Daily Report
Project Name: Fire Station Storage Building
Client Name: City of Coppell
Type Service: Chemical Injection Observation
Did Work Observed Meet Job Requirements:
GME Job No:
08.05.0268-0012
11103/0R
S~mny/coQI
Date:
Yes
Weather:
Deviations Reported To:
A GME technician traveled to the job site for chemical injection observations. The area observed was the
north half of the building pad. Technician observed the rig advance 2 to 4 feet. Rig would then lower injectors
approximately 2 feet and hold 60 to 90 seconds. This process was repeated until injectors were fully extended
into subgrade. Rig retracted injectors slowly, and then advanced and repeated the injection process.
Briefing:
Distribution:
Travel Time:
1.00
City of Coppell
Jamail & Smith Construction
Time on Job:
2.00
Reporting:
Total Time:
3.00
Reviewed by: nmc
~7/~
GME Representative: Timothy Gimeno