November 25, 2008
City of Coppell
Attn: Mr. Rock O'Dell
255 Parkway Boulevard
P. O. Box 9478
Coppell, TX 75019-9478
Subject:
Summary of Free Swell Testing
WAGON WHEEL PARK STORAGE BUILDING
Coppell, Texas
GME Project No. 08.05.0269.0005A
Dear Mr. O'Dell:
GME Consulting Services, Inc. (GME) appreciates the opportunity to submit this letter
summarizing the results of free swell testing performed on electrochemically-injected soil
samples obtained at the above referenced project site.
First Phase of In iection- Entire Pad
The first phase of electrochemical injection of the building pad began on November 5,
2008 and was completed on November 12,2008. After a post-injection waiting period of
over 72 hours within each section, test borings were performed to confirm that the swell
potential of the materials had been reduced to the specified levels.
An all terrain vehicle (A TV) drill rig was used to drill the test borings and obtain soil
samples at each boring location. The test borings were drilled and sampled continuously
to depths of 7 feet within the building pad area. The samples were placed in plastic bags,
sealed and returned to the GME laboratory for free swell testing.
The following tables summarizes the locations of the two test borings and the results of
the free swell tests performed on the soil samples obtained at the project site on
November 17, 2008.
Free Swell Testing- Wagon Wheel Park Storage Building, Coppell, Texas
GME Project No. 08.05.0269-0005A
Page 2
Summary of Test Borin2 Locations - First Injection Phase
Test Boring Boring
No. Depth, ft Borin~ Location
CB-l 7 Inside SW Building Comer
CB-2 7 Inside NE Building Comer
Summar' of Free Swell Test Results
Overburden Free
Borin2 No. Sample No. Depth, ft Pressure, psf Swell, %
CB-l 1 0-2 125 0.27
CB-l 2 2-4 375 0.27
CB-l 3 4-6 625 0.00
CB-l 4 6-7 875 0.00
CB-2 1 0-2 125 1.47
CB-2 2 2-4 375 0.80
CB-2 3 4-6 625 0.00
CB-2 4 6-7 875 0.00
Free Swell Average 0.35
The acceptance criteria for the electrochemically-injected soils were provided within
Appendix D of GME Report No. 08.04.0066 dated April 23, 2008. The criteria requires
that the average of laboratory free swell tests is 1.0 percent or less within the 7-foot deep
injected areas of the building pad and that no individual swell test exceeds 2.0 percent. For
the 2 test borings in the building pad area summarized above, the average free swell
measured was 0.20 percent with the no tests found to be above 2.0 percent.
The daily logs provided by the injection sub-contractor (ESSL) indicated that 96,000
gallons of water containing 327 gallons of electrochemical (a dilution ratio of 293: 1
water to chemical) was injected into the building pad. This ratio meets the required
dilution ratio of 300: 1 water to chemical.
Summary
Based on the results of the injection testing, it was GME's opinion that the building pad
areas have been satisfactorily injected with electrochemical solution. GME provided
verbal notice of these results to the contractor on November 19, 2008. We further
indicated to the contractor that placement of the special fill layer in the building pad
could proceed.
Free Swell Testing- Wagon Wheel Park Storage Building, Coppell, Texas Page 3
GME Project No. 08.05.0269-0005A
We appreciate the opportunity to provide these services to the City of Coppell. Should
you have any questions about information in this letter, please do not hesitate to call the
undersigned at (214) 351-5633.
Sincerely,
~"""
--:.\~ OF roE: '\,
GME Consultin seM*.;m.. ......1:f~t,
~ ' .~ \*'A
,*"
~......'.D..... ......e........ ~
. ~ . ZIOLKOWSKI ~.
Dougl P 1OIkoW..&P.~.............~....,
Senior Vice Presid~1k\ ~ 57574 ~~ ""'1
4", ~~."!(;'Sl'f,":...~~.:'
DPZ/dpz .~\\~JO'iA\.:~-;
........,~~......
/"cJJ Ik~ntr
Mark W. Kawalek, P.E.
President
Time Spent: 6 hours over project duration
Distribution: (1) Client
(1) City ofCoppell- Attn: Mr. John Elias
(1) Jamail & Smith - Attn: Mr. Randy Jones