Loading...
DR9301-CS 921208 .-U. Bt]tCI" H. HAl. IT :\55()(iIATE5. IX(5. December 8, 1992 ]iN(;INEt;RS · >IiIiiN'I'I~i'5 · 5['IiVtlYi)RS D.-'~I.!..-\> *. \ R[.I.X't' i( )N' * ( Iii( '..\( ;( ~ · ! ()ii I v~'( )Il 1'I! City of Coppell P.O. Box 478 Coppell, TX 75019 Attn: Mr. Ken Griffin, P.E., City Engineer Re: Sandy Knoll/Shadowcrest Drainage Improvements Dear Ken: Attached please find a copy of the letter fi'om Gibson & Associates requesting approval to substitute 2 inches of additional concrete in place of 6 inches of lime stabilization for the street paving on the above referenced drainage improvement project. Halff Associates has allowed this type of substitute previously. Hove'ever, a recommendation/analysis by a geotechnical consultant was required prior to approval. The drainage problems (flooding over the top of curb) within this subdivision were caused by subgrade movements which flattened and reversed slopes. Geotechnical testing was not included in the engineering services contract for this project, therefore we have no particular information about the soils in this area, nor an avenue to ask for a geotech's recommendation. If the City of Coppell wishes to pursue this alternative further, llalff Associates recommend> that the City require a submittal from a qualified geotechniczd engineer which states that this would be an equal design. In addition, Gibson & Associates requests altem:tte permission to substitute 6 inches of cement treated base in lieu of the lime stabilization. This alternative would provide the same thickness of stabilized material as the lime stabilization called for in the construction plans. Assuming that there would be no increase in cost of construction, this would be the preferable alternative. Please feel free to call if you have any questions or comments. Yours very truly, ALBERT lt. HALFF ASSOCIATES, INC. Jean Hansen, P.E. /sn c: Garrth Campbell, City of Coppell 11210 Ryll~relt P, O. 9ox 600679 Belch Springs, Texas 75180.0579 214/5S7,1199 FAX 5~7.1552 '. · A$90 tATI:$, INC. November 20, 1992 Mr. Garreth Campbell. City of Coppell P.O. Box 478 Coppell, Texas 75019 Re: Sandy Knoll/Shadowcrest Drainage Improvements Dear Sir: We propose to substitute two (2) additional inches of concrete paving in lieu of the 6" lime stabilization that was specified. We believe this would be an equal design and would save the City time and money. The savings would be as follows: l) Two extra inches of concrete 1,194 SY @ $5.00/sy $5,970.00 2) Delete lime stab on Shadowcrest 334 SY @ $15.00/~y (5,010.00) 3) Delete lime on Shadowcrest 4.5 Tons @ $100.00/ton ( 450.00) 4) Delete lime stab. on Woodhurst 860 SY @ $10 00/sy (8,600.00) s) Delete lime on Woodhurst 11.6 Tons @ $100.00/ton (1,160.00~ Net Savings:S(9,250.00) Also by eliminating thc lime stabilization, this would save two to thr~e weeks on time, pre~enting less construction inconvenience for the citizens. However, if the City chooses not to select this proposal, we request permission to substitute 6" cement treated base for the lime stabilization. Though this would not represent a cost savings, it will save several days on time.