR 911030 (2) PROPOSAL FOR ENGINEERING SERVICES CITY OF COPPELL PHASE 1 DRAINAGE IMPROVEMENTS 1008.91.3915 BROOKS LANE - STAGE I PARTIAL INLETS ONLY A. Description of Project Preparation of construction plans and specifications for storm sewer inlets on Brooks Lane in the Hunterwood Subdivision. This is a portion of the Stage I improvements included in the City-Wide Storm Water Management Plan. Installation of the inlets on Brooks Lane would provide minimal additional protection for the residence at 415 Brooks Lane. However, it would allow the remaining improvements to be moved to a later phase. The property owner could also be advised of flood proofing methods such as the installation of a driveway curb to provide additional protection for the garage. B. Scope of Work Basic Services Phase 1 - Survey for Design Set Control Design Surveys Phase 2 - Design Services Prepare construction drawings Utility conflicts Inlet design Update cost estimates for final design Obtain plan approval from the city 1 staff meeting (maximum) 1 council meeting (maximum) - additional staff meetings or property owner coordination will be substituted ff a council meeting is not required. Prepare construction contracts and specifications Page 1 PROPOSAL (cont.) BROOKS LANE - STAGE I PARTIAL INLETS ONLY Services Not Included in this Contract Bidding and contract award Contract administration Survey for construction Full time or half time resident construction inspector Consulting services by others except as noted in the Scope of Work Filing fees, permit fees and taxes Certification that work is built in accordance with plans and specifications Environmental impact assessments Survey for preparation of record drawings Printing of plans and specifications over and above those required for city review. C. Fee Proposal Phase 1 - Survey for Design Phase 2 - Design Services Construction Plans and Specifications $619.00 $3,277.00 Total Basic Fee Proposal $3,896.00 The Basic Fee for the services described above will be based on a lump sum fee of $3,896.00. The engineering services will be billed monthly or at the completion of each phase, whichever comes fa'st. The work will be invoiced on an hourly basis of 2.13 times salary costs. Salary cost as defined by the ASCE Manual and Report on Engineering Practice No. 45 is the cost of salaries (including sick leave, vacation, holiday and incentive pay) for time directly chargeable to the project, plus unemployment, excise and payroll taxes and contributions for social security, employment compensation insurance, retirement, medical and insurance benefits. Direct costs such as reproduction, sub-consultant services, long distance phone calls, deliveries, etc. will be billed at 1.10 times cost. Computer charges will be invoiced at 1.0 times cost. This proposal will serve as the engineering services contract upon execution in the spaces below: Albert H. Halff Associates, Inc. By:-- ~ ~ ~-~/~f-~' By:. Title: V/c_~. ~re~P Title: Date: Io/'~o./q/ Date: Accepted: City of Coppell Page 2 "' '" ' '--ETS , A'NSTALL 2/10 INL / ~. ./~,WITH 21,":RCP LATE. HAL::, ' ' -- ' 36 RCP /~,/'~ ~-.._ ~-'~"_. J~ .U,,I S-TA~L-~. 400 N 0 100 200 300 1 SCALE IN FEET FIGURE VII-3 SITE C BROOKS LANE/HUNTERWOOD DRAINAGE IMPROVEMENTS