Loading...
WA9903-CS000608SHIMEK, JACOBS & FINKLEA, L.L.P. CONSULTING ENGINEERS 8333 Douglas Avenue, #820 Dallas, Texas 75225-5816 Fax(214) 361-0204 Phone (214) 361-7900 RONALD V. CONWAY, P.E. JOHN W. BIRKHOFF, P.E. JOE R. CARTER, P.E. GARY C. HENDRICKS, P.E. PAUL A. CARLINE, P.E. MATr HICKEY, P.E. ROSS L. JACOBS, P.E. I.C. FINKLEA, P.E. June 8, 2000 Mr. Steve Dak Architec Utilities, Inc., d.b.a. AUI General Contractors 3 00 amsey Re: City of Coppell Addition of Pump Number 4 to the Village Parkway Pump Station Dear Mr. Dake: A walk-through of the referenced project was completed today. The following punch list was prepared regarding the items needing completion. 1. At the pump control panel in the pump room. Three clear lens caps need to be replaced with one blue and two white lens caps on the buttons. 2. Three 3A-inch conduit covers need to be installed on conduits at the pump motor. 3. Minor paint touch-up work needs to be completed. 4. A screw hole on the air vent to the pump motor needs to be re-tapped and a new screw installed. 5. A minor leak on the discharge piping needs to be corrected. The leak is located where the 90-degree bend attaches to the discharge header. 6. Two additional grease firings need to be provided on the pump. 7. O & M manuals need to be provided to the City for the Badger Meter and the Benshaw starter. 8. A Hi-pot test report needs to be provided to the City from Shermco for the cables. 9. Label plaques for pump number four need to be provided on all electrical equipment pertaining to pump number four (Benshaw starter, etc.). If you have any questions, please contact us. Sincerely yours, pa~(IA.~lin CC: j:Xclerical\coppell\1999-153\letters\constXk\punchlist.doc