Loading...
DR9303-AG 940222 AGENDA REQUEST FORM [ ITEM CAPTION: Discussion and consideration of rejecting Bid # (}-0993-01 received for the Moore Road Drainage Improvements {DR 93-03) assoeiated ,zith the intersection of Moore Road and Sandy Lake Road. ~ ~ ' STAFF REP.: k,.K~nn~th ~,! C~r,ffln, P 1Z i~ ~L~ ~1 neet . AP:PRO VED ~ ~, DATE: Feb~a~ 14, 1994 lnters~tion. This prn~t w~ d~ign~ in-house an~ was a~oint cost participation betw~n the Cit~ of Cop~ll an~ the property owner, Ms. Barbara Austin. ~ part of the award of this ~ntraet, a Drainage and ~erow Agr~ment was n~d~ betw~n the City and Ms. Austin. The aetoal ~ording in the contract h~ b~n agr~d upon, however, there is a concern on Ms. Austin's part that she should not ex,ute the eontrREt until such time ~ the Municipal Utility District h~ authorized her annexation into the ML~ so that she ~n get se~'er service to her property. The sewer service to her property is eriti~l for the sale and development of her property. It w~ anticipated that the 31L~ issue would be worked out prior to now, therefore, the Purchasing Department ~nlaeted the bidde~ on the ~ro~t lo have them extend their bid. The bid extension expir~ on February 24, 19~4. It is unlikely that the bids ~uld be extended again. The bidders have had their bid bnnds tied u~ for approximately $ months pl~ there could have b~n some shift in the pricing of the bid items. Therefore, staff r~ommends that all bids submitte~ for Bid ~ Q~93~1 for Moore Road Drainage Im~rovemen~ ~R ~3~3) be related by City Council. Staff will be rebidding this pro~t sometime in the n~r future. Staff will be available to answer any qu~tions concerning this pro~t. BUDGET AMT. AMT. ESTIMATED AMT. +/- BUDGET FINANCIAL REVIEW BY ~c~-~- LEGAL REVIEW BY: REVIEWED BY CM' AGENDA REQUEST FORM REVISED ~ 93 Rev. 4-.'4-~ SL_.~-~OR'[ DOCUMEN'fATION FOR AGENDA ITEl4 STAHP ~ECEIVED BY CITY ¥~NAGER' _,FFICE: ' ~ SUPPORT DOCh~NTATION SUBNITTED ~ITI~ AGENDA ITh~: ~IO. OF ORIGINALS REQUIRED MEMOS / LETTERS/REPORTS/BILLS/HINUTES: /1 each COh~fRACT/AGRE~HENT ................. : 3 originals for signature C.I.P. CONTRACT ..................... : 6 originals for signature CKANGE ORDERS ....................... : 3 originals for signature ORDINANCE ........................... : 1 blueback for signature + 3 copies CAPTION ............................. : I blueback for signature + 3 copies P~SOLUTION .......................... : 2 blueback~ for signature + 1 copy PROCLA~TION ........................ : 2 bluebacks for signature + I copy BID ................................. : I each LOCATION NAPS ....................... : 12 ZONING PLANS ........................ : 12 PRELININARY/FINAL PLATS ............. : 12 SITE PLANS .......................... : 12 LANDSCAPE PLANS ..................... : 12 ARCltITECTuKAL RENDERINGS ............ : 12 DATE PUBLISHED IN TIlE CITIZENS~ ADVOCATE: NOTIFICATION TO: DATE/METHOD OF C0FrI~T: I~OTE8 2ND SH~T. 0588DS ]~NTEROFFICE ME3,IORANDI_ .13,! February 4, 1994 Ken Griffin Engineering Karen Doelling '~x~-~ ~-x..