DR9303-CN 960611 ~.a~.,:..~¥A.~ ,,v ~ AGENDA REQUEST FORM CITY COUNCIL MEETING: June 11, 1996 ITEM ITEM CAPTION: Consideration of awarding Bid/Contract #Q-0496-01 for the construction of Moore Road Drainage Improvements DR 93-03 to M-Co Construction, Inc. in the amount of $316,908.00 and authorizing the Mavor to sign. ApP,qOVED · -,,-. y coUNCIL 81JBMII'TE~ ~' Kenneth M. Griffin, P.E. TITLE: Assistant City Manager/City Engineer INITIALS _~__ STAFF COMMENTS: See attached memo. STAFF RECOMMENDATION Approval ~ Denial EXPLANATION: Staff w~lbe availabletoanswerany questionsatthe Council meeting. BUDGET AMT.$ AMT. EST.$ +/- BUD:$ FINANCIAL COMMENTS: Funds are available ~n the Drainage CIP Account and the Escrow Account. FINANCIAL REVIEW.~_-~ CITY MANAGER REVIEW: .Agenda R~uest Form - Revised 1194 DocumLn[ Name e~.01 MEMORANDI~-! To: Mayor and City Council From: Kenneth M. Griffin, P.E., ACM/City Engineer RE: Consideration of awarding Bid/Contract #Q-0496-01 for the construction of Moore Road Drainage Improvements DR 93-03 to M-Co Construction, Inc. in the amount of $316,908.00 and authorizing the Mayor to sign. Date: May 28, 1996 On May 2, 1996, ten bids were received for the Moore Road Drainage Project. The bids ranged from S316,908 to S515,197. The attached bid tabulation shows the apparent low bidder as M- Co Construction, Inc. out of North Richland Hills. This project was designed in-house and the total cost is shared by the CiLv and the adjacem properts,' owner, Standard Pacific, via a Drainage and Escrow Agreement. In accordance with the Drainage and Escrow Agreement, the City is responsible for $130,000 of the total project cost and the owner is responsible for the balance. In 1993 there was an initial payment of $138.151.50. With interest, that amount is now $151,833.57. Based on the bid submitted by M-Co Construction and the current value of the initial deposit, there was still a short fall of $35,074.43. Standard Pacific has provided a check in that amount to the City. In conclusion, staff recommends awarding Bid #Q-0496-01 for the construction of the Moore Road Drainage Improvements to Mo-Co Construction, Inc. in the amount of $316,908.00 and authorizing the Mayor to sign. Staff will be available to answer any questions at the Council meeting. BID TABULATION MOORE ROAD DRAINAGE IMPROVEMENTS / DR 93-03 i # U Description M-Co Constr.,inc.No. Texas ~flke Albert, Inc. BCI Utility Coast. Earth Builders, Inc. Z&S Const.,lnc. J.C.Evans, Inc. Linder-Stahl, Inc. Patco Utilities, Inc. Murray Const., Inc. t n 6816 Harmomon Contracting P.O. Box 21044 Inc. 5429 Yellowstone 11423 Ravenview P.O. Box 9647 2200 Cantrell 1617 W. Hwy 303 S15 N. Kealy Ave. e I No. Rlchland Hills, P.O. Box 2~752 Bedford, TX 11346 IOinc Fi. Worth, TX 76137 Dallas, TX 75253 Austin, TX 78766 Samom Ft. Worth,Grand Prairie, TX Lewisville, TX m t TX 76180 Dallas, TX 75229 76095 Dallas, TX 75229817/498-7198 214/286=3299 512/244-1900 TX 76131 75051 75057 817/589-7601 214/3504509 817/577-8605 214/243-4764 817/232-5555 214/641-7901 214/436-4566 Price Price Pnce Price Price Price Price Price Price Price Price Pnce Price Price Price Price Price Price Price Price Pagel MOORE ROAD DRAINAGE IMPROVEMENTS / DR 93-03 Description M-Co Const.,lnc. No. Texas ContractMike Albert, inc.BC! Utility, Inc. Earth Builders,Inc. Z&S