Loading...
Wagon Wheel-CS081125 G E Consulting Services, Inc. Geotechnical, Materials and Environmental Engineering 2530 Electronic Lane Suite 710 Dallas, Texas 75220 214.351.5633 FAX 214.351.5680 www.gmeconsult.com November 25, 2008 City of Coppell Attn: Mr. Rock O'Dell 255 Parkway Boulevard P. O. Box 9478 Coppell, TX 75019-9478 Subject: Summary of Free Swell Testing WAGON WHEEL PARK STORAGE BUILDING Coppell, Texas GME Project No. 08.05.0269.0005A Dear Mr. O'Dell: GME Consulting Services, Inc. (GME) appreciates the opportunity to submit this letter summarizing the results of free swell testing performed on electrochemically-injected soil samples obtained at the above referenced project site. First Phase of In iection- Entire Pad The first phase of electrochemical injection of the building pad began on November 5, 2008 and was completed on November 12,2008. After a post-injection waiting period of over 72 hours within each section, test borings were performed to confirm that the swell potential of the materials had been reduced to the specified levels. An all terrain vehicle (A TV) drill rig was used to drill the test borings and obtain soil samples at each boring location. The test borings were drilled and sampled continuously to depths of 7 feet within the building pad area. The samples were placed in plastic bags, sealed and returned to the GME laboratory for free swell testing. The following tables summarizes the locations of the two test borings and the results of the free swell tests performed on the soil samples obtained at the project site on November 17, 2008. Free Swell Testing- Wagon Wheel Park Storage Building, Coppell, Texas GME Project No. 08.05.0269-0005A Page 2 Summary of Test Borin2 Locations - First Injection Phase Test Boring Boring No. Depth, ft Borin~ Location CB-l 7 Inside SW Building Comer CB-2 7 Inside NE Building Comer Summar' of Free Swell Test Results Overburden Free Borin2 No. Sample No. Depth, ft Pressure, psf Swell, % CB-l 1 0-2 125 0.27 CB-l 2 2-4 375 0.27 CB-l 3 4-6 625 0.00 CB-l 4 6-7 875 0.00 CB-2 1 0-2 125 1.47 CB-2 2 2-4 375 0.80 CB-2 3 4-6 625 0.00 CB-2 4 6-7 875 0.00 Free Swell Average 0.35 The acceptance criteria for the electrochemically-injected soils were provided within Appendix D of GME Report No. 08.04.0066 dated April 23, 2008. The criteria requires that the average of laboratory free swell tests is 1.0 percent or less within the 7-foot deep injected areas of the building pad and that no individual swell test exceeds 2.0 percent. For the 2 test borings in the building pad area summarized above, the average free swell measured was 0.20 percent with the no tests found to be above 2.0 percent. The daily logs provided by the injection sub-contractor (ESSL) indicated that 96,000 gallons of water containing 327 gallons of electrochemical (a dilution ratio of 293: 1 water to chemical) was injected into the building pad. This ratio meets the required dilution ratio of 300: 1 water to chemical. Summary Based on the results of the injection testing, it was GME's opinion that the building pad areas have been satisfactorily injected with electrochemical solution. GME provided verbal notice of these results to the contractor on November 19, 2008. We further indicated to the contractor that placement of the special fill layer in the building pad could proceed. Free Swell Testing- Wagon Wheel Park Storage Building, Coppell, Texas Page 3 GME Project No. 08.05.0269-0005A We appreciate the opportunity to provide these services to the City of Coppell. Should you have any questions about information in this letter, please do not hesitate to call the undersigned at (214) 351-5633. Sincerely, ~""" --:.\~ OF roE: '\, GME Consultin seM*.;m.. ......1:f~t, ~ ' .~ \*'A ,*" ~......'.D..... ......e........ ~ . ~ . ZIOLKOWSKI ~. Dougl P 1OIkoW..&P.~.............~...., Senior Vice Presid~1k\ ~ 57574 ~~ ""'1 4", ~~."!(;'Sl'f,":...~~.:' DPZ/dpz .~\\~JO'iA\.:~-; ........,~~...... /"cJJ Ik~ntr Mark W. Kawalek, P.E. President Time Spent: 6 hours over project duration Distribution: (1) Client (1) City ofCoppell- Attn: Mr. John Elias (1) Jamail & Smith - Attn: Mr. Randy Jones Shared\projects\cmt\ City of Coppel1\ Wagon Wheel Park\Reports\Letters\0269-0005A.112508.doc