Loading...
CF-Fire Station 1-LR081103 ---1 .1... "- -1 r--- --I Is I CONSULTING SERVICES, INC. 2530 Electronic Lane, Suite 710 Dallas, Texas 75220 Phone (214) 351-5633 Fax (214) 351-5680 Daily Report Project Name: Fire Station Storage Building Client Name: City of Coppell Type Service: Chemical Injection Observation Did Work Observed Meet Job Requirements: GME Job No: 08.05.0268-0012 11103/0R S~mny/coQI Date: Yes Weather: Deviations Reported To: A GME technician traveled to the job site for chemical injection observations. The area observed was the north half of the building pad. Technician observed the rig advance 2 to 4 feet. Rig would then lower injectors approximately 2 feet and hold 60 to 90 seconds. This process was repeated until injectors were fully extended into subgrade. Rig retracted injectors slowly, and then advanced and repeated the injection process. Briefing: Distribution: Travel Time: 1.00 City of Coppell Jamail & Smith Construction Time on Job: 2.00 Reporting: Total Time: 3.00 Reviewed by: nmc ~7/~ GME Representative: Timothy Gimeno Page -L of -L