Corot, Inc. J.C. Evans, Inc.Linder-Stabl, Inc. Parco Utilities,Inc. Murray Const.,Inc. Unit Total Price Unit Price Total Price Unit Total Unit To~ Unit Total Unit Total Unit Total Unit Total Unit Total Unit Total Price Price Price Price Price Price Price Price Price l~ce Price Price Price Price Price Price Price TIOTALTHRBuI2D0&I~2~S I] $364,117.00 II ~0'~'~ I ~0"~'~ II $405,036.00 [ $434,630.00 II $412,804.00[$$35,240.00 II $$39,4:54.00 [I $$04,7~7.9~ II $489,3~2.00 CALENDAR DAYS II 100 II 100 [ 120 [I 90 II 90 140 1120 ]1 180 [[ 180 Il 100 Page2 BID AFFIDAVIT The undersigned certifies that the bid prices contained in this hid have been carefully reviewed and are submitted as correct and final. Bidder f~rther certifies and agrees to furnish any and/or ali commodities upon which prices are extended at the price offered, and upon the conditions contained in the Specifications of the Invitation to Bid. The period of acceptance of this bid will be calendar days from the date of the bid opening. (Period of acceptance will be ninety (90) calendar days unless otherwise indicated by Bidder.) STAT~- OF ~e× A $ COU~ OF T~ ~ £~. N'P B~Om~ ME, the undersigned authority, a Notary Public in and for the State of ~,'~$ , on this day personally appeared ~?C. ff~/ .'"f' /1,~,~ ;ia who after being by me Name duly sworn, did depose and say: 'x, £. cie,l?-/~,~;~ am a duXy authormd omce/agent for ~ame /~'x ~o t~'~r, c?c,'bo(.~ ~ ~e.. ~l-/dC&. and have been duly authorized to execute the Name of Firm foregoing on behalf of the said z'~ -Co O_c~,-,.~-/,~oc.~ ;'o ~ ~ Name of Firm ! hereby certify that the foregoing bid has not been prepared in collusion with any other Bidder or individual(s) engaged in the same line of business prior to the official opening of this bid. Further, ! certify that the Bidder is not now, nor has been for the past six (6) months, directly or indirectly concerned in any pool, agreement or combination thereof, to control the price of services/commodities bid on, or to influence any individual(s) to bid or not to bid thereon. NameandAddressofBidder: /~}-~t) ~'~/'L, OC~/; Cl3x SUBSCRIBED AND SWORN to before me by the above named on this the I~ day of ~.¥ Notary Public in and for the State of -~'~-~^~ UNIT PRICE BID SCHEDULE MOORE ROAD DRAINAGE IMPROVEMENTS DR 93-03 BASE BID Item Quantity Unit Description and Price in Words Unit Total No. Price Price 1 1354 LF 66" RCP Complete i~ Place.,~ ~ ~ ).~,.~-~w~I~011ars and ~-~v Cents 2 167 LF 6' x 4' Box Culvert Complete in and I~c Cents per LF. 3 239 LF 36" N-12 Storm Drain Pipe (Includes removal & replacement of about 220 LF 36"N-12 pipe and about 20 LF of 18" RCP's and headwall) Complete in Place and ~ ,~ Cents per LF. 4 10 LF 30" RCP (with plug) Comolete in Place a Cents per LF. UNIT PRICE BID SCHEDULE MOORE ROAD DRAINAGE IMPROVEMENTS DR 93-03 BASE BID Item Quantit~ Unit Description and Price in Words Unit Total No. Price Price 5 10 LF 18" RCP (with plug) Complete in Place and /~ Cen~ 6 1 LS Channel Work for 48" RCP ~a%Omplete ip place nd rix.3 Cents per LS. 7 1 EA Connect 48" RCP to Downstream Headwall ~Complete in Place. a~f ~ Cents 8 1 EA Connect 6' x 4' Box to Channel 2d~ ~ DC~ena~~ per each. UNIT PRICE BID SCHEDULE MOORE ROAD DRAINAGE IMPROVEMENTS DR 93-03 BASE BID Itgm Q~antity Unit Description and Price in Words Unit Total No. Price Price 9 I EA Cormeet 21" RCP to 48" RCP Comple~ in .Pla~:~. and h~ Cents per each. /393,e° /3 3, ,....