Loading...
Minyards Freeport Xing-CS090217 THE.CITY.OF COPPELL February 17, 2009 Robert Robinson C F. Jordan, L.P 9639 Greenville Ave. Dallas, TX 75243 RE: Minyards Addition (Freeport Crossing) Final Walk-thru Dear Mr. Robinson: Please be advised that a walk-through has been scheduled for Monday, February 23,2009 at 9:00 a.m. for the water, sanitary sewer, paving and drainage facilities in the referenced project. Please ensure that all facilities are clean and accessible at that time and that contractor I s representatives are present to assist with the inspection. Your cooperation in this effort is greatly appreciated. If you should have any questions, please call 972-304-7090 at your earliest convenience. Sincerely, ~ 0' J.0&J..../ ef^- Rick 0' Dell Construction Inspector Office Phone: (972) 304-7090 Fax: (972) 304-3570 cc: Ken Griffin, P.E., Dir. of Engineering & Public Works Glenn Hollowell, P.E., Asst. Dir. of Public Works Lee Stone, Commercial Building Inspector Tim Oates, Deputy Chief/Prevention 255 PARKWAY * P,O.BOX 947B * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673