SS9901-CS001205Agenda
City of Coppell
DeForest Wastewater Lift Station and Force Main Improvements
TC&B Job No. 15-30041-001
Progress Meeting No. 1
December 5, 2000 @ 2:30pm
1. Wastewater Flow Evaluation Report.
2. Lift Station Improvement Alternatives:
LS-1 New Lift Station.
LS-2 Temporary lift station during renovation of existing lift station.
LS-3 Renovate existing lift station while it is in operation.
3. Odor Control Research
Carbon Canister Adsorption System.
Traditional Carbon Adsorption System.
Biofilters.
4. Force Main Alternatives.
FM-I Run parallel 24" force main to Samuel Street and parallel the
existing 21" gravity sewer and 27" gravity sewer to Sandy Lake Lift
Station with an additional 21" and 27" gravity sewer.
FM-2 New 30" force main to Samuel Sand and parallel the existing 21"
gravity sewer and 27" gravity sewer to Sandy Lake Lift Station with an
additional 21" and 27" gravity sewer as in FM-1.
FM-3 New 30" force main in MacArthur Boulevard and parallel the
existing 27" gravity sewer to the Sandy Lake Lift Station with an
additional 27" gravity sewer.
FM-4 New 30" force main in MacArthur Boulevard to the existing Sandy
Lake Lift Station wet well.
FM-5 New 30" force main in MacArthur Boulevard to the existing force
main out of the existing Sandy Lake Lift Station.
5. Project Schedule
6. Schedule Site Visit
6. Additional Items
,P:\Coppell\OeForest Lift Stotlon\DCN\ALT_LS_I.DCN 12/05/00
{.l;;; .... EXIST, 24"INTERCEPTOR SEWER
C)
EXIST. 16" RAW SEWAGE M~N
TEMPORARY
LFT STATION
MODIFY EXISTING
LFT STATION
ICONNECT TO EXISTING
FORCE MAIN
DEFOREST ROAD
N
SCALE FEET
0 30 60
ALTERNATIVE LS-2
CITY OF COPPELL
DEFOREST WASTEWATER LIFT STATION
& FORCE blAIN IblPROVEblENTS
Turner Collie ~Braden Inc.
ENGINEERS · PLANNERS · PROJECT MANAGERS
MODIFY EXISTING
LIFT STATION IN PHASESI
DEFOREST ROAD
N
SCALE IN FEET
0 30 60
ALTERNATIVE
CITY OF COPPELL
DEFOREST WAST£WATER LIFT STATION
& FORCE MAIN IIIIPROVEt,,IEIfTS
Turner Collie ~'Braden Inc.
ENGINEERS · PLANNERS · PROJECT MANAG[RS
.L
EXISTING 16"
& NEW 24" FORCE MAIN
FORCE MAIN
21" GRAVI f SEWER
LLEL 21 ;RAVITY
SANDY LAKE ROAD
EXISTING 27" GRAVITY SEWER SEWER
& NEW PARALLEL 27" GRAVITY
'EW~ER
LIFT STA~,~.
ALTERNATIVE FM-I
CITY OF COPPELL
DEFOREST WASTEWATER LIFT STATION
& FORCE MAIN IMPROVEMENTS
Turner Collie ~Braden Inc.
ENGINEERS · PLANNERS · PROJECT MANAGERS
-J.
-)
NEW 30" FORCE MAIN
21" GRAVI SEWER
_LEL 21"iGRAVITY
EXISTING 27" GRAVITY SEWER SEWER
& NEW PARALLEL 27" GRAVITY
~ WASTE¥/A-TE R
LIFT STA'T.],O.N,.
ALTERNATIVE FI~-~_
CITY OF COPPELL
DEFOREST WASTEWATER LIFT STATION
& FORCE WAIN IMPROVEI~ENT5
Turner Collie ~Braden Inc
ENGINEERS * PLANNERS · PROJECT MANAGERS
.L
I NEW
30" FORCE MAIN
SANDY LAKE ROAD
LIFT
EXISTING 27" GRAVITY SEWER 1
& NEW PARALLEL 27" GRAVITY SEWER
J
rER
ALTERNATIVE Flit-3
CITY OF COPPELL
DEFOREST WASTEWATER LIFT STATION
& FORCE IIIAIN IIitPROVEIdENTS
Turner Collie ~'Braden Inc
ENGINEERS · PLANNERS · PROJECT MANAGERS
J_
SANDY LAKE ROAD
F"J'"'T'"T ~"i"' i~
NEW 30" FORCE MAINI
E'I~ATER
ALTERNATIVE FI~-4
CITY OF COPPELL
DEFOREST WASTEWATER LIFT STATION
& FORCE MAIN IltPROVEJtENT5
Turner Collie ~Braden Inc.
ENGINEERS · PLANNERS · PROJECT MANAGERS
I
TNTTITr~ [\ \ .~x x
ii
'
SANDY LAKE ROAD
~ ~td
~__ s, I L~...LM ......
~_;ii_.ii~
~--]
i~.i~i!!.L~..Li~ i! l/ ~
NEW 30" FORCE MAIN]
i__ LIFT STA
TIE INTO
EXISTING 30"
F.M. TO TRA
ALTERNATIVE FtZ-5
CITY OF COPPELL
DEFOREST WASTEWATER LIFT STATION
& FORCE MAIN IMPROVEMENTS
Turner Collie ~Braden Inc.
ENGIN[ERS · PLANNERS · PROJECT MANAGERS
4000
4000 Feet ~',,,,~.