- I 10 I EA Remove Concrete Flume Complete in~ PLace and ~ · ~ Cents per each. 11 1 EA Install Concrete Flume and ~o Cents per each. 12 1 EA Remove Storm Drain Manhole Complete in Place and ~o Cents per each. 1 - 18 ~ ~nd Contract L~IIT PRICE BID SCHEDULE MOORE ROAD DRALNAGE LMPROVEMENTS DR 93-03 BASE BID Item Quantity Unit Description and Price in Words Unit Total No. Price Price 13 2 EA Install Storm Sewer Manhole Complete in Place~ .~0,~.~ t~~ }w~Dolla~ and v ~ Cents per each. 7/o . 14 2 EA Cut & Plug 18" RCP Complete in P~la~c,e~ --/~ ~)~_ and ~ Cents per each. 15 3 EA Cut & Plug Sanitary Sewer Complete in Place and o Cents per each. 16 500 LF Pavement Repair ?~m~lete in Place ~/.F.~ ~ Dollars and v ~O Cents UNIT PRICE BID SCHEDULE MOORE ROAD DRA1ANAGE IMPROVEMENTS DR 93-03 BASE BID II I~m Quantity Unit Description and Price in Words Unit Total ' 1~o. Price Price , 17 5.6 CY 6" Rip Rap Complete in Place ~t~ Ool]a~ and l~ Cents 18 3 EA Lower Existing Water Lines Complete in P~l.aqe and ~ Cents per each. 19 75 LF Concrete Encase Existing Water Lines C.omglete !n Place '-~/,~ ~ Dollars and // f.V Cents per LF. 20 I LS Trench Safety and tt~ Cents 21 130 LF 48" RCP Complete in Plac~.~ 0,v.~,tki~ Dona~ and )txb '* Cents ~ each. 1-20 ~ ~t c~d ~c~e~s UNIT PRICE BID SCHEDULE MOORE ROAD DRAINAGE IMPROVEMENTS DR 93-03 BASE BID Item Quantity Unit Description and Price in Words Unit Total No. Price Price 22 60 LF Pavement Repair ~a~d~plete'!n Place Dollars Cents per LF. 23 11 SY Remove and Replace Sidewalk Com~plete in Place -'/'Jt~ ~ Dollars and t~D Cents per SY. 2~. 24 1 LS Hydro Mulch / Sod / Landscaping / Irrigation Complete i.n ~'~ ~'~Doffars and ,,~ Cents per us. /fao. ~o I~ I,,qo. ~ '/' TOTAL Bm rrlgMS l TItRU 24 TANGmLE PERSONAL PROPERTY COST Signature: J UNTT PRICE BID SCHEDULE MOORE ROAD DRAINAGE IMPROVEMENTS DR 93-03 ALTERNATE B~D Delete Items 21.22. 23 & 24 and Add the following: Item Quantity Unit Description and Price in Words Unit Total No. Price Price 25 130 LF Micro-tunnel or Bore 48" RCP beneath Moore Road (Including all materials) Complete in PJa.c4 .-, and rto Cents per LF. TOTAL BID ITEMS I THRU 20 & 25 TANGIBLE PERSONAL PROPERTY COST Signature: NOTE: ALL BIDDERS SHOULD SUBMIT A BID ON THE ALTERNATE 1-22 z~uat ~,~ c~,.~t om~,,~ CALENDAR TOTAL PRICE DAYS TOTAL BASE BID ITEMS In Words: 6. BIDDER agrees that all Work awarded will be completed within /00 Calendar Days. Contract time will commence to mn as provided in the Contract Documents. 7. Communications concerning this Bid shall be addressed to the address of BIDDER indicated on the applicable signature page. 8. BIDDER understands that the Owner is exempt from State Limited Sales and Use Tax on tangible personal property to be incorporated into the project. Said taxes are not included in the Contract Price (see Instructions to Bidders). 9. The terms used in this Bid which are defined in the General Conditions of the Construction Contract included as part of the Contract Documents have the meanings assigned to them in the General Conditions. The City of Coppell reserves the right to delete any portion of this project as it may deem necessary to stay within the City's available funds. Should the City elect to delete any portion, the contract quantities will be adjusted accordingly. SUBMITTED ON ~"-- ~ . 