ST0301-ES051208
THE.CITY.OF
December 8, 2005
Mr. Robert Foster
147 Oak Trail
Coppell, Texas 75019-2514
RE: Bethel Road II
ST 03-0]
Parcel 60 - Permanent Drainage Easement
Dear Mr. Foster:
The City of Coppell is currently working with the engineering firm of Freese & Nichols to design
the Bethel Road II project. The project will consist of the reconstruction of Bethel Road from
Freeport Parkway to Denton Tap Road, and Coppell Road from Bethel Road to Cooper Lane.
The existing two-lane asphalt roadways will be reconstructed as two-lane concrete roadways with
improved drainage and sidewalks. The work will also include the installation of traffic signals,
and landscaping and enhanced pavement in the Old Coppell area.
The project is in the final design phase, and the city is in the process of acquiring right-of-way
and easements from 24 parcels within the project limits. It will be necessary to acquire a
permanent drainage easement on your property located at 600 Mitchell Street. The property has
been designated as Parcel 60 on the 'Coppell Road Proposed Right-of-Way Map'. The drainage
easement is needed for the construction of the storm drain improvements.
With this letter I am providing a copy of the legal description and plat for Parcel 60. Please
review the enclosed documents and let me know if you have any questions or if you wish to view
the construction plans. It is anticipated that construction will begin in the 2nd quarter of 2007.
Your consideration of this matter is appreciated.
Sincerely,
{. -. --------
~l.u,X(jJf\ \ CU.\ ~O V-
Suzan f,ylor
CIP Coordinator
Engineering Department
Direct: 972-304-7019
Fax: 972-304-3570
E-mail: stavlor@ci.coppell.tx.us
GOP PEL!
-*-
M
-..-.
1Ps 5 _ 200!>
Enclosures
255 PARKWAY * P.O.BOX 947B * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673