-: . Purchasing Bid Q-0993-01, Moore Road Drainage The bid. Q-0993-01, will lapse on Februa~, 24, 1994. BIDDING ~ CONr~,ACT DOCUMrr. J¢~ BID FOKM PROJECT IDENTI~CATION: ~ ~ D~ ~~ - DR 93~ ~ ~, T~ ~ OF ~ ~o ~ ~ BID Q-0993-01 MOORE ROAD DRAINAGE IMPROVEMENTS AI-2 886 B.F.'Concrete Plvement RepMr 87.00 I $6,196.00 812.60 811,062.EO 87.60 IS,e37.EO tS.~O 14,R67.60 88.00 $7,0~0.00 86.00 14,42E.00 14.EO t3,le2.EO i 14.00 I $3,540.00 CA LENDAR DAYS; I 90 I Z0 150 I ~E 180 ~0 1001 TOTAL lid nEIVll I THRU 23, 2~ & ALL ADDENDUMI 1343,51 ~.0O e407.--7.7S 1337,/41.S0 i 14~;,leO.OO tSe4,2O0.00 13~,4a~ao l$11AI~.6O i ~324,77s.00 TANGIBLE PERSONAL PROPERTY COST 1223,000.00 $1e2,000.00 1200,0OO.00 $190,000.00 $200,443.00 elSS,4el.O0 elSe,sge.00 i CALENDAR DAYSi i ~O 120 160 150 tRO 120 t001 ' i UNIT PRICE BID SCHEDULE MOORE ROAD DRAINAGE IMPROVEMF..N'~ DR 93-03 BASE BID lu=m Quantity Unit De~ctil~On ~md Price in Words Unit To{al No. Price Price I 1350 L.F. 66' RCP Compl~a= in Phce /~. ~ ~/.~o.-o Com~ i~ Phce 4 ~ L.F. 48" RCP ~m~ ~ P~ ~ ~F. 5 10 L.F. ~" R~ UNIT PRICE BID SCHEDULE MOORE ROAD DRAINAGE IMPRO~ DR 93-03 BASE BID Item Qvant4t~ Unit Deacriptioa and Price in Words Unit Total No. Price Price 6 10 L.F. 18' RCP Comi~ctc in Place 7 2 EACH 10' Inkt ~ .~ - . ~/ i. ff O. ~ 8 2 EACH Type 'B' Modified Hendwnil (54' & 4~' RCP) 9 I LS. Channel Work for 48' RCP per L.S. 555ff, ' 5%--5-'. 10 I EACH Connect 48' RC.P to UNIT PRICE BID SCHEDULE MOORE ROAD DRAINAGE IMPROVEMENTS DR 93-03 BASE BID l~m (Immit~ Unit Der~i~ and Price in Words Unit Total No. Price Price 11 I EACH Connect 6x4 Box to Channel and ~u', Cents /~, ~"C. ~'' .-,,l ~-C. per F_~h. ~-. 13 I EACH R~nove Concre~ Flume ~t~O.~' UNIT PRICE BID SCHEDUI.~ MOORE ROAD DRAINAGE IMPROVEMF=N~ DR 93-03 BASE BID Item Q~ntity Unit ~ and ~ in Words Unit To~l No. Price 16 2 EACH ~ Stm'm Sewer Manho~ 17 2 EACH Cut & Plu~ 18' RCP ,, 18 3 l~CH Cut & Plug Sanimy ~ ~ E~a. ' Ig-d. u'~ 19 900 S.F. Pavmnmt R,cpair pm' $,, .l~~ C, mm 2O 3OO C.Y. UNIT PRICE BID SCHEDULE MOORE ROAD DRAINAGE IMPROVF. blF2q'rs DR 934)3 BASE BID l~em Quantity Unit De~o'iplion and Pric~ in Words Unit Tolai No. Price Price 22 75 L.F. Conc~ F.~-~....ne ~ W~ ~ 1~ L.F. 23 I L.S. Trench Sagety 24 130 L.F. 48' RCP UNIT PRICE BID SCH~r)ULE MOORE ROAD DRAINAGE IMPROVEMENTS DR 93-03 BASE BID Item Quantity Unit Description and Price in Words Unit Total No. Price Price 26 11 S.Y. Remove and Replace Sidewalk C9. mpletg in Place 27 500 S.F. Hydromnich/Sod Complete in Place V ~..~5~'' Dollars pe~ $.F. o9, '~ UNIT PRICE BID SCHEDULE MOORE ROAD DRAINAGE IMPRO~ DR 93-03 ALTERNATE BID Items 24, 25, 26, & 27 and Add the following: Item Quantity Unit Description and Price in Words Unit Total No. Price Price 28 130 L.F. Micro-runnel or Bore 48' RCP Comple.~ in Place per L.F. TANGIBLEPERSONALPROPE~TYCOST $ ?4q; DATE: SEFFF_,MBER 21,1993 ADDENDUM NO.: ONE (1) PROJECT: MOORE ROAD DRAINAGE IMPROVEMENTS (DR 93-03) BID DATI~/TIME: SEPTEMBER 27,1993 O 10:00 am NO. 1: Pages 23, 24 & 25 of the Bidding and Contract Documents should be replaced with the attached pages 23, 24 & 25. The change is the addition of t~e nme tlmt all addendums should be included in the total bid. NO. 2; Add the following bid i~ms. Tho price for these bid i~ms should be included in the total price for both the ini~al bid and the alternate bid. Rcm Quantity Unit Descriptio~ and Price in Words Unit Total No. Price Price AI-I 525 S.F. Temporary Asphalt Pavement ReFair S.F. Al-2 885 $,F. Concre~ Pavement Repair CompleX. ~n Piac~ Al-3 230 $.F. Brick Paver Pavement Rgpair per $.F. ~c. ~O / ?