19 ~ (~ BID TABULATION MOORE ROAD DRAINAGE IMPROVEMENTS / DR 93-03 I # U Description M-Co Constr.,Inc. No. Texas Mike Albert, Inc. BCI Utility Const. Earth Builders, Inc. Z&S Const.,Inc. J.C.Evans, Inc. Linder-Stahl, Inc. Patco Utilities, Inc.Murray Const., Inc. t n 6816 Harmonson Contracting P.O. Box 21044 Inc. 5429 Yellowstone 11423 Ravenview P.O. Box 9647 2200 Cantrell 1617 W. Hwy 303 515 N. Kealy Ave. e i No.Richland Hills, P.O. Box 29752 Bedford, TX 11346 Kline Ft.Worth, TX 76137 Dallas, TX 75253 Austin, TX 78766 Samom Ft. Worth, Grand Prairie, TX Le~sville, TX m t TX 76180 Dallas, TX 75229 76095 Dallas, TX 75229 817/498-7198 214/286-3299 512/244-1900 TX 76131 75051 75057 817/589-7601 2141350-4509 8171577-8605 2141243-4764 817/232-5555 214/641-7901 2141436-4566 Unit I Total Unit ] Total Unit I Total Unit I Total Unit Total Unit[Total Unit Total Unit I Total Unit Total Unit Total Price Price Price Price Price Price Price Price Price Price Price Price Price Price Price Price Price Price Price Price i 1354 LF 66' RCP 133.00 180.082.00 160.00 216.640.00 169.00 228,826.00 160.00 216.6a0.00 145.00 196,330.00 168.00 ,~7..t.,..00 250.00 338,500.00 225.00 304,650.00 201.50 272.831.00 201.00 272.154.00 2 167 LF 6'x4' Box Culvert l~t7.00 24,549.00 16400 27.388.00 165.00 27.555.00 190.00 31.730.00 180.00 30,060.00 189.00 31.563.00 230.00 38,410.00 230.00 38.a10.00 2.,t0.15 40.105.05 205.00 34.235.00 3 239 LF 36' N-12 Storm Drain Pipe 79.00 18.881.00 60.00 14.340.00 64.00 15.296.00 79.00 18.881.00 100.00 23.900.00 96.00 22,944.00 70.00 16.730.00 174.00 -11,586.00 62.10 14.841.90 76.00 18.164.0( 4 10 LF 30' RCP .t4.00 440.00 60.00 600.00 92.00 920.00 50.00 500.00 40.00 400.00 59.00 590.00 55.00 550.00 77.00 .-'-70.00 50.00 500.00 68.00 680.00 5 10 LF 18' RCP 28.00 280.00 50.(]0 500.00 76.00 760.00 35.00 350.00 .~_5. CiO ~'iO.00 35.00 350.00 50.00 500.00 51.00 510.00 35.00 350.00 56.00 560.00 6 I LS Channel Work 48' RCP 4.800.00 4.800.00 5,000.00 5.000.00 6,700.00 6,700.00 7.200.00 7._-~0.00 12.000.00 12.000.00 8.500.00 8,500.00 5,000.00 5.000.00 6,300.00 6,300.00 10.950.00 10,950.00 5,600.00 5,600.00 7 I EA Conre. ct -18' RCP 5..120.005.420.00 6,000.00 6,000.00 5.600.00 5.600.00 7.150.00 7,150.00 10.000.OO 10,000.00 2,500.00 2.500.00 5.000.00 5.000.00 5,000.00 5,000.00 25.000.00 25.000.00 5.200.00 5.200.00 8 ; EA Connec,, 6'x4' Box to4,400.00 4.400.00 2.000.00 2.0L¥3.00 1.200.00 '..200.00 6.000,00 6.000.00 5.550.00 5.550.00 2.500.00 2.500.00 6.000.00 6.00000 6.!00.00 6,100.00 4.500.00 4.500.00 6.500.00 6.500.00 Channel 9 I EA Connect 21' RCP to 48' 1.393.00 1.393.00 riO0.00 600.00 600.00 600.00 1.600.00 1.600.00 700.00 700.00 500.00 _~0.00 500.00 500.00 540.00 5-g).00 500.00 500.00 700.00 700.00 RCP 10 I EA Remove Concrete Flume180.00 180.00 100.00 I00.00 3~0.00 300.00 400.00 -q}O.00 10.00 lO.00 2.500.00 2.500.00 500.00 500.00 325.00 325.00 350.00 350.00 -150.00 450.00 11 I EA Instal! Concrete Flume 795.00 795.00 500.00 500.00 400.00 400.00 600.00 600.00 I00.00 100.00 2.500.00 2.500.00 2.000.00 2.000.00 465.00 465.00 1,250.00 1,250.00 650.00 650.00 12 I EA Remove Sugm Drain 270_00 270.00 1.000.00 1.000.00 1,800.00 1.800.00 850.00 850.00 200.00 200.00 2,000.00 2.000.00 500.00 500.00 4.000.00 4,000.00 2.000.00 2.000.00 650.00 650.00 Manhole 13 2 EA Imtall Storm Sewer 7,100.00 14.200.00 6,000.00 12.000.00 6.000.00 12.000.00 6."