Loading...
Rolling Oaks MC-LR081015•pip CC • T E X A S L L C CITY OF COPPELL Date: 10/15/2008 255 PARKWAY BOULEVARD P.O. BOX 478 Report ID: K52093 - DA08152.000 COPPELL TX 75019 Report of Concrete Compressive Strength Tests Project: ROLLING OAKS MEMORIAL CENTER PHASE I Supplier: REDI MIX FREEPORT PARKWAY Location: HEAD WALL AND SLOPE AT LINE A, STA. 0 +00 AND LINE B, STA. 0 +00 Cast Date: 911612008 Ticket: 13622126 Batch Time: 09:23 Concrete Mix: 340L1504 In -Lab Date: 911712008 Truck Number: 1015 Test Time: 10:15 Specimens Made By: DC Initial Curing Final Curing Curing Method: Min. Temp: Max Temp: Curing Method: Other o F o F Fog Room Physical Properties of Concrete (ASTM C143, C231, C138, C1064) Specified Strength (f'c) Slump Air Content Density Temperature 4000 psi @ 28 days 3.00 in. 2.1% 82 deg. F Compressive Strengths (ASTM C39) Specimen Age in Diameter Area Max. Load Compressive Percent Type of Number Days (inches) (sq. inches) (lbs.) Strength (psi) of f'c Fracture 1 7 4.00 12.57 55,700 4430 Shear 2 7 4.00 12.57 57,020 4540 Shear Average: 4480 112 3 28 4.00 12.57 72,760 5790 Wedge 4 28 4.00 12.57 75,680 6020 Columnar Average: 5900 148 �,�`�tit1t11,t ~~ E .r^. P .. ........ . . ... .,. ..; f 11 CTLIThompson Texag��`.•LC ••.,s 1 cc: REDI MIX r � *I I r J. STUART TODD ARCHITECTS " "'•••••••••••••••••. ....V THE FAIN COMPANY ..,.....� RICHA- D : HAMMER C. , P661p • • r •�� SENIOR PRINCIPAL f1 1 �= Itt2 11S 1 0NAL EN- ' P~ 10575 Newkirk Street, Suite 780 1 Dallas, TX 75220 1 Phone: 972 - 831 -1111 This test report relates only to the items tested and shall not be reproduced, except in full, without the written approval of CTLIThompson Texas, LLC Compaction Test Report CLIENT: S.E CEMETERIES OF TEXAS 523 S. MAIN STREET GRAPEVINE TX 76051 W gTE X A S L L C DATE: 1 (11/1.5/111111 PROJECT NUMBER. DAnH 5 i 5 i OOO Phase: 34 REPORT NUMBER: 4 SHEET: I OF 2 SUBJECT: RESTLAND FUNERAL HOME ROLLING OAKS MEMORIAL CENTER COPPELL, TX UNDER RI AR FII I TEST NO. LOCATION q DEPTH FEET TEST TYPE LABORATORY FIELD COM- PACTION % SOIL TYPE MAX DENSITY PCF OMC% DRY DENSITY PCF MC% 25 BUIL DING AREA, 30' SOUTH AND 30 ­ OF 2.0 NUC 107.0 18.0 103.0 21.7 96 CURVE NO 2 EAST NW CORNER JOB NO DA08255.000 26 BUILDING AREA, 50' SOUTH AND 70 2.0 NUC 107.0 18.0 102.6 21.0 96 CURVE NO 2 EAST OF THE NW CORNER JOB NO DA08255.000 27 BUILDING AREA, 30' SOUTH AND 40 1.0 NUC 107.0 18.0 103.1 21.5 96 CURVE NO 2 EAST OF THE NW CORNER JOB NO DA08255.000 28 BUILDING AREA, 40' SOUTH AND 75 1.0 NUC 107.0 18.0 102.3 21.0 96 CURVE NO 2 EAST OF THE NW CORNER JOB NODA08255.000 29 BUILDING AREA, 70' SOUTH AND 10 5.0 NUC 107.0 18.0 102.0 21.1 95 CURVENO 2 EAST OF THE NW CORNER JOB NO DA08255.000 30 BUILDING A REA, 100' S AN 70 5.0 NUC 1 107.0 18.0 102.5 20.8 96 CURVE NO 2 EAST OF THE NW CORNER JOB NODA08255.000 31 BUILDING AREA, 65' SOUTH AND 40 4.0 NUC 107.0 18.0 102.4 20.9 96 CURVE NO 2 EAST OF THE NW CORNER JOB NO DA08255.000 32 BU AREA, 90' SOUTH AN 65 4.0 NUC 107.0 18.0 103.1 21.4 96 CURVE NO 2 EAST OF THE NW CORNER JOB NoDA08255.000 33 BUILDING AREA, 60' SOUTH AND 40 3.0 NUC 107.0 18.0 102.6 20.8 96 CURVE NO 2 EAST OF THE NW CORNER JOB NO DA08255.000 SPECIFICATIONS: 94 % OF MAXIMUM ASTM D 698 MOISTURE WITHIN +3 TO + % OF OPTIMUM TYPE OF COMPACTION EQUIPMENT AND NO OF UNITS: MOISTURE ADDED BY