DR9301-CS 921125 (3)MEMO TO: FROM: SUBJECT: DATE: Rey Gonzales,,~t S _u. perintendent Garreth Ctmapb3ll, Construction Inspector Sandy Knoll/Shadowcrest Drainage Improvements November 25, 1992 Please see the attached correspondence regarding the proposal to substitute two (2) additional inches of concrete paving in lieu of the 6" lime stabilization on Sandy Knoll/Shadowcrest drainage improvements by Gibson & Associates, Inc. Please submit your comments by December 4, 1992. Your assistance in this project is greatly appreciated. GC/bd CC: Jean Hansen, Albert H. Halff Associates Kenneth M. Griffin, P.E., City Engineer sandmem 75180.067~ :;14/567-1199 FAX 557.1552 · A$I4)Ct, ATI:I. INC. November 20, 1992 Mr. Garreth Campbell City of coppell P.O. Box 478 Coppell, Texas 75019 Sandy Knoll/Shadowcrest Drainage Improvements Dear Sir: We propose to substitute two (2) additions3 inches of concrete paving in lieu of the 6" lime stabilization that was specified. We believe this would be an equal design and would save the City time and money. The savings would be as follows: 1) Two extra inches of concrete 1,194 SY ~ $5.00/sy $5,970.00 2) Delete lime stab on Shadowcrest 334 SY @ $15.00/sy (5,010.00) 3) Delete lime on Shadowcrest 4.5 Tons @ Sl00.00/ton ( 450.00) 4) Delete lime stab. on Woodhurst 860 S¥ ~ $10 00/sy (8,600.00) 5) Delete lime on Woodhurst 11.6 Tons @ $100.00/ton Net Savings: (1,160.00~ $(9,250.00) Also by eliminating the lime stabilization, this would gave two to thr~e weeks on time, presenting less oonstruction inconvenience for the citizens. ~owever, if the City ohooses not to select thig proposal, we reque~% permission to substitute 6" cement treated base for the 6" lime stabilization. Though this would not represent a cost savings, it will save several days on time. Mr. Garreth Campbell Nov. 20, 1992 Page -2- If there are any questions regarding this matter, please call me. Very truly yours, GIBSON & ASSOCIATES, INC Vice President AJJ/md