/00.00 13.400.00 18.000.00 36.000.00 8.500.00 17.000.00 7.000.00 14.000.00 4.950.00 q.900.00 9.450.00 18.900.00 4.375.00 8,750.00 Manhole 14 2 EA Cut & Plug 18' RCP 162.00 324.~O 250.00 500.00 100.00 200.00 300.00 600.00 150.00 300.00 500.00 1.000.00 500.00 1,000.00 210.00 420.00 350.00 700.00 110.00 220.00 15 3 EA Cut & Plug SS 130.00 390.00 500.00 1.500.00 100.00 300.00 100.00 300.00 100.00 300.00 1.500.00 .1,500.00 500.00 1,500.00 98.00 294.00 150.00 450.00 150.00 450.00 16 500 LF Pavement Repair 49.00 24.500.00 76.00 38.000.00 45.00 22.500.00 40.00 20,000.00 62.00 31.000.00 55.00 27,500.00 50.00 25,000.00 78.00 39.000.00 60.00 30,000.00 85.00 42,500.00 17 5.6 CY 6' Rip Rap 330.00 1.8,/.8.00 450.00 2 520.00 500.00 2.800.00 350.00 1,960.00 50.00 280.00 200.00 1,120.O0 500.00 2.800.00 390.00 2.18-L00 550.00 3.080.00 315.00 1.764.00 Pagel I # U Description M-Co Const.,lnc. No. Texas Contract Mike Albert, Inc. BCI Utility, Inc. Earth Builders,Inc. Z&S Const, Inc. J.C. Evans, Inc. Linder-Stahl, Inc. Patco Utilities,Inc. Murray Const.,Inc. t n e i m t Unit Total Price Unit Price Total Price Unit Total Unit Total Unit Total Unit Total Unit Total Unit Total Unit Total Unit Total Price Price Price Price Price Price Price Price Price Price Price Price Price Price Price Price Price 18 3 EA Lower Existing WL 2,025.00 6.075.00 2.500.00 7.500.00 2,500.00 7.500.00 2,300.00 6.900.00 1,800.00 5.400.00 5.000.00 15,000.00 2,000.00 6,000.00 2,690.00 8.070.00 4,800.00 14,~00.00 1,500.00 4,500.00 19 75 LF Concrete Encase Exist / 46.00 3,450.00 30.00 2.~,~50.00 25.00 1.875.00 15.00 1.125.00 50.00 3.750.00 55.00 4.1~,L5.00 10.00 750.00 14.00 1.050.00 30.00 2.250.00 25.00 1,875.00 WL 20 I LS Trernch Safety 2.160.00 2,160.00 3,000.00 3,000.00 2,500.00 2.500.00 1.000.00 1.000.00 4,000.00 4.000.00 2,500.00 2,500.00 5.000.00 5.000.00 9,300.00 9.300.00 2.000.00 2,000.00 2,500.00 2.500.00 21 130 LF 48' RCP 139.00 18.0'/0.00 IO5.00 13,650.00 160.00 20.800.00 350.00 45,500.00 160.00 20.800.00 95.00 12,350.00 160.00 20.800.00 124.00 16.120.00 360.00 46,800.00 750.00 97,500.00 22 60 LF Pavement Repair 49.00 2.940.00 126.00 7,560.00 120.00 7.200.00 50.00 3.000.00 62.00 3.~0.00 50.00 3,000.00 50.00 3,000.00 64.00 3,840.00 200.00 12,000.00 85.00 5.100.00 23 11 SY Remov¢/ReplaceSidcwalk 31.00 341.00 30.00 330.00 50.00 550.00 25.00 275.00 22.00 242.00 50.00 550.00 35.00 385.00 63.00 693.00 35.00 385.00 45.00 ,195.00 24 I LS Hydro Mulch/Irrigation 1,120.00 1,120.00 500.00 500.00 2,700.00 2,700.00 2.000.00 2,000.00 3,000.00 3.000.00 20,000.00 20,000.00 2,000.00 2,000.00 260.00 260.00 4,500.00 4,500.00 4,000.00 4,000.00 Sod. Landscaping 25 130 LF Micro-tunnel /Bore 48' 536.00 69,680.00 525.00 68.2-~.00 475.00 61,750.00 545.00 70.850.00 570.00 74,100.00 278.00 36,140.00 500.00 65,000.00 466.00 60,580.00 ~60.00 59.8(10.00 625.00 81.?L'.~.00 TOTAL BID ITEMS $316,908.00 $363,978.00 $370,882.00 $2t87,961.00 $388,292.00 $412,564.00 $496,425.00 $499,787.00 $508,642.95 $515,197.00 1 TItRU 24 TOTAL BID ITEMS $364,117.00 $410,188.00 $401,382.00 $408,036.00 $434,630.00 $412,804.00 $535,240.00 $539,454.00 $504,757.95 $489,352.00 I THRU 20 & 25 ICALENI)AgOAYs II 100 II 100 II ,~0 II ~0 II ~0 II 140 II 120 Il 180 II 180 II ,00 I Page2