Loading...
WA9903-CS000616RONALD V. CONWAY, P.E. JOHN W. BIRKHOFF, P.E. JOE R. CARTER, P.E. GARY C. HENDRICKS, P.E. PAUL A. CARLINE, P.E. MATT HICKEY, P.E. ROSS L. JACOBS, P.E. I. C. FINKLEA, P.E. SHIMEK, JACOBS & FINKLEA, L.L.P. CONSULTING ENGINEERS 8333 Douglas Avenue, #820 Dallas, Texas 75225-5816 Fax (214) 361-0204 June 16, 2000 Phone (214) 361-7900 Architectural Utiliti nc., dba AUI General Contractors P. O. Box 11586 Fort W~d Re: City of Coppell Addition to Pump No. 4 at the Village Parkway Pump Station Gentlemen: We are enclosing two copies of the Affidavit of Final Payment and Release, along with a preliminary copy of Pay Request No. 5 and Final for the City of Coppell, Addition to Pump No. 4 at the Village Parkway Pump Station project. Please sign and return both copies of the Affidavit to this office. Upon receipt of the executed Affidavit and the satisfactory completion of the punch list items, we will forward the final pay request to the City of Coppell for their consideration. Enclosure cc: b4~ Glenn D. Hollowell, P.E. Larry Davis j:\clerical\coppell\1999-153\letters\constXk\affidavit. doc Owner: Project: IMONTHLY PAY CITY OF COPPELL, TEXAS Addition of Pump No. 4 at the Village Parkway Pump Station Project No. WA99-03; Bid No. Q-119902 From: 1-Jun-00 To: 12-Jun-00. Contractor: REQUEST Pay Request No. Contract Date: Page I of I Original Contract Amount: Revised Contract Amount: Architectural Utilities, Inc. P. O. Box 11586 Fort Worth, Texas 76112 Allotted: Quantity Complete Item in Revised This No. Description Unit Proposal Quantity Request I 9,000 gpm Horiz. Split Case Pump 600 Hp Motor Ea. I 0.1 1 a Pump Allowance Adjustment co #1 Ea. 0 1 0.1 2 Installing Pump #4, Piping, and Electrical Equip. L.S. I 7.39°/~ 3 24" Butterfly Valve in Discharge Piping (1, 2 & 3) Ea. 3 0 4 36" Windowed Spool Time Transit Meter L.S. I 0% 5 1/2" Pressure Tap co #2 L.S. 0 10°/~ 6 Field Adustments to Suction Piping (Pump #4) co #2 L.S. 0 1 0% ProjeCt StartDate: Completion Date: 151 Total Work Completed 1 1 100°4 3 100% 100% 100% 5and Find Dcecmbcr14,1999 $ 346,000.00 $ 357,676.00 3-Jan-2000 1-Jtm-2000 Used: Pump No. 4 162 Conuact Extandcd Price Amoum $75,000.00 $ 75,000.00 $10,684.00 $ 10,684.00 $220,000.00 $ 22~000.00 $8,000.00 $ 24,000.00 $27,000.00 $ 27,000.00 $227.00 $ 227.00 $765.00 $ 765.00 Prepared and Submitted by: ~ By: Gary C~c Date: ~ yp..proved for Owner ~ ' Date: I:~.eoppel~ 1999 i S 3Xi~y-rqstxt~y-nq I ads · I' Total Amount Less Amount Retained Total Amount Payable Less Previous Payments Amount Due This Request 0% $ 357,676.00 $ $ 357,676.00 $ 299;571.84 SHIMEK, JACOBS & FINKLEA, L.L.P. CONSULTING ENGINEERS Today's Date: June 16, 2000 Monthly Pay Request Status Client: CiTY OF COPPELL, TEXAS' Project No. 1999-153 Name of Project: Addition of Pump No. 4 at the Village Parkway Pump Staff Project No. WA99-03; Bid No. Q-119902 Contract Amount: $ 357,676.00 1 7-Mar-2000 $ 72,750.00 $ 65,475.00 20.34% 2 27-Mar-2000 $ 117,396.00 $ 40,181.40 32.82% 3 27-Apr-2000 $ 227,445.60 $ 99,044.64 63.59% 4 2-Jun-2000 $ 332,857.60 $ 94,870.80 93.06% 5 and Final 16-Jun-2000 $ 357,676,00 $ 58,104.16 · 100.00% J:~dlX1999153~y-rqst~'ay.~ql .xls i '!