~, ~'~ DI~-gCRlPTION OF PAY Al=l: Temim-ar~ As~alt Pavement ~ This pay item shall consiat offl~ repair of the driveway on the east side of Moore Pami that ~ fl~ ainmm~nt comi~x (aborn 50 linmr f~t). nq~air slMl sene~dly conforln to. tl~ smmdard City of Coppell derail s~own on page SD3 of tho Standard Conmucfion Domils wi~h th~ following &) replaoo tho 6' ooncrete cap wi~ 6' of flex Imso The meaauremmt and paymmt shall be on fire basis of tho bid price per S.F. and and any incidentals neoessary to oompi~o ute work. BID SUMMARY TOTAL PRIC~ CALFNDAR DAYS TOTAL BID n'm~lS ~ THRU2? $ .~7// 5~,/, ~¢ / ALTERNATE BID TOTAL Bm ITF,~ ~Tm~U~&U s $1i,~57. '° s i4~5~oc'. ~ x.../../ /"/5 ,,h.. ,' ;/5 7. Communications concernin~ this Bid shall be addre~ed to thc address of BIDDER 8. ~tmDIER unde~mnds ~hat the Owner is ~empt from Slate limited Sale~ and Use Tax on tangible personal propm~ to be incot~e~a~d into m." lwoject Said la~ are m included in the Comra~t Pri~ (See Insma~m to Bidde~). 9. The *.-~.,~ used in this Bid which are defined in the General Conditions of the Th~ City of CoppeU reaetves the right to delete any portion of this project as it may deem necessary to stay within the City's avaUablg funds. Should th~ Cit~ elect to dgig~ any ~, the ~onum quan~i~i~ will be adjusted .a:axqdin~ly. BID AFFIDAVIT co~min~ ./n th~ Specificatiem of the Invim/~ to BM. Th~ pgri~l of accgpmn~ of th~ bM. will be ~/~ calmiar days from th~ date of the bid opening. (PukM of acceptan~ will b~ ninepj (90) ca,l~nd~r days unk~ o~bawisc indicaxed by Bidder.) STAT~ OP ,~g×~c~ COUm"Y OF duly swe~n, did dRn~ and ,my: NAMIi OF ~ ~COmm~ai*k~ bid oa, eg Io i~u~m:e any individual(s) m bid ~ not m bM Icmm ml Addmm o~ Bidd~. ~T~-C O ~ ~W~ Nmq ~br~. State 0f T~S ~ ~ ~ ~ If BIDDER IS: ~ Inttivitl~l By (Individual's Name) Ptm~io, (Seal) (~irm (Genrad Panm:r) ~/~, /~ ~ ~." ( ) ~) (~) ~) (~) ~~a~m~t~~~~~.) 11. City Manager's Report. There was no report under this 12. Mayor's Report. A. Mayor Morton announced that the Police Department will host a farewell reception on Friday, February 25, 1994 for Captain Iodd Renshaw who will be leaving Coppell to become the Chief of Police of Frisco, Texas. 13. Liaison Reports. Citizen's Recognition Commission -- Councilmember Stahly thanked Kathy Bowling for her leadership and help in putting together the reception honoring former Mayor and Councilmembers. YMCA -- Councilmember Stahly announced that the sustaining drive had been completed and a goal had been attained of $65,000.00. Library Board -- Councilmember Watson stated that Friends of the Library were beginning their funding drive for the new library and encouraged eve~'one to participate. Councilmember Reitman recognized the Boy Scouts who were in the audience fulfilling a merit badge requirement. Councilmember Garrison reminded everyone of the Coppell Chamber of Commerce Gala which will be held on March 5, 1994. CONSENT AGENDA 