TR9301-CS 930318From the g¢~k ~j,..
Ken Griffin, P.E,
City of Coppell * PO Box 478
Coppell, Te:a~ 75019
Telephone: 214 462-0022 (Metro 214 471-2251)
The ~,tv W~tf: A BeautiftH Future
March 18, 1993
Mr. Bruce Naghavi, P.E.
Arjang Systems, Inc.
9200 Sovereign Row
Dallas, TX 75247
RE: MacArthur Blvd ~ Samuel Blvd.
Bethel Road ~ Coppell Road
Traffic Signalization
Dear Bruce,
Enclosed for your information and signature are three copies of Change Order #1 for the
captioned project.
If these quantities and prices meet with your approval, please execute all three copies and return
two to us at your earliest convenience so that we may proceed with the work.
Thank you for your cooperation and if you have any questions, please do not hesitate to call.
Sincerely,
Project Inspector
file/bethchgo
CITY OF COPPELL ~
CHANGE OR EXTRA WORK ORDER
PROJECT:
Traffic Signal Installations
MacArthur Blvd. @ Samuel Blvd. &
Bethel Road @ Coppell Road
CONTRACTOR: Arjang Systems, Inc.
OWNER:
City of Coppell
CHANGE ORDER NO.: 1
DATE: 3/17/93
CHANGE OR EXTRA WORK TO BE DONE
Installation of a single pole foundation and related conduit
work and removal of the existing foundation:
Installation of Opticom detector, conduit, and Opticom
cable on power pole across from Fire Station:
Installation of three steel posts with 3' projection above
ground at $125.00 each for a total of:
$ 1,885.00
$ 1,080.00
$ 375.00
Total cost of proposed changes: $ 3,340.00
Previous contract amount
Net increase in contract amount
Revised contract amount
Original time of completion
Revised contract time of completion
$ 118,142.40
$ 3,340.00
$ 121,482.40
120 Calendar Days
No Change
The contractor hereby accepts this Contract adjustment as a final and complete adjustment in full
accord and satisfaction of all past and future liability originating under any clause in the Contract
by reason of this revision to the Contract.
ttt~;//ap,,v~mmended I>v the City Engineer:
~greed to by the Contractor:
Date:
A~ptedb~~ ~ /~ !
Date:
Nar ib.i395
Mr. Garretk D Campbell Sr
En¢ineering 7;ept..
City of Coppe!l
Coppe]l,Texas
Re : Price Proposal for Relocation of Traffic Signal
at Bethel Pd. And Coppe]l Rd, and Opticom installation.
Foundation
Dear Garreth:
This quote is prepared per your request for installation of a new
foundation at Bethel Rd. And Coppell Rd. in front of Texaco
Station at the S.E. Corner. This work also involves removal of
the recently ins%ailed foundation to a depth of 6" under,round
and placement of gravel after removal.
Installation of a single pole foundation and related conduit .ork
and removal of the existing foundation: $1885.00
Installation of Opticom detector,conduit,and ODticom
cable on po~er Dole across from Fire Station:
Installation of three steel posts with 3' ~ro3ection
above ~round at $125 00 EA. for a to%al of:
$1080. O0
$ 375.00
$3340.00
To%al cost of proposed changes:
For any questions concernin~ thi~ quotation please contact us for
clarification.
Sincere ty,~ ~ ¢~.-'
B~uce Naghavi --
,200 ~O~,I,]REIGN l(O'~ · I)AI,I,AS, TEX.%S 7.5217 · I'IIONE: 1214)951-0401 · FAX~ (214)9,51-04.(