CF-Fire Station 1-LR081023 CONSULTING SERVICES, INC. 2530 Electronic Lane, Suite 710 Dallas, Texas 75220 Phone (214) 351-5633 Fax (214) 351-5680 Daily Report Project Name: Fire Station Storage Building Client Name: City of Coppell Type Service: Proofrolling Observations Did Work Observed Meet Job Requirements: Yes GME Job No: 08.05.0268-0002 Date: Weather: 10/?i/OR SUlmy/cool Deviations Reported To: A GME technician traveled to the job site for proofrolling of subgrade. Entire building pad for fire department storage building was proofrolled. Proofrolling was performed using a fully loaded dump truck. No rutting, pumping or deflection was observed during proofrolling of subgrade. The area observed during proofroll was from Line A-I to A-5 to E-5 to E-I to A-I. The building pad subgrade is now ready for fill placement. Briefing: Distribution: Travel Time: 1.00 City of Coppell Jamai1 & Smith Construction Time on Job: 1.25 Reporting: Total Time: 2.25 Reviewed by: rune ~ ~~ GME Representative: Timothy Gimeno Page -L of --L :.. 1 CONSUL TING SERVICES, INC. 2530 Electronic Lane, Suite 710 Dallas, Texas 75220 Phone (214) 351-5633 Fax (214) 351-5680 Daily Report Project Name: Fire Station Storage Building Client Name: City of Coppell Type Service: Field Density Tests Did Work Observed Meet Job Requirements: GME Job No: 08.05.0268-0003 1 0/21 lOR Date: Weather: Deviations Reported To: A GME field technician traveled to the project site to perform density tests on new building pad, but, subcontractor was not ready. GME technician went to parks project at Project Manager's [Randy Jones] request to observe the soil that is going to be used on fire department building pad. He was concerned that the soil may be contaminated with organics. GME technician found that the top 3" to 5" was contaminated in a low percentage and recommended to subcontractor to remove those 3" to 5" and push it to the side. Randy was infomled of this recommendation. Briefing: Distribution: Travel Time: 1.00 City of Coppell Jamail & Smith Construction Time on Job: 0.75 Reporting: Total Time: 1.75 Reviewed by: nrnc ~~ ~ -- . .~, GME Representative: Juan Martinez Page -L of -L