14. Consider approval of the following consent agenda items: A. Consider approval of minutes: February 8, 1994 B. Discussion and consideration of appointment/re-appointment of the Municipal Court Judge and authorizing the City Manager to negotiate a contract. C. Consider approval of a Resolution appointing Election Judge Jeanne Heath and Alternate Judge Martha Jo Cozby for the Municipal Officer Election to be held Saturday, May 7, 1994. D. Consideration and approval of an agreement with Ray Associates, Inc., to conduct a salary/benefits survey and related work in the amount of $11,910.00, with an additional option, to be exercised at the City Manager's discretion, in the amount of $3,520.00, and authorizing the City .Manager to sign. E. Consider approval of appropriating up to $4,480 to proceed with renovations to Council Chambers, as previously discussed at last Council meeting. F. Consideration of rejecting Bid # Q-0993-01 received for the Moore Road Drainage Improvements (DR-93-03) associated with the intersection of Moore Road and Sandy Lake Road. CM0222~4 Page 3 of 4 G. 1) Consideration to contract services to provide nlaintenance to Class A landscaped medians, and to provide services as described in Alternate ,v2 ~ith X~IC Landscape Services in the amount of $29,121..00 during the 1993-94 fiscal )'ear. 2) Consideration to contract services to provide maintenance to Class B landscaped medians, the Grapevine Springs Park site, and to provide services as described in Alternate #3 with The Green Company in the amount of $17,924.30 during the 1993-94 fiscal year. Consideration of a request by' M.J. Designs for a variance to the subdivision Rules and Regulations to allow a maximum driveway width of 50 feet for an industrial driveway instead of 40 feet. Items 14 B and D were pulled for further consideration. Items 14 A, C, E, F, G and H: Councilmember Garrison moved to approve Items 14 A, C carrying Resolution No. 022294.1, E, F, Gl, G2 and H. Mayo." Pro Tem Robertson seconded the motion; the motion carried 7-0 with Mayor Pro Tem Robertson and Councilmembers Weaver, Stably, Watson, Reitman, Mayo, and Garrison voting in favor of the motion. Item 14 B: City Manager Jim Witt addressed the Council and recommended approval of this item. Mayor Pro Tern Robertson moved to appoint Marian Moseley and authorize the City Manager to negotiate a contract. Councilmember Garrison seconded the motion; the motion carried 7-0 with Mayor Pro Tern Robertson and Councilmembers Weaver, Stably, Watson, Reitman, Mayo, and Garrison voting in favor of the motion. Mayor Morton swore Judge Moseley into office. Item 14 D: Councilmember Reitman moved to approve Rem 14 D with an amendment stating that the contract will begin 2!16/94 with Phase I to be completed by 4/26.'94 and the balance by 5/9/94. Mayor Pro Tem Robertson seconded the motion: the motion carried 7-0 with Mayor Pro Tern Robertson and Councilmembers Weaver. Stably. Watson. Reitman, Mayo, and Garrison voting in favor of the motion. There being no further business to come before the City Council. the meeting was adjourned. Tom Morton. Mayor ATYEST: Dorothy Timmons, City Secretary CM022294 Page 4 of 4