WATER TRUCK TYPE OF EARTH MOVING EQUIPMENT AND NO OF UNITS: CAT 963 LOADER (1); CAT 330 EXCAVATOR (1) THIS REPORT PRESENTS OPINIONS FORMED AS A RESULT OF OUR OBSERVATION OF FILL PLACEMENT, AS WELL AS THE TESTS SHOWN ABOVE, WE HAVE RELIED UPON THE CONTRACTOR TO APPLY THE NECESSARY COMPACTIVE EFFORT AND MOISTURE TO ACHIEVE SPECIFIED COMPACTION DURING TIMES WHEN OUR OBSERVER IS NOT PRESENT, AND AT LOCATIONS OTHER THAN THOSE TESTED. TEST DATA ARE NOT THE SOLE BASIS FOR OPINIONS ON WHETHER THE FILL MEETS SPECIFICATIONS. THICKNESS OF LIFT 12 INCHES 25-33 a IN OUR OPINION, FILL COMPACTION MEETS SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO.(S) ❑ IN OUR OPINION, FILL COMPACTION DOES NOT MEET SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO (S) SCOPE OF FULL CONTRACTOR'S OR CLIENT'S REPRESENTATIVE w r OBSERVATION: ❑ TIME, ✓❑ PERIODIC, ON CALL BASIS, Z ADVISED _ CHRIS 'tr ; "" "•.' rte- � • * i CHRIS THERIOT .* XAS, L "' �• FIELD REPRESENTATIVE CTLITHOMPSON TE '" ••• APPROVED BY RIC AR D41AMMER ;'PE• "••••••: .... BF SENIOR PRINCIPAL t�� .... .Q 10575 Newkirk Street, Suite 780 1 Dallas, TX 75220 1 Phone: 972 -831 -1111 111 4 111 , FS .,Cry5Et1,.: Compaction Test Report CLIENT: S.E CEMETERIES OF TEXAS 523 S. MAIN STREET GRAPEVINE TX 76051 - CTL I THOMPSON DATE' 1O /15 /OE PROJECTNUMBER: DAOS255.O00 Phase: 345 REPORT NUMBER: 4 SHEET: 2 OF 2 SUBJECT: RESTLAND FUNERAL HOME ROLLING OAKS MEMORIAL CENTER COPPELL,TX llNnFR SI AR Fill 1 TEST i LABORATORY FIELD MAX DENSITY PCF OMC% DENSITY PCF MC% NO. LOCATION DEPTH FEET TEST TYPE PA TIO N % SOIL TYPE BUILDING AREA, 90' SO AND 80 CURVE NO 2 34 EAST OF THE NW CORNER 3.0 1 NUC 107.0 18.0 102.9 21.6 96 JOB NO DA-8255.o00 SPECIFICATIONS: 94 % OF MAXIMUM ASTM D 698 MOISTURE WITHIN +3 TO +6 % OF OPTIMUM TYPE OF COMPACTION EQUIPMENT AND NO. OF UNITS: THIS REPORT PRESENTS OPINIONS FORMED AS A RESULT OF OUR OBSERVATION OF FILL PLACEMENT, AS WELL AS THE TESTS SHOWN ABOVE, WE HAVE RELIED UPON THE CONTRACTOR TO APPLY THE NECESSARY COMPACTIVE EFFORT AND MOISTURE TO ACHIEVE SPECIFIED COMPACTION DURING TIMES WHEN OUR OBSERVER IS NOT PRESENT, AND AT LOCATIONS OTHER THAN THOSE TESTED. TEST DATA ARE NOT THE SOLE BASIS FOR OPINIONS ON WHETHER THE FILL MEETS SPECIFICATIONS, MOISTURE ADDED BY WATER TRUCK THICKNESS OF LIFT 12 INCHES TYPE OF EARTH MOVING EQUIPMENT AND NO. OF UNITS: CAT 963 LOADER (1); CAT 330 EXCAVATOR (1) PROGRESS REPORT AS REQUESTED, A SITE VISIT WAS MADE TO PERFORM COMPACTION AND MOISTURE TESTING FOR MOISTURE CONDITIONED FILL PLACEMENT. WE OBSERVED THE CONTRACTOR EXCAVATING, PLACING FILL, ADDING MOISTURE AND COMPACTING WITH THE LOADER. WE ADVISED THE CONTRACOTR TO APPLY ADDITIONAL MOISTURE TO THE AREAS OF TEST NOS. 30,31 AND 33 AND NO RETESTS WERE REQUIRED. 25-33 ❑✓ IN OUR OPINION, FILL COMPACTION MEETS SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO.(S) ❑ IN OUR OPINION, FILL COMPACTION DOES NOT MEET SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO.(S) SCPE OF FULL CONTRA OBSERVATION: ❑ TIME, ❑✓ PERIODIC, ON CALL BASIS, 2) ADVISEDCTOR'S OR CLIENT'S REPRESENTATIVE CHRIS THERIOT FIELD REPRESENTATIVE BF CTL ITH O MPSON TEXAS, YL APPROVED BY RICH, MI SENIOR PRINCIP 10575 Newkirk Street, Suite 780 1 Dallas, TX 75220 1 Phone: 972 - 831 -1111 � . O F . r • R G 051 Q .........., I t ' IV A L 6 Vk :c:``